Intermediate row structure Download PDFInfo
- Publication number
- CN203703459U CN203703459U CN201420088438.5U CN201420088438U CN203703459U CN 203703459 U CN203703459 U CN 203703459U CN 201420088438 U CN201420088438 U CN 201420088438U CN 203703459 U CN203703459 U CN 203703459U
- Authority
- CN
- China
- Prior art keywords
- middle row
- arm
- supervisor
- flange
- stiffening rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rigid Pipes And Flexible Pipes (AREA)
Abstract
The utility model discloses an intermediate row structure. The intermediate row structure comprises an intermediate row main pipe (1) and a plurality of intermediate row branch pipes (4) fixed at both sides of the intermediate row main pipe (1); an even number of intermediate row branch pipes (4) are arranged symmetrically about the axis of the intermediate row main pipe (1), a strip-like reinforcing rib (3) is fixedly connected to the bottom of each intermediate row branch pipe (4), and a hoop (5) is further arranged at the blind end of the intermediate row main pipe (1). The intermediate row structure is simple in structure, easy to manufacture and long in service life.
Description
Technical field
The utility model relates to cloth liquid apparatus field, particularly relates to and in one, arranges structure.
Background technique
In the pure water preparation process of petrochemical industry, the water outlet of yin, yang bed is under the prerequisite that meets water quality requirement, simple in structure with it, invest little, output advantages of higher, is now still widely used.Filler in yin, yang bed is respectively anion exchange resin and cation exchange resin, in the time that anion exchange resin and cation exchange resin reach capacity to the absorption of ion, all needs the resin processing of regenerating.
The density of resin is generally less than water, hydrochloric acid solution or sodium hydroxide solution, model as widely used in cation bed in prior art is 001 × 7 strongly acidic styrene type cation exchange resin, like this, no matter be that resin is in the operation cycle or in the regeneration period, when liquid level in yin, yang bed is too high or resin under liquid washing away upwards at the bottom of bed, be arranged on a body in regeneration not and come under the effect of resin kinetic energy and buoyancy, be prone to middle row supervisor and be bent upwards distortion until rupture, middle row's arm and supervisor's tie point or arm are near the situation of Zhi Guanduan weakness fracture.
Model utility content
For being prone in above-mentioned prior art that middle row supervisor is bent upwards distortion until fracture, the problem that middle row's arm and supervisor's tie point or arm rupture near Zhi Guanduan weakness, the utility model provides and in one, has arranged structure.
For addressing the above problem, in the one that the utility model provides, arranging structure achieves the goal by following technological points: in one, arrange structure, comprise middle row supervisor and be fixed on middle row multiple middle row's arm of being responsible for both sides, described middle row's arm is even number, and middle row's arm is with respect to middle row supervisor's axis symmetry, the bottom of each middle row's arm is all fixedly connected with a stiffening rib that is strip, and middle row supervisor's cecum is also provided with a hoop body.
In prior art, the middle row who is arranged in yin, yang bed is cantilever beam structure, the hoop body arranging is for being connected with the offside that middle row takes over side and being fixedly connected with relative with yin, yang bed row supervisor's cecum, like this, middle row supervisor two ends in bed body are all fixed, in the middle of supervisor row and middle row's arm while being subject to active force upwards, because its two ends all suffer restraints, be conducive to prevent that middle row supervisor is bent upwards distortion until rupture or middle row takes over bending break; And on row's arm wall, be provided with multiple bar holes along its axial direction in prior art, when being used for regenerating, this hole passes through the actified solutions such as hydrochloric acid solution or sodium hydroxide, stop resin particle to leak outside, but these bar holes have weakened the intensity of middle row's arm greatly, under the buoyancy of resin and the effect of momentum, near the easy tension crack of middle row's arm lower end bar hole of middle row's main tube end, cause resin leakage, the stiffening rib arranging, for strengthening the intensity of arranging arm, is arranged the ability that arm opposing destroys in increase.
Further technological scheme is:
For ease of after middle row's arm or middle row are responsible for damage to damage parts replacing, improve the utilization rate of intact parts, also comprise the pipe flange that quantity equates with middle row's arm quantity, the connecting end of middle row's arm is provided with an adpting flange, described adpting flange is connected with a pipe flange established law is blue, one end of described pipe flange is fixedly connected on middle supervisor row, for ease of connection and the dismounting of two flanges, two flanges all adopt bolt hole span centre to arrange with respect to middle row's arm.
That takes over middle row for ease of the utility model is connected and is convenient to connection that flange connects and separates, also comprise supervisor's flange, described supervisor's flange is fixedly connected on middle row supervisor's connecting end, and the bolt hole of being responsible on flange is responsible for into span centre layout with respect to middle row.
Because the free end of therefrom arranging arm to itself and middle row supervisor's connecting end moment of flexure becomes large gradually, for saving stiffening rib material consumption, described stiffening rib is from linear the increasing of thickness value of its end to end, and the length direction of any one stiffening rib is all parallel with the axial direction of the middle row's arm being attached thereto, and one end that Rib Thickness is thicker is responsible near middle row.
For reducing stiffening rib its resistance to resin in the time that resin moves upward, optimize the utility model stressed, stiffening rib width linearity increase from the bottom to top in its short transverse described in any one, and the top of stiffening rib is the arc shaped surface of fitting with middle row's arm outer wall, further, stiffening rib lower end is set to arc shaped surface.
For simplifying hoop body structure, be convenient to the manufacture of hoop body, described hoop body comprises u tie body and is fixedly connected on respectively two journal stirrups of u tie body one side, is provided with at least one connecting bolt hole on described journal stirrup, and middle row supervisor's cecum is positioned at the U-groove bevel of u tie body.
The utlity model has following beneficial effect:
1, the utility model is simple in structure, the hoop body arranging is for being fixedly connected with row supervisor's cecum with yin, yang bed bed body, like this, middle row supervisor two ends in bed body are all fixed, when central supervisor row and middle row's arm are subject to active force upwards, because its two ends all suffer restraints, be conducive to prevent that middle row supervisor is bent upwards distortion until fracture or middle row take over bending break.
2 and on row's arm wall, be provided with multiple bar holes along its axial direction in prior art, when being used for regenerating, this hole passes through the actified solutions such as hydrochloric acid solution or sodium hydroxide, stop resin particle to leak outside, but these bar holes have weakened the intensity of middle row's arm greatly, under the buoyancy of resin and the effect of momentum, near the easy tension crack of middle row's arm lower end bar hole of middle row's main tube end, cause resin leakage, the stiffening rib arranging, for strengthening the intensity of arranging arm, is arranged the ability that arm opposing destroys in increase.
Brief description of the drawings
Fig. 1 is the structural representation of a specific embodiment of a kind of middle row's structure described in the utility model;
Fig. 2 is the sectional view of a specific embodiment of a kind of middle row's structural bead described in the utility model.
Mark in figure is respectively: 1, middle row supervisor, 2, supervisor's flange, 3, stiffening rib, 4, middle row's arm, 5, hoop body, 6, a pipe flange.
Embodiment
Below in conjunction with embodiment, the utility model is described in further detail, but structure of the present utility model is not limited only to following examples.
Embodiment 1:
As Fig. 1 and Fig. 2, in one, arrange structure, comprise that middle row is responsible for 1 and be fixed on middle row and be responsible for multiple middle row's arm 4 of 1 both sides, described middle row's arm 4 is even number, and middle row's arm 4 is responsible for 1 axis symmetry with respect to middle row, the bottom of each middle row's arm 4 is all fixedly connected with a stiffening rib 3 that is strip, and middle row is responsible for 1 cecum and is also provided with a hoop body 5.
In prior art, the middle row who is arranged in yin, yang bed is cantilever beam structure, for row is responsible for, 1 cecum is relative with yin, yang bed to be connected with the offside that middle row takes over side and to be fixedly connected with the hoop body 5 arranging, like this, middle row be responsible for 1 in bed body two ends be all fixed, when central supervisor row 1 and middle row's arm 4 are subject to active force upwards, because its two ends all suffer restraints, be conducive to prevent that middle row is responsible for 1 and is bent upwards distortion until fracture or middle row take over bending break; And on row's arm 4 walls, be provided with multiple bar holes along its axial direction in prior art, when being used for regenerating, this hole passes through the actified solutions such as hydrochloric acid solution or sodium hydroxide, stop resin particle to leak outside, but these bar holes have weakened the intensity of middle row's arm 4 greatly, under the buoyancy of resin and the effect of momentum, be responsible for the easy tension crack of middle row's arm 4 lower end bar hole of 1 end near middle row, cause resin leakage, the stiffening rib 3 arranging, for strengthening the intensity of arranging arm 4, is arranged the ability that arm 4 opposings destroy in increase.
Embodiment 2:
The present embodiment is further improved on embodiment 1 basis, as Fig. 1 and Fig. 2, for ease of after middle row's arm 4 or middle row are responsible for 1 damage to damaging the replacing of parts, improve the utilization rate of intact parts, also comprise the pipe flange 6 that quantity equates with middle row's arm 4 quantity, the connecting end of middle row's arm 4 is provided with an adpting flange, described adpting flange is connected with 6 one-tenth flanges of pipe flange, one end of described pipe flange 6 is fixedly connected on middle row and is responsible on 1, for ease of connection and the dismounting of two flanges, two flanges all adopt bolt hole span centre to arrange with respect to middle row's arm 4.
That takes over middle row for ease of the utility model is connected and is convenient to connection that flange connects and separates, also comprise supervisor's flange 2, described supervisor's flange 2 is fixedly connected on middle row and is responsible on 1 connecting end, and bolt hole on supervisor's flange 2 is responsible for 1 one-tenth span centre with respect to middle row and is arranged.
Because the free end of therefrom arranging arm 4 is responsible for 1 connecting end moment of flexure to itself and middle row and is become gradually large, for saving stiffening rib 3 material consumptions, described stiffening rib 3 is from linear the increasing of thickness value of its end to end, and the length direction of any one stiffening rib 3 is all parallel with the axial direction of the middle row's arm 4 being attached thereto, one end that stiffening rib 3 thickness are thicker is responsible for 1 near middle row, and the thickness direction of described stiffening rib 3 is as shown in H in Fig. 2.
Embodiment 3:
The present embodiment is further improved on embodiment 1 basis, as Fig. 1 and Fig. 2, for reducing stiffening rib 3 its resistance to resin in the time that resin moves upward, optimize the utility model stressed, described in any one stiffening rib 3 in its short transverse from the bottom to top width linearity increase, and the top of stiffening rib 3 is and the arc shaped surface of middle row's arm 4 outer wall laminatings, further, stiffening rib 3 lower ends are set to arc shaped surface, and the width direction of described stiffening rib 3 is as shown in W in Fig. 2.
For simplifying hoop body 5 structures, be convenient to the manufacture of hoop body 5, described hoop body 5 comprises u tie body and is fixedly connected on respectively two journal stirrups of u tie body one side, is provided with at least one connecting bolt hole on described journal stirrup, and middle row supervisor's cecum is positioned at the U-groove bevel of u tie body.
Claims (6)
1. arrange structure in one kind, comprise middle row supervisor (1) and be fixed on middle row multiple middle row's arm (4) of being responsible for (1) both sides, it is characterized in that, described middle row's arm (4) is even number, and middle row's arm (4) is responsible for the axis symmetry of (1) with respect to middle row, the bottom of each middle row's arm (4) is all fixedly connected with a stiffening rib (3) that is strip, and middle row supervisor's (1) cecum is also provided with a hoop body (5).
2. in one according to claim 1, arrange structure, it is characterized in that, also comprise the pipe flange (6) that quantity equates with middle row's arm (4) quantity, the connecting end of middle row's arm (4) is provided with an adpting flange, described adpting flange becomes flange to be connected with a pipe flange (6), and one end of described pipe flange (6) is fixedly connected on middle row supervisor (1).
3. in one according to claim 1, arrange structure, it is characterized in that, also comprise supervisor's flange (2), described supervisor's flange (2) is fixedly connected on middle row supervisor's (1) connecting end, and the bolt hole of being responsible on flange (2) is responsible for (1) one-tenth span centre layout with respect to middle row.
4. in one according to claim 1, arrange structure, it is characterized in that, described stiffening rib (3) is from linear the increasing of thickness value of its end to end, and the length direction of any one stiffening rib (3) is all parallel with the axial direction of the middle row's arm (4) being attached thereto, and (1) is responsible near middle row in one end that stiffening rib (3) thickness is thicker.
5. in one according to claim 1, arrange structure, it is characterized in that, stiffening rib described in any one (3) is width linearity increase from the bottom to top in its short transverse, and the top of stiffening rib (3) is the arc shaped surface of fitting with middle row supervisor (4) outer wall.
6. in one according to claim 1, arrange structure, it is characterized in that, described hoop body (5) comprises u tie body and is fixedly connected on respectively two journal stirrups of u tie body one side, on described journal stirrup, be provided with at least one connecting bolt hole, middle row supervisor's (1) cecum is positioned at the U-groove bevel of u tie body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420088438.5U CN203703459U (en) | 2014-02-28 | 2014-02-28 | Intermediate row structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420088438.5U CN203703459U (en) | 2014-02-28 | 2014-02-28 | Intermediate row structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203703459U true CN203703459U (en) | 2014-07-09 |
Family
ID=51053904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420088438.5U Expired - Fee Related CN203703459U (en) | 2014-02-28 | 2014-02-28 | Intermediate row structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203703459U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103803677A (en) * | 2014-02-28 | 2014-05-21 | 成都大漠石油机械有限公司 | Middle draining device for desalted water |
-
2014
- 2014-02-28 CN CN201420088438.5U patent/CN203703459U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103803677A (en) * | 2014-02-28 | 2014-05-21 | 成都大漠石油机械有限公司 | Middle draining device for desalted water |
CN103803677B (en) * | 2014-02-28 | 2015-09-16 | 成都大漠石油机械有限公司 | Arrange in a kind of de-salted water |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203703459U (en) | Intermediate row structure | |
CN211228727U (en) | Combined stainless steel water tank | |
CN103803677B (en) | Arrange in a kind of de-salted water | |
CN203250686U (en) | SF6 pressure meter and density relay checking connection structure | |
CN203316136U (en) | Ion exchange column backwashing device | |
CN207056778U (en) | It is a kind of to remove magnetic device for lithium battery production | |
CN202570738U (en) | Lead plate casting and rolling integrated equipment | |
CN211550659U (en) | Gravity type self-closing valve for cement pneumatic conveying vertical pipeline | |
CN201572646U (en) | Resin regeneration impurity removing device during xylose production | |
CN208595337U (en) | The blast connection device of winding process | |
CN209155873U (en) | Precision processing mixed bed is into acid-alkali regeneration system | |
CN210088456U (en) | Argon filling system for ultraviolet lamp tube | |
CN203754469U (en) | Two-stage resistance distribution intermediate discharge device suitable for ultra-large-diameter counter-current regeneration fixed bed | |
CN206905974U (en) | Finished product pillar film suppresses detection means | |
CN202107831U (en) | High-speed drawing frame roller humidification device | |
CN210496460U (en) | Ion exchange column for purifying glucose | |
CN209917902U (en) | Resin regeneration acid recovery device | |
CN205946854U (en) | A refining ware for cultured equipment | |
CN205182285U (en) | Improved generation is super large diameter filtration equipment for water treatment | |
CN204729820U (en) | A kind of liquid material cleaning discharge system | |
CN103286131A (en) | Lead plate casting and rolling integrated equipment | |
CN102921931B (en) | Bottom die cooling device | |
CN207579305U (en) | A kind of printing cylinder of printing machine | |
CN202336483U (en) | High-pressure water scale-removing lower collecting tube protective plate structure | |
CN202191889U (en) | Discharging device with coop flow controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140709 Termination date: 20150228 |
|