CN203702126U - Manifold system for ground tests of high-pressure gas well - Google Patents

Manifold system for ground tests of high-pressure gas well Download PDF

Info

Publication number
CN203702126U
CN203702126U CN201320749261.4U CN201320749261U CN203702126U CN 203702126 U CN203702126 U CN 203702126U CN 201320749261 U CN201320749261 U CN 201320749261U CN 203702126 U CN203702126 U CN 203702126U
Authority
CN
China
Prior art keywords
gas well
pressure gas
testing
pressure
manifold system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320749261.4U
Other languages
Chinese (zh)
Inventor
龙学
吴方益
李伟
何世云
黎克难
李晖
傅伟
雷先珍
牟小清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Southwest Petroleum Engineering Co ltd
China Petrochemical Corp
Sinopec Oilfield Service Corp
Original Assignee
China Petrochemical Corp
Sinopec Southwest Petroleum Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petrochemical Corp, Sinopec Southwest Petroleum Engineering Co Ltd filed Critical China Petrochemical Corp
Priority to CN201320749261.4U priority Critical patent/CN203702126U/en
Application granted granted Critical
Publication of CN203702126U publication Critical patent/CN203702126U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model provides a manifold system for ground tests of a high-pressure gas well. The manifold system is a testing tree which is arranged at the well mouth of the high-pressure gas well, and comprises multiple stages of testing manifolds connected with each other in series; a blowout opening is formed in the tail end of the testing tree; the testing manifolds extend, and are connected in parallel through flanged crosses arranged at the front ends of pipelines, so that the testing tree diverges in an umbrella-shaped manner from a well mouth end to a blowout opening end; a hand-operated plate valve is arranged on the flanged cross of each pipeline. The manifold system has the functions of hierarchical throttling and pressure drop controlling, so that the test is realized through dropping the pressure stepwise, and safety test requirements of the high-pressure gas well are met; meanwhile, according to the working condition and the construction requirements of a well site, the manifold system can choose the optimal throttling and pressure-controlling combination for testing the manifolds, reduce the on-site workload, and provide guarantee for liquid-draining tests, pressure controlling for production measurement, and safety operation for the high-pressure gas well, so that safety risks in ground liquid draining and ground tests are lowered, and the testing efficiency is increased.

Description

A kind of high-pressure gas well ground test manifold system
Technical field
The utility model relates to Oil/gas Well test construction field, specifically a kind of ground test manifold system of controlling choke pressure drop while producing of asking for discharge opeing.
Background technology
After high-pressure gas well reservoir reconstruction, need to carry out discharge opeing and production test operation, to obtain the preliminary data of gas well, to try to achieve the output after reservoir is pressed after calculating.For ensureing the job safety of discharge opeing and production test, choke pressure control technology in conjunction with high-pressure gas well, for the test of high-pressure gas well, need to adopt resistance oil nozzle sleeve and interior oil nozzle, the plug etc. of one-level, secondary and three grades of test manifolds of ground test manifold system to carry out controlled hypotension, discharge opeing step by step.Taking test manifold, resistance oil nozzle sleeve as core realizes the choke pressure drop control to well head pressure, ensure and press rear discharge opeing and production test to carry out smoothly.
Carry out in test process at high-pressure gas well, for well head high pressure in the time there is thorn erosion in part pipeline or oil nozzle, can open other pipelines and continue discharge opeings and close to damage pipeline control flat gate valve and rectify and improve, realize high-pressure gas well safety test.In earlier stage conventional gas well ground test manifold system, in the time that the erosion of pipeline thorn appears in discharge opeing, can only be rectified and improved rear continuation discharge opeing by closing well, is unfavorable for the row of returning as early as possible of liquid in well and is detained liquid and increases the weight of reservoir pollution, has affected the output of natural gas.
Summary of the invention
The purpose of this utility model is to provide a kind of high-pressure gas well ground test manifold system, and the throttling pressure control problem in product is asked in the discharge opeing that effectively solves high-pressure gas well.
The technical scheme that the utility model adopts is:
A kind of high-pressure gas well ground test manifold system, is arranged on well head, is connected in series the testing tree forming by multistage test manifold, and the end of testing tree arranges spout; The flanged cross that described test manifold arranges by pipeline front end is expanded parallel connection, testing tree is dispersed by uphole end to spout end umbrella, on the flanged cross of every pipeline, is provided with manual flat valve.
On the flanged cross front end pipeline of described first order test manifold, be provided with hydraulic control flap type.
On the pipeline at described flanged cross rear, be socketed with resistance oil nozzle sleeve, resistance oil nozzle sleeve inside is provided with oil nozzle and seal plug.
The beneficial effect that the utility model produces is:
The utlity model has the function of classification throttling, control pressure drop, can realize test step pressure reducing, meet high-pressure gas well safety test requirement, simultaneously can be according to well site operating mode and construction requirement, choose best throttling pressure control combined test manifold, reduce site work amount, for high-pressure gas well is tested discharge opeing, asked product pressure control and safety work that guarantee is provided, the security risk that has reduced ground discharge opeing and test, has improved testing efficiency.
Compared with prior art, the utlity model has following advantage:
(1) there is reducing pressure by regulating flow function step by step, can steadily reduce well head pressure, met the steady step-down requirement of high-pressure gas well, effectively avoided affecting discharge opeing because the excessive formation ice of choke pressure drop is stifled, asking product.
(2) discharge opeing and asking in product process after pressure, if meet manifold gate valve etc. while occurring that thorn erosion or abnormal conditions occur, without closing well, can damage passage by fluid control valve quick closedown, opens other passages of manifold simultaneously and guarantees that discharge opeing continues to carry out.
(3) can be according to Gas Reservoirs pressure size, the port number in flexible configuration ground test manifold progression and manifold at different levels.
(4), in test process, the serious thing of oil nozzle thorn erosion, can open resistance oil nozzle sleeve quickly and easily to complete the replacing of oil nozzle.
(5) can, according to well site operating mode and ground condition, the putting position of manifolds at different levels be set flexibly.
(6) every group of manifold adopts flap type that four-way series connection is separated by, and according to reality, shunting needs to select flexibly corresponding manifold passage.
Brief description of the drawings
Below in conjunction with accompanying drawing, the utility model is further described
Fig. 1 is a kind of structural representation of the present utility model;
Fig. 2 is the local structural representation amplifying of the A of Fig. 1.
Code name in figure: 1-oil pipe, 2-oil pipe cover annular space, 3-high pressure line, 4-hydraulic control flap type, 5-flanged cross, 6-manual flat valve, 7-resistance oil nozzle sleeve, 8-oil nozzle, 9-plug; E-well head, L-one-level test manifold, M-secondary test manifold, tri-grades of test manifolds of N-, F-spout.
Detailed description of the invention
As shown in Figure 1, 2, the utility model is a kind of high-pressure gas well ground test manifold system, is arranged on well head E, is connected in series the testing tree forming by multistage test manifold, and the end of testing tree arranges spout F.Test manifolds at different levels by the flanged cross 5 of every pipeline front end setting expand successively in parallel, make testing tree hold to spout F end umbrella and disperse by well head E.On every pipeline in test manifolds at different levels, be provided with the parts such as manual flat valve 6 and/or hydraulic control flap type 4, resistance oil nozzle sleeve 7, oil nozzle 8.Concrete:
On the flanged cross 5 front end pipelines of the first order test manifold L being connected with well head E, be provided with hydraulic control flap type 4.On the flanged cross 5 of every pipeline in every grade of test manifold, be provided with manual flat valve 6.Flanged cross 5 rears, be transmitted on the pipeline of subordinate and be connected with resistance oil nozzle sleeve 7, resistance oil nozzle sleeve 7 inside are provided with oil nozzle 8 and seal plug 9, resistance oil nozzle sleeve 7 and inner oil nozzle 8 thereof, plug 9 are reducing pressure by regulating flow system step by step, realize choke pressure drop size control function by changing different size oil nozzle 8.
In this detailed description of the invention, high-pressure gas well ground test manifold system is the testing tree with the test manifold (one-level test manifold L, secondary test manifold M, three grades of test manifold N) of three grades.Herein, the progression of high-pressure gas well ground test manifold system also can expand and reduce according to actual conditions.Specific as follows:
Oil pipe 1, oil pipe cover annular space 2 on well head E christmas tree are connected to one-level test manifold L by 2 high pressure lines 3 respectively, and one-level test manifold L has 4 pipelines.4 pipeline front ends of one-level test manifold L are provided with hydraulic control flap type 4, and hydraulic control flap type 4 is arranged on the rear of oil pipe 1 and oil pipe cover annular space 2, regulates the intrasystem flow of test manifold and pressure at first.The pipeline of 4 one-level test manifold L, be connected with flanged cross 5 at hydraulic control flap type 4 rears, flanged cross 5 connects, makes flow that high pressure line 3 sends and pressure in this shunting, step-down mutually.On flanged cross 5, be provided with manual flat valve 6, for regulating flow and the pressure of one-level test manifold L.Flanged cross 5 rears of one-level test manifold L, be transmitted on the pipeline of subordinate and be connected with resistance oil nozzle sleeve 7, resistance oil nozzle sleeve 7 inside are provided with oil nozzle 8 and seal plug 9.If broken down and problem on one-level test manifold L, can close in time this defective pipe by seal plug 9, this,, for the traditional mechanism of ground test tree, is just not repeated.Herein, flanged cross 5 can be parallel with one another, and the pipeline quantity of one-level test manifold L can expand and reduce according to actual conditions.
One group between two of the pipeline of 4 one-level test manifold L, be divided into two groups, the end of every group of pipeline is connected with the pipeline of 3 secondary test manifold M by 3 flanged cross 5, make 6 secondary test pipelines be divided into two groups, be respectively secondary test manifold M1 and secondary test manifold M2.On flanged cross 5, be provided with manual flat valve 6, flanged cross 5 rears, be transmitted on the pipeline of subordinate and be connected with resistance oil nozzle sleeve 7, resistance oil nozzle sleeve 7 inside are provided with oil nozzle 8 and seal plug 9.Herein, flanged cross 5 can be parallel with one another, and the pipeline quantity of secondary test manifold M can expand and reduce according to actual conditions.
The end of every group of secondary test manifold M1 and M2 is connected with again the pipeline of 4 three grades of test manifold N by 4 flanged cross 5, make 8 three grades test pipelines be divided into two groups, is respectively three grades of test manifold N1 and N2.On flanged cross 5, be provided with manual flat valve 6, flanged cross 5 rears, be transmitted on the pipeline of subordinate and be connected with resistance oil nozzle sleeve 7, resistance oil nozzle sleeve 7 inside are provided with oil nozzle 8 and seal plug 9.Herein, flanged cross 5 can be parallel with one another, and the pipeline quantity of three grades of test manifold N can expand and reduce according to actual conditions.
The pipeline end of 8 three grades of test manifold N is connected in parallel, arranges spout F.
Using method of the present utility model is as follows:
High-pressure gas well, driving a well before test, should, according to designing the oil nozzle 8 that suitable dimension is installed in advance in resistance oil nozzle sleeve 7, be assembled above-mentioned all parts.When test, according to principle outer after in first, open step by step successively the control gate valve (hydraulic control flap type 4 and manual flat valve 6) of test manifolds at different levels, by opening or closing, hydraulic control flap type 4, manual flat valve 6 combinations of one-level to three grade test manifold realize wall scroll, many pipelines are opened or close and carry out open flow discharge opeing and ask product.Realize controlled hypotension step by step by oil nozzle 8 and plug 9, avoid choke pressure drop excessively to cause ice stifled to affect discharge opeing, ask product.

Claims (3)

1. a high-pressure gas well ground test manifold system, is arranged on well head, is connected in series the testing tree forming by multistage test manifold, and the end of testing tree arranges spout; It is characterized in that: the flanged cross that described test manifold arranges by pipeline front end is expanded parallel connection, testing tree is dispersed by uphole end to spout end umbrella, on the flanged cross of every pipeline, is provided with manual flat valve.
2. high-pressure gas well ground test manifold system according to claim 1, is characterized in that: in described test manifold, be provided with hydraulic control flap type on the flanged cross front end pipeline of first order test manifold.
3. high-pressure gas well ground test manifold system according to claim 1, is characterized in that: on the pipeline at described flanged cross rear, be socketed with resistance oil nozzle sleeve, resistance oil nozzle sleeve inside is provided with oil nozzle and seal plug.
CN201320749261.4U 2013-11-25 2013-11-25 Manifold system for ground tests of high-pressure gas well Expired - Lifetime CN203702126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320749261.4U CN203702126U (en) 2013-11-25 2013-11-25 Manifold system for ground tests of high-pressure gas well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320749261.4U CN203702126U (en) 2013-11-25 2013-11-25 Manifold system for ground tests of high-pressure gas well

Publications (1)

Publication Number Publication Date
CN203702126U true CN203702126U (en) 2014-07-09

Family

ID=51052582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320749261.4U Expired - Lifetime CN203702126U (en) 2013-11-25 2013-11-25 Manifold system for ground tests of high-pressure gas well

Country Status (1)

Country Link
CN (1) CN203702126U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988741A (en) * 2017-02-22 2017-07-28 中国石油化工股份有限公司 A kind of sour gas well gas testing production test unit
CN112983350A (en) * 2021-04-14 2021-06-18 盐城佰信石油机械有限公司 Wellhead back pressure regulation and control method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988741A (en) * 2017-02-22 2017-07-28 中国石油化工股份有限公司 A kind of sour gas well gas testing production test unit
CN112983350A (en) * 2021-04-14 2021-06-18 盐城佰信石油机械有限公司 Wellhead back pressure regulation and control method and device

Similar Documents

Publication Publication Date Title
CN102330546B (en) Open hole staged fracturing well completion pipe string provided with controllable valve and hydraulic control switching pipe string
CN102373900B (en) Staged fracturing well completion method using hydraulic-controlled switch to open/close controllable valves
CN103470239B (en) A kind of continuous fracturing technology method of dragging with pressure
CN103065538A (en) Indoor drilling accident and well control technology simulation test device
CN212201992U (en) Universal valve body integrated device for single well and group well water-mixing wellhead process
CN205100930U (en) Multistage preventer pressure testing system of well head and pressure testing device thereof
CN104005742B (en) A kind of method for testing lab simulation Heterogeneous reservoir difference water filling and device
CN203702126U (en) Manifold system for ground tests of high-pressure gas well
CN111042772A (en) Inter-well series connection drainage gas recovery device and drainage gas recovery method
CN200949439Y (en) Oil pipe hanger device with cut-off valve
CN203145893U (en) Watering combination valve used on mouth of producing well
CN202338775U (en) Online blow-down apparatus for high-pressure natural gas pipeline
CN206831177U (en) One kind, which is concentrated, mixes dilute equipment
CN210317259U (en) Gas lift device suitable for gas well full life cycle drainage gas production
CN202924372U (en) Sucker used for extracting mosaic particles
CN206592093U (en) Change wellhead connector in oil field four
CN104213848B (en) A kind of arc sealing device and using method for pipeline with pressure or drilling rod perforate
CN103375159A (en) Multi-flowing-hole slide bushing and multistage horizontal well fracturing slide bushing string
CN104727778B (en) Remote high-pressure well opening emergency cut-off device
CN203925470U (en) Glass tube oil gauge device
CN203008855U (en) Three-stage choke blowout manifold
CN108166956B (en) Nozzle-replaceable throttle and application method thereof
CN207934875U (en) A kind of interchangeable nozzles formula flow controller
CN203905909U (en) Deep-well adjustable low-density fluid fast liquid discharge well testing device
CN212298590U (en) Synchronous pressure testing device for natural gas module skid-mounted pipeline system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151124

Address after: 100029 Beijing Chaoyang District Hui Xin a No. twelve layer 6

Patentee after: SINOPEC OILFIELD SERVICE Corp.

Patentee after: Sinopec Southwest Petroleum Engineering Co.,Ltd.

Address before: 100027 Beijing, Chaoyangmen, North Street, No. 22, No.

Patentee before: CHINA PETROLEUM & CHEMICAL Corp.

Patentee before: Sinopec Southwest Petroleum Engineering Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210824

Address after: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Patentee after: SINOPEC Group

Patentee after: SINOPEC OILFIELD SERVICE Corp.

Patentee after: Sinopec Southwest Petroleum Engineering Co.,Ltd.

Address before: 12 / F, No. 6, Huixin a, Chaoyang District, Beijing 100029

Patentee before: SINOPEC OILFIELD SERVICE Corp.

Patentee before: Sinopec Southwest Petroleum Engineering Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140709