CN203701637U - Noise-free crushing plant of concrete structure - Google Patents

Noise-free crushing plant of concrete structure Download PDF

Info

Publication number
CN203701637U
CN203701637U CN201420041392.1U CN201420041392U CN203701637U CN 203701637 U CN203701637 U CN 203701637U CN 201420041392 U CN201420041392 U CN 201420041392U CN 203701637 U CN203701637 U CN 203701637U
Authority
CN
China
Prior art keywords
main frame
eagle
concrete
limited rack
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420041392.1U
Other languages
Chinese (zh)
Inventor
葛培中
姚蓉蓉
李云康
王书广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420041392.1U priority Critical patent/CN203701637U/en
Application granted granted Critical
Publication of CN203701637U publication Critical patent/CN203701637U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to the technical field of engineering construction, in particular to a noise-free crushing plant and method of a concrete structure. The noise-free crushing plant comprises a jack and is characterized by being composed of the jack, a main frame, a pair of eagle nose pliers, a connection shaft, a limiting frame and an adjusting board, wherein the middle of the eagle nose pliers is connected with the left portion of the main frame through the connection shaft, the limiting frame is arranged on the lower portion of the main frame, the position of the limiting frame is movably changed along a plurality of regulating holes in the main frame along with the sizes of concrete components, the eagle nose pliers are driven by the jack to rotate with the connection shaft as the axis and crush concrete on the side, then the limiting frame is tightened, and the rest of the concrete is crushed. Compared with the prior art, the noise-free crushing plant has the advantages that the concrete components with different sizes can be crushed only by changing the position, on the main frame, of the limiting frame; the jack is adopted for crushing by means of static force extrusion, no noise or vibration is produced, and work efficiency is high.

Description

A kind of about the noiselessness breaker to concrete structure
[technical field]
The utility model relates to Construction Technology field, specifically a kind of about the noiselessness breaker to concrete structure.
[background technology]
As everyone knows, when concrete structure carries out partial dismantling or overall pulling down, generally adopt crawler type pick machine or pneumatic pick, in some object of construction production that control is had relatively high expectations to Construction Vibration, adopt cutting disassembling, cut into the segment of about 3m by concrete component, hang with crane.These disadvantage of removing mode are exactly that noise is large, especially when several even tens equipment are constructed simultaneously, high-intensity noise damages not only to labourer's body and mind, and noise transmission is far away, become the complaint focus of periphery resident, school and business office, therefore, the problem that disturbs residents of Demolition Construction is one threshold that builing industry is difficult to go beyond always.
Existing so-called soundless cracking technology, be to utilize the chemical action of expansion agent by concrete component expansion crack, the steps include: to adopt hammer drill to punch on concrete component, in expansion agent load hole, expansion agent expands and causes concrete cracking, uses afterwards pneumatic pick fragmentation again.As can be seen here, while punchinging with second-time breakage, all produce noise, and efficiency is lower.In addition, on market, also has a kind of concrete disintegrating forceps, noiselessness, friction, but it can clamp broken member width (or thickness) generally in 400mm, need to remove and be no lack of the member that 800mm, 1000mm are even larger in reality, as the horizontal support of deep foundation ditch, large-span concrete beam, equipment Foundations etc.
[utility model content]
The purpose of this utility model be exactly noise when solving concrete disintegrating in prior art large, cannot broken large-scale component and inefficient technical problem, a kind of noiselessness, friction are provided, can not cause damage to labourer and surrounding environment, efficiency is high, and is applicable to the relevant noiselessness breaker to concrete structure of large, medium and small type member fragmentation simultaneously.
To achieve these goals, provide a kind of about the noiselessness breaker to concrete structure, comprise jack, this device is by jack, main frame, eagle's beak pliers, connecting shaft, position-limited rack, adjustable plate composition, main frame 1 profile is triangular frame structure, the top of main frame 1 connects the right-hand member of jack 4 by crab-bolt 7, the left end of jack 4 connects the upper end of eagle's beak pliers 2 by crab-bolt 7, the left part of the centre of eagle's beak pliers 2 and main frame 1 is connected by connecting shaft 6, described eagle's beak pliers 2 rotates as axle center take connecting shaft 6, position-limited rack 3 is located at main frame 1 bottom, the position of described position-limited rack 3 is with the size of concrete component 5, along some adjustment hole 9 activity change on main frame, between eagle's beak pliers 2 bottoms and position-limited rack 3, be provided with concrete component to be broken 5.
Described eagle's beak pliers 2 lower ends are olecranon shape, and eagle's beak pliers 2 blocks a side of concrete component 5, are responsible for transmitting the pressure of jack, will be positioned at the concrete disintegrating at this position simultaneously.
Described position-limited rack 3 is positioned at the opposite side of concrete component 5, and the pressure that main frame is transmitted is dispersed in concrete component 5 surfaces, and in shattering process, this side concrete can not be broken.
Several adjustment hole 9 sizes on described main frame 1 are identical, and equidistant arrangement in the same horizontal line, and after the location positioning of position-limited rack 3, position-limited rack 3 relies on adjustment hole 9 to be fixed on main frame 1.
Described position-limited rack 3 is provided with adjustable plate 8, and adjustable plate 8 is adjusted the gap of position-limited rack 3 and concrete component 5, so that before jack startup, the olecranon of adjustable plate 8 and eagle's beak pliers 2 bottoms can both touch concrete component 5.
Compared with the existing technology, its advantage is the utility model: only need to change the position of position-limited rack on main frame, just applicable to fragmentation large-scale, medium-sized or small-size concrete member; Be to push by static(al) the fragmentation of carrying out owing to adopting jack, therefore noiselessness, friction, in improving working environment, liberating the productive forces, has also improved operating efficiency.
[accompanying drawing explanation]
Fig. 1 is the structure chart of each assembling parts in the utility model;
Fig. 2 is that the utility model tightens up the schematic diagram after position-limited rack;
In figure: 1. main frame, 2. eagle's beak pliers, 3. position-limited rack, 4. jack, 5. concrete component, 6. connecting shaft, 7. crab-bolt, 8. adjustable plate, 9. adjustment hole;
Specifying Fig. 2 is Figure of abstract of the present utility model.
[specific embodiment]
Below in conjunction with accompanying drawing, the utility model is described in further detail, and the Machine Manufacturing Technology of this noiselessness breaker to concrete structure is very clearly concerning this professional people.
Embodiment 1
As shown in Figure 1, it is the structure chart of the each assembling parts of the utility model, comprise jack, this device is by jack, main frame, eagle's beak pliers, connecting shaft, position-limited rack, adjustable plate composition, main frame 1 profile is triangular frame structure, the top of main frame 1 connects the right-hand member of jack 4 by crab-bolt 7, the left end of jack 4 connects the upper end of eagle's beak pliers 2 by crab-bolt 7, the left part of the centre of eagle's beak pliers 2 and main frame 1 is connected by connecting shaft 6, eagle's beak pliers 2 rotates as axle center take connecting shaft 6, position-limited rack 3 is located at main frame 1 bottom, the position of position-limited rack 3 is with the size of concrete component 5, along some adjustment hole 9 activity change on main frame, between eagle's beak pliers 2 bottoms and position-limited rack 3, be provided with concrete component to be broken 5.
Eagle's beak pliers 2 lower ends are olecranon shape, and eagle's beak pliers 2 blocks a side of concrete component 5, are responsible for transmitting the pressure of jack, will be positioned at the concrete disintegrating at this position simultaneously.
Position-limited rack 3 is positioned at the opposite side of concrete component 5, and the pressure that main frame is transmitted is dispersed in concrete component 5 surfaces, and in shattering process, this side concrete can not be broken.
Several adjustment hole 9 sizes on main frame 1 are identical, and equidistant arrangement in the same horizontal line, and after the location positioning of position-limited rack 3, position-limited rack 3 relies on adjustment hole 9 to be fixed on main frame 1.
Position-limited rack 3 is provided with adjustable plate 8, and adjustable plate 8 is adjusted the gap of position-limited rack 3 and concrete component 5, so that before jack startup, the olecranon of adjustable plate 8 and eagle's beak pliers 2 bottoms can both touch concrete component 5.
The using method of this noiselessness breaker, provide broken power by jack 4, according to lever principle, the olecranon of eagle's beak pliers 2 bottoms produces and pushes and make its fragmentation concrete component 5, after fragmentation completes certain limit, tighten up position-limited rack 3, remainder is continued broken, until complete, step is as follows:
A. determine position-limited rack 3 positions:
Measure the size of concrete component 5, determine the position of position-limited rack 3, utilize adjustment hole 9 position-limited rack 3 to be fixed on to the bottom of main frame 1, the top that then this device is moved to concrete component 5 is prepared to implement broken;
B. adjust the gap of this device and concrete component
Between this breaker and concrete component 5, there is certain gap, regulate the thickness of the adjustable plate 8 on position-limited rack 3, eagle's beak pliers 2 is contacted with concrete component 5 as far as possible with adjustable plate 8, thereby realize best crushing effect;
C. attrition crushing:
Start jack 4 it is extended, tighten up according to lever principle eagle's beak pliers 2, and concrete component 5 is produced to extruding, concrete disintegrating in the time that local compressive stress exceedes concrete resistance;
D. expand broken scope:
Operation jack 4 makes it bounce back to reset condition, and the jaw of eagle's beak pliers 2 is opened, and removes a break-up point certain distance, repeats above-mentioned steps, and broken scope is expanded;
E. tighten up position-limited rack:
Fig. 2 is that the utility model tightens up the schematic diagram after position-limited rack, when one jiao of concrete component 5 along long after fragmentation, tighten up position-limited rack 3, the Olecranon clip of eagle's beak pliers 2 bottoms is on the plane of disruption, adjust adjustable plate 8 makes it withstand concrete component 5 simultaneously, repeat above-mentioned c, d step, and finally realize the complete fragmentation to concrete component 8.

Claims (5)

1. one kind about the noiselessness breaker to concrete structure, comprise jack, it is characterized in that this device is by jack, main frame, eagle's beak pliers, connecting shaft, position-limited rack, adjustable plate composition, main frame (1) profile is triangular frame structure, the top of main frame (1) connects the right-hand member of jack (4) by crab-bolt (7), the left end of jack (4) connects the upper end of eagle's beak pliers (2) by crab-bolt (7), the left part of the centre of eagle's beak pliers (2) and main frame (1) is connected by connecting shaft (6), described eagle's beak pliers (2) rotates as axle center take connecting shaft (6), position-limited rack (3) is located at main frame (1) bottom, the position of described position-limited rack (3) is with the size of concrete component (5), along some adjustment holes (9) activity change on main frame, between eagle's beak pliers (2) bottom and position-limited rack (3), be provided with concrete component to be broken (5).
2. as claimed in claim 1 a kind of about the noiselessness breaker to concrete structure, it is characterized in that described eagle's beak pliers (2) lower end is olecranon shape, eagle's beak pliers (2) blocks a side of concrete component (5), the pressure of being responsible for transmitting jack will be positioned at the concrete disintegrating at this position simultaneously.
3. as claimed in claim 1 a kind of about the noiselessness breaker to concrete structure, it is characterized in that described position-limited rack (3) is positioned at the opposite side of concrete component (5), the pressure that main frame is transmitted is dispersed in concrete component (5) surface, in shattering process, this side concrete can not be broken.
4. as claimed in claim 1 a kind of about the noiselessness breaker to concrete structure, it is characterized in that several adjustment holes (9) size on described main frame (1) is identical, and equidistant arrangement in the same horizontal line, after the location positioning of position-limited rack (3), position-limited rack (3) relies on adjustment hole (9) to be fixed on main frame (1).
5. as claimed in claim 1 a kind of about the noiselessness breaker to concrete structure, it is characterized in that described position-limited rack (3) is provided with adjustable plate (8), adjustable plate (8) is adjusted the gap of position-limited rack (3) and concrete component (5), so that before jack starts, the olecranon of adjustable plate (8) and eagle's beak pliers (2) bottom can both touch concrete component (5).
CN201420041392.1U 2014-01-23 2014-01-23 Noise-free crushing plant of concrete structure Expired - Fee Related CN203701637U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420041392.1U CN203701637U (en) 2014-01-23 2014-01-23 Noise-free crushing plant of concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420041392.1U CN203701637U (en) 2014-01-23 2014-01-23 Noise-free crushing plant of concrete structure

Publications (1)

Publication Number Publication Date
CN203701637U true CN203701637U (en) 2014-07-09

Family

ID=51052093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420041392.1U Expired - Fee Related CN203701637U (en) 2014-01-23 2014-01-23 Noise-free crushing plant of concrete structure

Country Status (1)

Country Link
CN (1) CN203701637U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711331A (en) * 2014-01-23 2014-04-09 葛培中 Silent crushing device and method for concrete structures

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711331A (en) * 2014-01-23 2014-04-09 葛培中 Silent crushing device and method for concrete structures
CN103711331B (en) * 2014-01-23 2016-04-20 葛培中 A kind of about to the noiselessness breaker of concrete structure and breaking method

Similar Documents

Publication Publication Date Title
CN203701637U (en) Noise-free crushing plant of concrete structure
CN206870057U (en) A kind of solid-wood bending apparatus
CN103711331B (en) A kind of about to the noiselessness breaker of concrete structure and breaking method
CN203305384U (en) Fixing device for hole forming in wall
CN204672317U (en) Efficient boulder cracker
CN204019078U (en) A kind of forcing press being suitable for bore bit assembling
CN104328796A (en) On-line overall replacement method of equipment foundation
CN211805833U (en) Template assembly and disassembly tools
CN203109134U (en) Marking knife for cutting large forgings
CN203201471U (en) Dry-type coring bit
JP2013189775A (en) Center cutting method and crusher used for the same
CN203236414U (en) Disassembly device of hydraulic hammer neck bush
CN205689146U (en) A kind of hydraulic tongs sucker rod unloads buckle assembly
CN207272116U (en) A kind of slab caster mould gap cleaning plant
CN206838869U (en) Quick-changing type blanking die
CN110252487A (en) A kind of civil construction waste crushing device
CN204343147U (en) The removal tool of road forms location reinforcing bar
CN205135420U (en) Spade that area pushed down guide card drill bit of digging a well
CN204897948U (en) Build phase inverter that stove bottom was used by laying bricks or stones
CN203621610U (en) Hydraulic nut splitter applied to oil and gas well mouth
CN202482920U (en) Small amplitude vibratory excavator
CN207273122U (en) A kind of cataclasm cutting edge attaching/detaching apparatus of cold rolling
CN203487423U (en) Taking-out tool for pre-buried sleeve in high-speed rail concrete sleeper
CN202861743U (en) Hydraulic support hinged pin disassembling pin puller
CN204220867U (en) Automatically the steel bar thick machine of fixture is opened

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709