CN203711925U - Belt-type conveyor intermediate frame drill jig - Google Patents

Belt-type conveyor intermediate frame drill jig Download PDF

Info

Publication number
CN203711925U
CN203711925U CN201320806994.7U CN201320806994U CN203711925U CN 203711925 U CN203711925 U CN 203711925U CN 201320806994 U CN201320806994 U CN 201320806994U CN 203711925 U CN203711925 U CN 203711925U
Authority
CN
China
Prior art keywords
workpiece
middle frame
locating
live
drill jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320806994.7U
Other languages
Chinese (zh)
Inventor
廖纯德
卢晓斌
杨敏
罗波
唐建雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENGYANG CONVEYING MACHINERY CO Ltd
Original Assignee
HENGYANG CONVEYING MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENGYANG CONVEYING MACHINERY CO Ltd filed Critical HENGYANG CONVEYING MACHINERY CO Ltd
Priority to CN201320806994.7U priority Critical patent/CN203711925U/en
Application granted granted Critical
Publication of CN203711925U publication Critical patent/CN203711925U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model discloses a belt-type conveyor intermediate frame drill jig. The belt-type conveyor intermediate frame drill jig comprises a transmission platform, a workpiece clamping platform and a borehole positioning mold plate, wherein the transmission platform comprises a plurality of transmission rolls which are distributed in parallel at intervals along the radial direction; the workpiece clamping platform is arranged on the transmission rolls, and the workpiece clamping platform comprises a base which is arranged on the transmission rolls and a plurality of clamps which are arranged on the base in a floating manner and used for clamping a workpiece; the surface of the borehole positioning mold plate is provided with a plurality of positioning holes, and the workpiece can be accurately bored by a drilling tool through the positioning holes. By adopting the belt-type conveyor intermediate frame drill jig, the workpiece can be rapidly clamped in the workpiece clamping platform, and the workpiece clamping platform can be driven by a plurality of transmission rolls to move, so that the workpiece is convenient to position; moreover, and the workpiece can be accurately bored by the drilling tool through the positioning holes on the drilling positioning mold plate, so that the detail work for scribing lines, aligning the samples, punching holes and the like can be saved, and the perforating efficiency can be greatly improved.

Description

Ribbon conveyer middle frame drill jig
Technical field
The utility model relates to ribbon conveyer field, particularly a kind of ribbon conveyer middle frame drill jig.
Background technology
Along with the requirement of modern production development, increase work efficiency and become one of key factor that enterprise establishes oneself in an unassailable position in market competition.In conveyer industry, what middle frame was played the part of in whole conveying equipment is to support and the key player who installs, because there being a fairly large number of installing hole and large in batches on it, one of parts that so middle frame is manufacturing enterprise to be concerned about very much, the working (machining) efficiency that how to improve middle frame installing hole will directly have influence on the market competitiveness of enterprise.
At present, on ribbon conveyer middle frame, the processing mode of installing hole mainly adopts following several method:
The first, on punch press, adopt the method for punching press grinding tool position punch.
The second, adopt traditional handicraft method to adopt pincers worker according to the center-punching of ruling in batches, the method for single-piece or the boring of small lot upright drill.
Three, adopt the numerical control press method of punching fast in enormous quantities.
But the perforating efficiency of above-mentioned three kinds of methods is low, and also there is position error, affect drilling quality.
Utility model content
Technical problem to be solved in the utility model is for shortcomings and deficiencies of the prior art, provide a kind of easy to operate, accurate positioning is quick, perforating efficiency is high and realize the ribbon conveyer middle frame drill jig of multi-hole position, complete series punching, to address the above problem.
The technical problem that the utility model solves can realize by the following technical solutions:
Ribbon conveyer middle frame drill jig, comprising:
Transmission platform, described transmission platform comprises the live-roller that some radially spaced and parallel are arranged;
Be arranged on the Workpiece clamping platform on described live-roller, described Workpiece clamping platform comprises the pedestal that is arranged on described live-roller and some groups of intervals and floats and is arranged on described pedestal the fixture for clamping work pieces;
Be fixed on the boring locating template on described workpiece, described boring locating template surface offers some locating holes, and drilling tool can accurately be holed by described locating hole on workpiece.
In a preferred embodiment of the present utility model, described pedestal comprises and a pair ofly along described live-roller spaced radial, is arranged on the bottom girder on described some live-rollers and some and described bottom girder is vertical and interval is fixed on the entablature on described bottom girder, a pair of fixture is set on each entablature, and between every a pair of fixture, region forms Workpiece clamping region.
In a preferred embodiment of the present utility model, every a pair of fixture comprises determines jig plate and moving jig plate, describedly determine jig plate and be fixed on described entablature one end, described moving jig plate is arranged on described entablature by bolt assembly, on described moving jig plate, be at least rotary with a horizontal adjustment bolt, the bar portion of described horizontal adjustment bolt compresses and is placed on the workpiece in described Workpiece clamping region.
In a preferred embodiment of the present utility model, described boring locating template is one to fall " Qian " shape template, the described top of " Qian " shape template offers some locating holes, the described central region of " Qian " shape template forms a workpiece locating area, in the described both sides of " Qian " shape template, be rotary with respectively at least one horizontal-clamping bolt, the bar portion of described horizontal-clamping bolt compresses and is placed on the workpiece in described workpiece locating area.
Owing to having adopted technical scheme as above, the utility model can be by workpiece Quick-clamped in Workpiece clamping platform, and Workpiece clamping platform can be driven by some live-rollers mobile, facilitate the location of workpiece, and drilling tool can accurately be holed by the locating hole on boring locating template on workpiece, save line, to careful works such as sample dotting punches, greatly improved perforating efficiency.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the front view of fixing embodiment 1 workpiece of vertically placing of the utility model.
Fig. 2 is the front view of embodiment 1 workpiece of the utility model fixing horizontal placement.
Fig. 3 is the front view of fixing embodiment 2 workpiece of vertically placing of the utility model.
Fig. 4 is the front view of embodiment 2 workpiece of the utility model fixing horizontal placement.
Fig. 5 is the side view of fixing embodiment 1 workpiece of vertically placing of the utility model.
Fig. 6 is the top view of Fig. 5.
Fig. 7 is the structural representation of fixing embodiment 1 workpiece of vertically placing of the utility model.
Fig. 8 is the structural representation of embodiment 2 workpiece of the utility model fixing horizontal placement.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach object and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
Referring to shown in Fig. 1 to Fig. 8, ribbon conveyer middle frame drill jig comprises transmission platform 100, Workpiece clamping platform 200, boring locating template 300a(300b), transmission platform 100 comprises the live-roller 110 that some radially spaced and parallel are arranged, the two end axles of each live-roller 110 is located on bracing frame 120.
Workpiece clamping platform 200 comprises a pair of bottom girder 210 and some entablatures 220, a pair of bottom girder 210 is arranged on some live-rollers 110 along live-roller 110 spaced radials, and the rotation of some live-rollers 110 can drive a pair of bottom girder 210 to move along live-roller 110 transmission direction, the obvious jam of nothing in moving process.
Some entablatures 220 and interval vertical with bottom girder 210 is fixed on bottom girder 210, on each entablature 220, be provided with and determine jig plate 231 and moving jig plate 232, wherein determine jig plate 231 and be fixed on entablature 220 one end, and spaced apartly on entablature 220 be provided with some installing holes 221, moving jig plate 232 is fixed on entablature 220 by the bolt assembly 240 coordinating with installing hole 221, determine region between jig plate 231 and moving jig plate 232 and form Workpiece clamping region 250, when moving jig plate 232 is arranged on the installing hole 221 of diverse location, the size in Workpiece clamping region 250 can change, make to determine the middle frame workpiece 10a(10b that jig plate 231 and moving jig plate 232 can clamp multiple series).And on moving jig plate 231, be rotary with a pair of horizontal adjustment bolt 233, the bar portion of horizontal adjustment bolt 233 compresses and is placed on the middle frame workpiece 10a(10b in Workpiece clamping region 250).
And boring locating template 300a(300b) be one to fall " Qian " shape template, boring locating template 300a(300b) top offers some locating hole 320a(320b), the central region of " Qian " shape template forms workpiece locating area 330, be rotary with respectively at least one horizontal-clamping bolt 310a(310b falling the both sides of " Qian " shape template), horizontal-clamping bolt 310a(310b) bar portion compress the middle frame workpiece 10a(10b that is placed in workpiece locating area 330).
Operation principle of the present utility model is as follows:
When giving middle frame workpiece 10a(10b) both sides when boring, shown in Fig. 1, Fig. 3, Fig. 5, Fig. 6, Fig. 7, by some middle frame workpiece 10a(10b) be vertically placed on after side-by-side alignment by determining in Workpiece clamping region 250 that between jig plate 231 and moving jig plate 232, region forms, middle frame workpiece 10a(10b) a side upward, and regulate horizontal adjustment bolt 233, make the bar portion compression of horizontal adjustment bolt 233 be placed on the middle frame workpiece 10a(10b in Workpiece clamping region 250), guarantee middle frame workpiece 10a(10b) can not be shifted.Then locating template 300a(300b will hole) be enclosed within middle frame workpiece 10a(10b) on, again by regulating horizontal-clamping bolt 310a(310b), locating template 300a(300b makes to hole) clamping middle frame workpiece 10a(10b), locating template 300a(300b now holes) lip-deep locating hole 320a(320b) can aim at middle frame workpiece 10a(10b) position that need to hole, two sides, finally use drilling tool to pass through locating hole 320a(320b) to middle frame workpiece 10a(10b) side hole, get final product accurately at middle frame workpiece 10a(10b) upper boring, after boring, by live-roller 110, drive a pair of bottom girder 210 certain distance that advances, locating template 300a(300b again will hole) be arranged on the middle frame workpiece 10a(10b that needs boring) boring station on, repeating aforesaid operations step can be to middle frame workpiece 10a(10b) next station hole.Whole operating process saves line, to careful works such as sample dotting punches, greatly improved perforating efficiency; When giving middle frame workpiece 10a(10b) another side while holing, only need be by middle frame workpiece 10a(10b) also no a side of boring is not fixed in Workpiece clamping region 250 upward, then repeats aforesaid operations process.
When giving middle frame workpiece 10a(10b) both sides when boring, shown in Fig. 2, Fig. 4, Fig. 8, by some middle frame workpiece 10a(10b) lie in a horizontal plane in after side-by-side alignment by determining in Workpiece clamping region 250 that between jig plate 231 and moving jig plate 232, region forms, middle frame workpiece 10a(10b) end face upward, and regulate horizontal adjustment bolt 233, make the bar portion compression of horizontal adjustment bolt 233 be placed on the middle frame workpiece 10a(10b in Workpiece clamping region 250), guarantee middle frame workpiece 10a(10b) can not be shifted.Then locating template 300a(300b will hole) be enclosed within middle frame workpiece 10a(10b) on, again by regulating horizontal-clamping bolt 310a(310b), locating template 300a(300b makes to hole) clamping middle frame workpiece 10a(10b), locating template 300a(300b now holes) lip-deep locating hole 320a(320b) can aim at middle frame workpiece 10a(10b) position that need to hole of end face, finally use drilling tool to pass through locating hole 320a(320b) to middle frame workpiece 10a(10b) end face hole, get final product accurately at middle frame workpiece 10a(10b) upper boring, after boring, by live-roller 110, drive a pair of bottom girder 210 certain distance that advances, locating template 300a(300b again will hole) be arranged on the middle frame workpiece 10a(10b that needs boring) boring station on, repeating aforesaid operations step can be to middle frame workpiece 10a(10b) next station hole.
Above-mentioned operating process has improved perforating efficiency greatly, and is applicable to the punching of the middle frame workpiece of Multiple Type, realizes multi-hole position, complete series punching.
More than show and described basic principle of the present utility model and principal character and advantage of the present utility model.The technical staff of the industry should understand; the utility model is not restricted to the described embodiments; that in above-described embodiment and description, describes just illustrates principle of the present utility model; do not departing under the prerequisite of the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (4)

1. ribbon conveyer middle frame drill jig, is characterized in that, comprising:
Transmission platform, described transmission platform comprises the live-roller that some radially spaced and parallel are arranged;
Be arranged on the Workpiece clamping platform on described live-roller, described Workpiece clamping platform comprises the pedestal that is arranged on described live-roller and some groups of intervals and floats and is arranged on described pedestal the fixture for clamping work pieces;
Be fixed on the boring locating template on described workpiece, described boring locating template surface offers some locating holes, and drilling tool can accurately be holed by described locating hole on workpiece.
2. ribbon conveyer middle frame drill jig as claimed in claim 1, it is characterized in that, described pedestal comprises and a pair ofly along described live-roller spaced radial, is arranged on the bottom girder on described some live-rollers and some and described bottom girder is vertical and interval is fixed on the entablature on described bottom girder, a pair of fixture is set on each entablature, and between every a pair of fixture, region forms Workpiece clamping region.
3. ribbon conveyer middle frame drill jig as claimed in claim 2, it is characterized in that, every a pair of fixture comprises determines jig plate and moving jig plate, describedly determine jig plate and be fixed on described entablature one end, described moving jig plate is arranged on described entablature by bolt assembly, on described moving jig plate, be at least rotary with a horizontal adjustment bolt, the bar portion of described horizontal adjustment bolt compresses and is placed on the workpiece in described Workpiece clamping region.
4. ribbon conveyer middle frame drill jig as claimed in claim 3, it is characterized in that, described boring locating template is one to fall " Qian " shape template, the described top of " Qian " shape template offers some locating holes, the described central region of " Qian " shape template forms a workpiece locating area, in the described both sides of " Qian " shape template, be rotary with respectively at least one horizontal-clamping bolt, the bar portion of described horizontal-clamping bolt compresses and is placed on the workpiece in described workpiece locating area.
CN201320806994.7U 2013-12-09 2013-12-09 Belt-type conveyor intermediate frame drill jig Withdrawn - After Issue CN203711925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320806994.7U CN203711925U (en) 2013-12-09 2013-12-09 Belt-type conveyor intermediate frame drill jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320806994.7U CN203711925U (en) 2013-12-09 2013-12-09 Belt-type conveyor intermediate frame drill jig

Publications (1)

Publication Number Publication Date
CN203711925U true CN203711925U (en) 2014-07-16

Family

ID=51151124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320806994.7U Withdrawn - After Issue CN203711925U (en) 2013-12-09 2013-12-09 Belt-type conveyor intermediate frame drill jig

Country Status (1)

Country Link
CN (1) CN203711925U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103691996A (en) * 2013-12-09 2014-04-02 衡阳运输机械有限公司 Middle frame drill jig for belt conveyor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103691996A (en) * 2013-12-09 2014-04-02 衡阳运输机械有限公司 Middle frame drill jig for belt conveyor
CN103691996B (en) * 2013-12-09 2016-05-11 衡阳运输机械有限公司 Ribbon conveyer middle frame drill jig

Similar Documents

Publication Publication Date Title
CN204996918U (en) Galvanized steel pipe punching device
CN205437239U (en) Pipe fitting perforating device
CN201736047U (en) Connecting rod processing equipment
CN203992485U (en) A kind of drilling equipment
CN103418814A (en) Drilling machine provided with center hole and used for thin plates
CN203711925U (en) Belt-type conveyor intermediate frame drill jig
CN210789297U (en) Automatic frock part perforating device of appearance of going up
CN103691996B (en) Ribbon conveyer middle frame drill jig
CN204430367U (en) Simple laser based on Magnetic gauge stand is auxiliary to heart drilling equipment
CN203993273U (en) A kind of centralized positioning processing unit (plant)
CN202963867U (en) Positioning device for point loading of cross arms
CN201863018U (en) Milling tool for end surface of cylindrical part
CN105643301A (en) Board girder flange face machining equipment
CN204381839U (en) A kind of Digit Control Machine Tool high accuracy support
CN208450669U (en) A kind of numerically-controlled machine tool hole drilling die
CN203471199U (en) Locating tool for welding of vertical column
CN207548952U (en) A kind of device for round plank circle centre position automatic positioning punching
CN201380308Y (en) Special drilling tool for extension rod
CN206335174U (en) A kind of end cap auxiliary machining device
CN112108903A (en) Multi-station clamping device for bearing punching
CN202877583U (en) Positioning tool for machining drill holes by means of pin rowing machine for scraper
CN204504285U (en) A kind of tubing automatic punching device
CN221249129U (en) Industrial brush perforating device
CN202894805U (en) Bracket structure for vacuum press roll drilling fixture
CN214290937U (en) Drilling device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140716

Effective date of abandoning: 20160511

C25 Abandonment of patent right or utility model to avoid double patenting