CN203728863U - Closed circulation cooling system for blast furnace - Google Patents

Closed circulation cooling system for blast furnace Download PDF

Info

Publication number
CN203728863U
CN203728863U CN201420079340.3U CN201420079340U CN203728863U CN 203728863 U CN203728863 U CN 203728863U CN 201420079340 U CN201420079340 U CN 201420079340U CN 203728863 U CN203728863 U CN 203728863U
Authority
CN
China
Prior art keywords
endless tube
cooling system
circulation cooling
closed circulation
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420079340.3U
Other languages
Chinese (zh)
Inventor
张广进
李娇
刘新章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ansteel Engineering Technology Corp Ltd
Original Assignee
Ansteel Engineering Technology Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ansteel Engineering Technology Corp Ltd filed Critical Ansteel Engineering Technology Corp Ltd
Priority to CN201420079340.3U priority Critical patent/CN203728863U/en
Application granted granted Critical
Publication of CN203728863U publication Critical patent/CN203728863U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model relates to a closed circulation cooling system for a blast furnace. The closed circulation cooling system comprises an air cooler I, air coolers II, a filter I, a filter II, a degassing tank I, a degassing tank II, an annular drain pipe I, an annular drain pipe II, an annular water supply pipe I, an annular water supply pipe II, a circulating water pump I and a circulating water pump II, wherein the degassing tank I, the air cooler I, the filter I, the circulating water pump I, the annular water supply pipe I, the annular drain pipe I and the degassing tank I are connected; the circulating water pump I is further connected with the annular water supply pipe II; and the annular water supply pipe II, the circulating water pump II, the air coolers II, the filter II, the degassing tank II, the annular water drain pipe II and the annular water supply pipe II are connected. The closed circulation cooling system has the advantages as follows: non-blowing down online switching of the circulation cooling system is realized through voltage-sharing paralleling operation, and the cooling intensity of a cooled device is improved, so that the service life of the cooled device is prolonged, and the purposes that the production is not affected and the cooled device is not damaged are achieved in the switching process.

Description

A kind of blast furnace closed circulation cooling system
Technical field
The utility model belongs to technical field of heat exchange, relates in particular to a kind of blast furnace closed circulation cooling system.
Background technology
The soft water of 2 cooling use of blast furnace of Anshan iron and steel plant share Bayuquan iron and steel branch office is the closed cycle type of cooling, and soft water adopts parallel way to supply with cupola well and shaft, and cupola well maximum amount of water can only reach 3500m 3/ h, causes cooling power to be restricted, and for strengthening cupola well cooling power, increasing by a closed circulation cooling system is separately that cupola well is cooling, to strengthen cupola well cooling power, and two cooling system paired runnings.Routinely, two, blast furnace independently cooling system needs blowing out to switch in the time switching, affecting blast furnace produces, and the recycle system stays cool in handoff procedure, now the water coolant in system does not flow, and the heat in cooling-part cannot be taken away, and will cause cooling-part temperature to raise, serious meeting damages cooling-part, causes heavy economic losses.
Summary of the invention
For overcoming the deficiencies in the prior art, the purpose of this utility model is to provide a kind of blast furnace closed circulation cooling system, realizes two independently cooling system switchings online in the situation that not stopping production, safe and reliable.
For achieving the above object, the utility model is achieved through the following technical solutions:
A kind of blast furnace closed circulation cooling system, comprise air cooler one, air cooler two, strainer one, strainer two, degassing vessel one, degassing vessel two, draining endless tube one, draining endless tube two, feedwater endless tube one, feedwater endless tube two, water circulating pump one, water circulating pump two, degassing vessel one, air cooler one, strainer one, water circulating pump one, feedwater endless tube one, draining endless tube one, degassing vessel one is connected, water circulating pump one is also connected with feedwater endless tube two, feedwater endless tube two, water circulating pump two, air cooler two, strainer two, degassing vessel two, draining endless tube two, feedwater endless tube two is connected.
Between described degassing vessel two and draining endless tube two, be provided with valving one.
Between described recycle pump one and feedwater endless tube two, be provided with 1# valve, between recycle pump one and feedwater endless tube one, be provided with 2# valve.
Described draining endless tube two is provided with more than 3 or 3 pipeline, on each pipeline, is equipped with valve, forms valving two.
Described feedwater endless tube two is provided with more than 3 or 3 pipeline, on each pipeline, is equipped with valve, forms valving three.
Compared with prior art, the beneficial effects of the utility model are:
Realize the online switchings of two covers cooling system in parallel, improved the cooling intensity of the equipment that is cooled, thereby improved the work-ing life of the equipment that is cooled, and in handoff procedure, will reach the object that does not affect production and also do not damage the equipment of being cooled.
Brief description of the drawings
Fig. 1 is system architecture schematic diagram of the present utility model.
In figure: 1-water circulating pump two 2-degassing vessel two 3-strainer two 4-air cooler two 5-feedwater endless tube two 6-draining endless tube two 7-water circulating pump one 8-degassing vessel one 9-strainer one 10-air cooler one 11-1# valve 12-2# valve 13-valving one 14-draining endless tube one 15-feedwater endless tubes one.
Embodiment
Below in conjunction with Figure of description, the utility model is described in detail, but should be noted that enforcement of the present utility model is not limited to following embodiment.
See Fig. 1, a kind of blast furnace closed circulation cooling system, comprise air cooler 1, air cooler 24, strainer 1, strainer 23, degassing vessel 1, degassing vessel 22, draining endless tube 1, draining endless tube 26, feedwater endless tube 1, feedwater endless tube 25, water circulating pump 1, water circulating pump 21, degassing vessel 1, air cooler 1, strainer 1, water circulating pump 1, feedwater endless tube 1, draining endless tube 1, degassing vessel 1 is connected, water circulating pump 1 is also connected with feedwater endless tube 25, feedwater endless tube 25, water circulating pump 21, air cooler 24, strainer 23, degassing vessel 22, draining endless tube 26, feedwater endless tube 25 is connected.The wherein also double Constant pressure tank that does of degassing vessel 1 and degassing vessel 22.
Between degassing vessel 22 and draining endless tube 26, be provided with valving 1.
Between recycle pump one and feedwater endless tube 25, be provided with 1# valve 11, between recycle pump one and feedwater endless tube 1, be provided with 2# valve 12.
Draining endless tube 26 is provided with more than 3 or 3 pipeline, on each pipeline, is equipped with valve, forms valving two.Feedwater endless tube 25 is provided with more than 3 or 3 pipeline, on each pipeline, is equipped with valve, forms valving three.
The online switching method of not blowing out that utilizes blast furnace closed circulation cooling system to realize, comprises the following steps:
1) blast furnace closed circulation cooling system is full of to water;
2) system is all pressed: slowly open arbitrary valve of the valving two (the 9#-14# valve in Fig. 1) of draining endless tube 26, then by remaining valve open on draining endless tube 26; (whether the timed interval of valve open needs to limit)
3) open successively the valving three on feedwater endless tube 25, the 3# from Fig. 1 starts to open successively until 8# valve is all opened all valves of valving three.
4) arbitrary water circulating pump in ON cycle water pump 21, arbitrary the water circulating pump of simultaneously stopping transport in water circulating pump 1; Valve-off group 1 and 1# valve 11 after stable, the 16#1 valve in valving 1, under normal circumstances in closing condition, therefore need be closed 14# valve, 15# valve and 1# valve 11 at this;
5) second water circulating pump of startup water circulating pump, normally puts system into operation.
Realize the paired running of two covers system arranged side by side.Make the equipment of being cooled be switched to reposefully another cooling system from a cooling system handover security in the situation that of normal production, avoid the stopping production financial loss that causes and equipment are because of the cooling not good damage causing.
The utility model has been realized the two online switchings of overlapping cooling system in parallel, improve the cooling intensity of the equipment that is cooled, thereby improve the work-ing life of the equipment that is cooled, and in handoff procedure, will reach the object that does not affect production and also do not damage the equipment of being cooled.

Claims (5)

1. a blast furnace closed circulation cooling system, it is characterized in that, comprise air cooler one, air cooler two, strainer one, strainer two, degassing vessel one, degassing vessel two, draining endless tube one, draining endless tube two, feedwater endless tube one, feedwater endless tube two, water circulating pump one, water circulating pump two, degassing vessel one, air cooler one, strainer one, water circulating pump one, feedwater endless tube one, draining endless tube one, degassing vessel one is connected, water circulating pump one is also connected with feedwater endless tube two, feedwater endless tube two, water circulating pump two, air cooler two, strainer two, degassing vessel two, draining endless tube two, feedwater endless tube two is connected.
2. a kind of blast furnace closed circulation cooling system according to claim 1, is characterized in that, between described degassing vessel two and draining endless tube two, is provided with valving one.
3. a kind of blast furnace closed circulation cooling system according to claim 1, is characterized in that, between described recycle pump one and feedwater endless tube two, is provided with 1# valve, between recycle pump one and feedwater endless tube one, is provided with 2# valve.
4. a kind of blast furnace closed circulation cooling system according to claim 1, is characterized in that, described draining endless tube two is provided with more than 3 or 3 pipeline, on each pipeline, is equipped with valve, forms valving two.
5. a kind of blast furnace closed circulation cooling system according to claim 1, is characterized in that, described feedwater endless tube two is provided with more than 3 or 3 pipeline, on each pipeline, is equipped with valve, forms valving three.
CN201420079340.3U 2014-02-24 2014-02-24 Closed circulation cooling system for blast furnace Expired - Lifetime CN203728863U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420079340.3U CN203728863U (en) 2014-02-24 2014-02-24 Closed circulation cooling system for blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420079340.3U CN203728863U (en) 2014-02-24 2014-02-24 Closed circulation cooling system for blast furnace

Publications (1)

Publication Number Publication Date
CN203728863U true CN203728863U (en) 2014-07-23

Family

ID=51198949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420079340.3U Expired - Lifetime CN203728863U (en) 2014-02-24 2014-02-24 Closed circulation cooling system for blast furnace

Country Status (1)

Country Link
CN (1) CN203728863U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103882170A (en) * 2014-02-24 2014-06-25 鞍钢集团工程技术有限公司 Closed circulation cooling system of blast furnace and non-shutdown online switching method of closed circulation cooling system
CN114480761A (en) * 2021-12-17 2022-05-13 中国华冶科工集团有限公司 Blast furnace soft water closed cycle cooling system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103882170A (en) * 2014-02-24 2014-06-25 鞍钢集团工程技术有限公司 Closed circulation cooling system of blast furnace and non-shutdown online switching method of closed circulation cooling system
CN114480761A (en) * 2021-12-17 2022-05-13 中国华冶科工集团有限公司 Blast furnace soft water closed cycle cooling system and method

Similar Documents

Publication Publication Date Title
CN109579108A (en) A kind of high back pressure coupling great temperature difference heat supply system and operation method for air cooling unit
CN103421917B (en) Blast furnace soft water closed-recirculation cooling system
CN103060496A (en) Method and system suitable for recovering waste heat of blast furnace slag flushing water
CN203728863U (en) Closed circulation cooling system for blast furnace
CN103245205A (en) Combined condensed steam heat exchange system for direct air cooling steam turbine
CN203477891U (en) Distributed energy comprehensive utilization system for natural gas station
CN103060497B (en) Blast furnace slag sweeping water waste heat power generation system
CN103882170A (en) Closed circulation cooling system of blast furnace and non-shutdown online switching method of closed circulation cooling system
CN104267268B (en) The experimental rig and its test method of a kind of electric heating tube working life
CN106017109A (en) Energy-saving process of blast furnace circulating water cooling system with upper tower pumps
CN205876403U (en) Open circulation cooling water system
CN203501801U (en) Cooling water system of medium-frequency induction furnace
CN105822372A (en) Wet cooling steam turbine cold end system based on high-back-pressure steam exhaust waste heat recovery
CN203411556U (en) Closed circulating cooling system of soft water for blast furnace
CN202955919U (en) Device for rapidly cooling circulating water
CN203393172U (en) Online adjusting system for heat load distribution of full-cooling-wall blast furnace
CN202947489U (en) Waste-heat cascaded utilization system at low-temperature sections of sintering circular cooling machine
CN205841533U (en) There is the turbine-generator units bearing cooling system of recoil effect
CN108036195B (en) Pipeline system capable of heating and cooling simultaneously
CN209295710U (en) A kind of preventing freeze in winter induced cooling tower system
CN203128595U (en) System suitable for waste heat recovery of slag flushing water of blast furnace
CN207421511U (en) A kind of new heat-exchanger support of pipelines
CN201893125U (en) Jacket device for tank body of freeze dryer
CN203489728U (en) Closed circulating water system of power generation and heat supply unit
CN103954031A (en) Method and device for recycling heat energy of compressed air of aerobe fermentation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140723

CX01 Expiry of patent term