CN203709454U - Easily-carried construction cost kit - Google Patents
Easily-carried construction cost kit Download PDFInfo
- Publication number
- CN203709454U CN203709454U CN201420096895.9U CN201420096895U CN203709454U CN 203709454 U CN203709454 U CN 203709454U CN 201420096895 U CN201420096895 U CN 201420096895U CN 203709454 U CN203709454 U CN 203709454U
- Authority
- CN
- China
- Prior art keywords
- kit
- holding tank
- construction costs
- cover plate
- box body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Clamps And Clips (AREA)
Abstract
The utility model provides an easily-carried construction cost kit which belongs to the technical field of construction cost and solves the technical problems of low carrying convenience of a construction cost kit and the like in the prior art. The construction cost kit comprises a kit body and a cover body, wherein the outer end of the cover body is in clamping connection with the outer end of the kit body; the inner end of the cover body is hinged with the inner end of the kit body; two sides of the inner end of the kit body are further rotationally equipped with a universal wheel; two first threaded holes are formed in the outer end surface of the kit body; each of the two threaded holes is internally connected with a connecting rod; two connecting rods are fixedly connected via a pull rod; a first holding slot for holding a camera, a second holding slot for holding a calculator and a third holding slot for holding graph paper are further formed in the kit body. The construction cost kit has the advantage of high carrying convenience.
Description
Technical field
The utility model belongs to construction costs technical field, relates to a kind of construction costs kit being easy to carry about with one.
Background technology
Construction costs refers to carries out the full payment that a certain engineering construction spends, and its core content is investment estimate, estimation per design, correction budgetary estimate, working drawing budget, Engineering Settlement, budget needed for the completion of projects etc.The task of construction costs comprises: according to drawing, quota and bill code, calculate flat cost, overhead cost, set-fee and tax of in engineering, comprising etc.
China patent CN202999669U discloses a kind of construction costs clearing apparatus and has preserved bag, mainly solved in prior art, exist means of account settlement is packed into the chaotic and impaired problem of easily colliding with mutually of common handbag.Described inclusion is divided into two-layer up and down, and inner for the front side, upper strata of cavity is provided with the opening with cavity UNICOM, opening two ends are fixed with respectively longitudinal baffle bar, are inserted with arm-tie in apron strip, have horizontal bar hole on arm-tie; Described inclusion lower floor is built-in with the drawing box of right openings, two parts before and after drawing box is divided into by dividing plate; Rear section is divided into three chambers by dividing plate, is respectively the first Room, the second Room, the 3rd Room, the first described indoor cylindrical shape sheath that is fixed with, and second is indoorly fixed with square sheath.This project cost clearing apparatus is preserved bag various apparatus is put in order, searches conveniently, is difficult for colliding with impaired, is convenient to work.
But, owing to conventionally will placing all kinds of instruments such as camera, calculator, drawing, T-square in the construction costs clearing apparatus preservation bag in above-mentioned patent, make the weight of whole bag larger, and need to carrying heavy bag, construction costs personnel travel to and fro between between each job site, labour intensity is large, carries inconvenience.
Summary of the invention
The utility model is the problems referred to above that exist for existing technology, and a kind of construction costs kit being easy to carry about with one is provided, and technical problem to be solved in the utility model is: the convenience of carrying that how to improve this construction costs kit.
The purpose of this utility model can realize by following technical proposal:
A kind of construction costs kit being easy to carry about with one, it is characterized in that, described construction costs kit comprises box body and lid, the outer end phase clamping of the outer end of described lid and described box body, the inner of described lid and the inner of described box body are hinged, and the inner both sides of described box body are also rotated and are provided with universal wheel, and the outer face of described box body offers two screwed holes one, the interior connecting rod that has been threaded respectively of described two screwed holes one, is connected mutually by a pull bar between two connecting rods; In described box body, also offer holding tank one for placing camera, for placing the holding tank two of calculator and for placing the holding tank three of drawing.
Its operation principle is as follows: this construction costs kit in use, can be respectively by taking a picture piece, calculator and drawing be positioned in holding tank one, holding tank two and holding tank three, then the outer end phase clamping with box body by the outer end of lid, then can pull whole kit by pull bar, the setting of universal wheel, can make this kit roll along all directions, thereby reduce construction costs personnel's labour intensity, improve the convenience of carrying of this kit.
In above-mentioned a kind of construction costs kit being easy to carry about with one, between described holding tank one and holding tank two, by baffle plate one, separate, between described holding tank two and holding tank three, by baffle plate two, separate, described construction costs kit also comprises that the inner of described cover plate one is articulated with on described baffle plate one for hiding the cover plate one of described holding tank one; Described construction costs kit also comprises for hiding the cover plate two of described holding tank two, the inner of described cover plate two is also articulated with on described baffle plate one, the inner plate surface of described cover plate two is also opened and is fixed with a boss, on described baffle plate two, offer can with the groove of described boss phase clamping.Be designed with after cover plate one and cover plate two, cover plate one and cover plate two can be set level, after the groove phase clamping on the boss on cover plate two and baffle plate two, cover plate one and cover plate two are combined to form a desktop, for construction costs personnel office.
In above-mentioned a kind of construction costs kit being easy to carry about with one, described cover plate two is rectangle tabular, and the outer plate surface of described cover plate two is installed with rule one and rule two along self length direction and width respectively.Be designed with after rule one and rule two, facilitate construction costs personnel to measure.
In above-mentioned a kind of construction costs kit being easy to carry about with one, the lateral surface of described lid is installed with a holder, offers the through hole passing for T-square one end on described holder.
In above-mentioned a kind of construction costs kit being easy to carry about with one, the lateral surface of described lid is installed with a solar panel, and the medial surface of described lid is installed with the LED lamp being electrically connected to described solar panel.Be designed with after LED lamp, conveniently in the weak environment of light, use, and be designed with solar panel, can play the effect of energy-saving consumption-reducing.
Compared with prior art, the utlity model has following advantage:
1, this construction costs kit in use, can be respectively by taking a picture piece, calculator and drawing be positioned in holding tank one, holding tank two and holding tank three, then the outer end phase clamping with box body by the outer end of lid, then can pull whole kit by pull bar, the setting of universal wheel, can make this kit roll along all directions, thereby reduce construction costs personnel's labour intensity, improve the convenience of carrying of this kit;
2, be designed with after cover plate one and cover plate two, cover plate one and cover plate two can be set level, after the groove phase clamping on the boss on cover plate two and baffle plate two, cover plate one and cover plate two are combined to form a desktop, for construction costs personnel office.
Accompanying drawing explanation
Fig. 1 is the structural representation of this construction costs kit in embodiment.
Fig. 2 is the front view of this construction costs kit in embodiment.
In figure, 1, box body; 2, lid; 3, universal wheel; 4, connecting rod; 5, pull bar; 6, holding tank one; 7, holding tank two; 8, holding tank three; 9, baffle plate one; 10, baffle plate two; 11, cover plate one; 12, cover plate two; 13, groove; 14, rule one; 15, rule two; 16, holder; 17, solar panel; 18, LED lamp.
The specific embodiment
Be below specific embodiment of the utility model by reference to the accompanying drawings, the technical solution of the utility model is further described, but the utility model be not limited to these embodiment.
As shown in Figure 1 and Figure 2, this construction costs kit comprises box body 1 and lid 2, the outer end phase clamping of the outer end of lid 2 and box body 1, the inner of the inner of lid 2 and box body 1 is hinged, the inner both sides of box body 1 are also rotated and are provided with universal wheel 3, the outer face of box body 1 offers interior being threaded respectively of one, two screwed hole one of two screwed holes and by a pull bar 5, is connected mutually between 4, two connecting rods 4 of a connecting rod; In box body 1, also offer holding tank 1 for placing camera, for placing the holding tank 27 of calculator and for placing the holding tank 38 of drawing.In the present embodiment, between holding tank 1 and holding tank 27, by baffle plate 1, separate, between holding tank 27 and holding tank 38, by baffle plate 2 10, separate, construction costs kit also comprises that the inner of cover plate 1 is articulated with on baffle plate 1 for hiding the cover plate 1 of holding tank 1; Construction costs kit also comprises that the inner of cover plate 2 12 is also articulated with on baffle plate 1 for hiding the cover plate 2 12 of holding tank 27, and the inner plate surface of cover plate 2 12 is also opened and is fixed with a boss, on baffle plate 2 10, offer can with the groove 13 of boss phase clamping.As preferably, cover plate 2 12 is rectangle tabular, and the outer plate surface of cover plate 2 12 is installed with rule 1 and rule 2 15 along self length direction and width respectively.
As shown in Figure 1 and Figure 2, the lateral surface of lid 2 is installed with a holder 16, offers the through hole passing for T-square one end on holder 16.The lateral surface of lid 2 is installed with a solar panel 17, and the medial surface of lid 2 is installed with the LED lamp 18 being electrically connected to solar panel 17.
Operation principle of the present utility model is as follows: this construction costs kit in use, can be respectively by taking a picture piece, calculator and drawing be positioned in holding tank one, holding tank two and holding tank three, then the outer end phase clamping with box body by the outer end of lid, then can pull whole kit by pull bar, the setting of universal wheel, can make this kit roll along all directions, thereby reduce construction costs personnel's labour intensity, improve the convenience of carrying of this kit.
Specific embodiment described herein is only to the explanation for example of the utility model spirit.The utility model person of ordinary skill in the field can make various modifications or supplements or adopt similar mode to substitute described specific embodiment, but can't depart from spirit of the present utility model or surmount the defined scope of appended claims.
Claims (5)
1. the construction costs kit being easy to carry about with one, it is characterized in that, described construction costs kit comprises box body (1) and lid (2), the outer end phase clamping of the outer end of described lid (2) and described box body (1), the inner of the inner of described lid (2) and described box body (1) is hinged, the inner both sides of described box body (1) are also rotated and are provided with universal wheel (3), the outer face of described box body (1) offers two screwed holes one, the interior connecting rod (4) that has been threaded respectively of described two screwed holes one, between two connecting rods (4), by a pull bar (5), be connected mutually, in described box body (1), also offer holding tank one (6) for placing camera, for placing the holding tank two (7) of calculator and for placing the holding tank three (8) of drawing.
2. a kind of construction costs kit being easy to carry about with one according to claim 1, it is characterized in that, between described holding tank one (6) and holding tank two (7), by baffle plate one (9), separate, between described holding tank two (7) and holding tank three (8), by baffle plate two (10), separate, described construction costs kit also comprises that the inner of described cover plate one (11) is articulated with on described baffle plate one (9) for hiding the cover plate one (11) of described holding tank one (6); Described construction costs kit also comprises for hiding the cover plate two (12) of described holding tank two (7), the inner of described cover plate two (12) is also articulated with on described baffle plate one (9), the inner plate surface of described cover plate two (12) is also opened and is fixed with a boss, on described baffle plate two (10), offer can with the groove (13) of described boss phase clamping.
3. a kind of construction costs kit being easy to carry about with one according to claim 2, it is characterized in that, described cover plate two (12) is rectangle tabular, and the outer plate surface of described cover plate two (12) is installed with rule one (14) and rule two (15) along self length direction and width respectively.
4. a kind of construction costs kit being easy to carry about with one according to claim 3, is characterized in that, the lateral surface of described lid (2) is installed with a holder (16), offers the through hole passing for T-square one end on described holder (16).
5. a kind of construction costs kit being easy to carry about with one according to claim 4, it is characterized in that, the lateral surface of described lid (2) is installed with a solar panel (17), and the medial surface of described lid (2) is installed with the LED lamp (18) being electrically connected to described solar panel (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420096895.9U CN203709454U (en) | 2014-03-05 | 2014-03-05 | Easily-carried construction cost kit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420096895.9U CN203709454U (en) | 2014-03-05 | 2014-03-05 | Easily-carried construction cost kit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203709454U true CN203709454U (en) | 2014-07-16 |
Family
ID=51148673
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420096895.9U Expired - Fee Related CN203709454U (en) | 2014-03-05 | 2014-03-05 | Easily-carried construction cost kit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203709454U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108618324A (en) * | 2018-05-09 | 2018-10-09 | 张文智 | A kind of multifunctional engineering cost storage device easy to remove |
-
2014
- 2014-03-05 CN CN201420096895.9U patent/CN203709454U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108618324A (en) * | 2018-05-09 | 2018-10-09 | 张文智 | A kind of multifunctional engineering cost storage device easy to remove |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206971066U (en) | A kind of town road line drawing auxiliary device | |
CN203709454U (en) | Easily-carried construction cost kit | |
CN208286663U (en) | Portable map board holder | |
CN205197267U (en) | Convenient travelling basket | |
CN203735648U (en) | Tool box for work on engineering cost | |
CN205395604U (en) | Portable drawing case of integral type | |
CN203709464U (en) | Construction cost kit convenient for working | |
CN205432532U (en) | Be fit for toolbox that building engineering budget personnel used | |
CN204698027U (en) | Combinable roller wheels of luggage compartment device | |
CN205936366U (en) | Multifunctional electric power overhaul ladder | |
CN203876475U (en) | Portable folding sketching frame | |
CN207152134U (en) | Detachable pull bar leather trunk | |
CN203726472U (en) | Pipe hanging tool trolley | |
KR20140132703A (en) | Paint Bucket roll plate bending roller | |
CN203250253U (en) | Portable mainframe box | |
CN205358576U (en) | Draw -bar box that can increase when keeping flat | |
CN204838633U (en) | Structure is placed to gas jar of barbecue utensil | |
CN203581176U (en) | Bicycle pull rod storage device | |
CN204514414U (en) | A kind of Special water meter case at home | |
CN212700182U (en) | Gunstock structure for backpack fire extinguishing apparatus | |
CN203528180U (en) | Paint box for design major | |
CN203789878U (en) | Novel mop barrel | |
CN209610139U (en) | Contiuum type trolley case | |
CN205162194U (en) | Travelling basket rolling device | |
CN203495920U (en) | Tool box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140716 Termination date: 20150305 |
|
EXPY | Termination of patent right or utility model |