CN203701396U - Threaded hook used for mounting ceiling or roof pipeline - Google Patents
Threaded hook used for mounting ceiling or roof pipeline Download PDFInfo
- Publication number
- CN203701396U CN203701396U CN201320874725.4U CN201320874725U CN203701396U CN 203701396 U CN203701396 U CN 203701396U CN 201320874725 U CN201320874725 U CN 201320874725U CN 203701396 U CN203701396 U CN 203701396U
- Authority
- CN
- China
- Prior art keywords
- roof
- joint portion
- furred ceiling
- rod
- screw thread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Abstract
The utility model relates to a threaded hook used for mounting a ceiling or a roof pipeline. The threaded hook is characterized by comprising a plate body, wherein the plate body at least comprises a roof combination part and a rod body combination part, wherein drive pin holes for allowing drive pins to be injected into are formed in the roof combination part, the roof combination part is tightly fitted to the corresponding parts of a roof or a vertical wall body through the drive pins injected into the drive pin holes, a rod body fixing structure is formed on the rod body combination part, and the end part of a ceiling lead screw or the end part of a bent metal rod body is fixedly connected with the plate body through the rod body fixing structure. After the threaded hook provided by the utility model is adopted, when the ceiling is mounted, the efficiency is at least ten times that in the past, and no contamination to workers is caused. Meanwhile, when the roof pipeline is mounted, the trouble of needing to equip the pipeline with a special pipe clamp is omitted.
Description
Technical field
The utility model relates to a kind of screw thread suspension hook structure of the pipe laying for ceiling installation or roof.
Background technology
At present, the modal mounting means of ceiling is to fix vertical one by one furred ceiling screw mandrel at the desired location of roof ceiling, in the bottom of furred ceiling screw mandrel, certain mounting structure is installed subsequently, then sheet material is installed on this section bar, complete the installation of whole furred ceiling.In order to improve the installation effectiveness of furred ceiling, those skilled in the art's the starting point is to improve the mounting structure of furred ceiling screw mandrel bottom at present, for example application number is 201310335161.1, name is called the utility application of " furred ceiling ", application number is 201110111081.9, name is called the utility application of " mounting structure of a kind of ceiling decoration bar and suspended ceiling pinch plate ", application number is 200710068522.5, and name is called the utility application of " keel mounting method of Integral ceiling and ceiling structure " etc.Hardly realize, what ceiling installation effectiveness was had the greatest impact is not the assembling of mounting structure, but furred ceiling screw mandrel is fixed to the process on roof ceiling.Furred ceiling screw mandrel adopts setscrew to coordinate sleeve pipe and cone cap to be fixed on roof ceiling conventionally, when installation, need first to utilize ladder climbing to below, roof by operating personnel, utilize special tool on roof ceiling, to get out the embedded hole of setscrew, recycling special tool is squeezed into setscrew in embedded hole, and furred ceiling screw mandrel is installed subsequently.There is following problem in said process: the first, inefficiency.The second, bore in the process of embedded hole on roof and setscrew squeezed in the process in embedded hole, having a large amount of dusts falls, operating personnel in whole process, all face upward operation and also nearer apart from roof, the dust being fallen by roof almost all drops down onto operating personnel's face, long-term health that in the past can grievous injury operating personnel respiratory system.
In addition, the installation of roof pipeline at present generally adopts pipe clamp, and the pipeline of different-diameter and shape, is equipped with different pipe clamps, once there is at the scene the situation that pipe clamp is lost or damaged, cannot proceed to install, and the progress of whole engineering is caused to significant impact.
Summary of the invention
The technical problems to be solved in the utility model is to improve the installation effectiveness of furred ceiling screw mandrel, meanwhile, adapts to the installation of different pipelines.
In order to solve the problems of the technologies described above, the technical solution of the utility model has been to provide a kind of screw thread suspension hook for furred ceiling and roof pipeline installation, it is characterized in that: comprise plate body, this plate body at least comprises joint portion, roof and body of rod joint portion, joint portion, roof by the appropriate section on the nailing injected and roof or vertically body of wall top fit tightly, on body of rod joint portion, be formed with body of rod fixed structure, the end of the end of furred ceiling screw mandrel or the metallic rod body bending is fixedly connected with plate body by this body of rod fixed structure.
Preferably, described plate body is L-type plate body, the joint portion, roof of this L-type plate body and its body of rod joint portion are angle α, its joint portion, roof fits tightly by nailing and the roof injected in described nailing hole, and the end of the end of furred ceiling screw mandrel or the metallic rod body bending is fixedly connected with L-type plate body by described body of rod fixed structure.
Preferably, 180 ° of angle α < described in 0 ° of <.
Preferably, described plate body is Z-shaped plate body, between the joint portion, roof of this Z-shaped plate body and body of rod joint portion, pass through transition part transition, transition part is all perpendicular with joint portion, roof and body of rod joint portion, its joint portion, roof fits tightly by the flange position, right angle of injecting nailing and roof, and the end of the end of furred ceiling screw mandrel or the metallic rod body bending is fixedly connected with Z-shaped plate body by described body of rod fixed structure.
Preferably, described plate body is I template body, its joint portion, roof fits tightly by vertical ledge or the vertical body of wall top of injecting nailing and roof, and the end of the end of furred ceiling screw mandrel or the metallic rod body bending is fixedly connected with I template body by this body of rod fixed structure.
Preferably, described body of rod fixed structure comprises at least one the first arc protrusion and at least one the second arc protrusion that on body of rod joint portion, swell in the opposite direction, the space that is jointly formed the end of the metallic rod body that holds the end of described furred ceiling screw mandrel or bend by all the first arc protrusions and the second arc protrusion, the end of the end of furred ceiling screw mandrel or the metallic rod body bending is stretched in this space and is fixed.
Preferably, on the inwall of the first arc protrusion and/or the second arc protrusion, be formed with screw thread.
Preferably, on joint portion, described roof, be formed with at least two reinforcing ribs, all reinforcing ribs all extend to described body of rod joint portion.
Preferably, on joint portion, described roof, have the nailing hole for injecting nailing.
After the screw thread suspension hook that employing the utility model provides, in the time carrying out installation of ceiling, can like a cork furred ceiling screw mandrel be fixedly connected with the utility model, use subsequently the ail shooter with extension bar, operating personnel station just can utilize on the ground screw thread suspension hook that nailing provides the utility model and on furred ceiling screw mandrel be fixed on the relevant position on roof, not only can not impact operating personnel's health, and efficiency is at least in the past 10 times.Simultaneously, in carrying out roof pipeline installation, can on-the-spot utilize simple instrument, according to the formation of pipeline, Metallic rod is bent to moulding, and the screw thread suspension hook that a utility model provides is inserted respectively in the Metallic rod two ends that bend, hold after pipeline by Metallic rod, operating personnel just can utilize the ail shooter with extension bar, stand and utilize on the ground screw thread suspension hook that nailing provides the utility model and pipeline to be fixed on the relevant position on roof, having saved need to be the trouble that pipeline is equipped with specialized Perkins joint.
Brief description of the drawings
Fig. 1 is the front view of a kind of L-type screw thread suspension hook for furred ceiling and roof pipeline installation in embodiment 1;
Fig. 2 is the top view of a kind of L-type screw thread suspension hook for furred ceiling and roof pipeline installation in embodiment 1;
Fig. 3 is the upward view of a kind of L-type screw thread suspension hook for furred ceiling and roof pipeline installation in embodiment 1;
Fig. 4 is the front view of a kind of Z-type screw thread suspension hook for furred ceiling and roof pipeline installation in embodiment 2;
Fig. 5 is the top view of a kind of Z-type screw thread suspension hook for furred ceiling and roof pipeline installation in embodiment 2;
Fig. 6 is the lateral view of a kind of Z-type screw thread suspension hook for furred ceiling and roof pipeline installation in embodiment 2;
Fig. 7 is the front view of a kind of I type screw thread suspension hook for furred ceiling and roof pipeline installation in embodiment 3;
Fig. 8 is the top view of a kind of I type screw thread suspension hook for furred ceiling and roof pipeline installation in embodiment 3;
Fig. 9 is the lateral view of a kind of I type screw thread suspension hook for furred ceiling and roof pipeline installation in embodiment 3.
Detailed description of the invention
For the utility model is become apparent, hereby with preferred embodiment, and coordinate accompanying drawing to be described in detail below.
Embodiment 1
As shown in Figure 1 to Figure 3, the present embodiment provides a kind of L-type screw thread suspension hook of installing for furred ceiling and roof pipeline, comprises L-type plate body 1-a, and L-type plate body 1 comprises joint portion, roof 1-1 and is the body of rod joint portion 1-2 of angle α with this joint portion, roof 1-1, in the present embodiment, angle α=90 °.On the 1-1 of joint portion, roof, have the nailing hole 2 for injecting nailing, joint portion, roof 1-1 fits tightly by nailing and the roof injected in nailing hole 2.On the 1-2 of body of rod joint portion, protuberance has two the first arc protrusions 3 and a second arc protrusion 4, the protuberance opposite direction of the first arc protrusion 3 and the second arc protrusion 4, and the first arc protrusion 3 and the second arc protrusion 4 intervals are arranged, are jointly formed the space of the end of the metallic rod body that holds the end of furred ceiling screw mandrel or bend by all the first arc protrusions 3 and the second arc protrusion 4.On the inwall of the first arc protrusion 3 and the second arc protrusion 4, be formed with screw thread.
Embodiment 2
As shown in Figures 4 to 6, a kind of Z-type screw thread suspension hook for furred ceiling and roof pipeline installation that the present embodiment provides, comprise Z-shaped plate body 1-b, Z-shaped plate body 1-b comprises joint portion, roof 1-1 and body of rod joint portion 1-2, in the present embodiment, between joint portion, roof 1-1 and body of rod joint portion 1-2, by transition part 1-3 transition, transition part 1-3 is all perpendicular with joint portion, roof 1-1 and body of rod joint portion 1-2.On the 1-1 of joint portion, roof, have the nailing hole 2 for injecting nailing, joint portion, roof 1-1 fits tightly by injecting nailing in nailing hole 2 and the flange position, right angle on roof.On the 1-2 of body of rod joint portion, protuberance has two the first arc protrusions 3 and a second arc protrusion 4, the protuberance opposite direction of the first arc protrusion 3 and the second arc protrusion 4, and the first arc protrusion 3 and the second arc protrusion 4 intervals are arranged, are jointly formed the space of the end of the metallic rod body that holds the end of furred ceiling screw mandrel or bend by all the first arc protrusions 3 and the second arc protrusion 4.On the inwall of the first arc protrusion 3 and the second arc protrusion 4, be formed with screw thread.
Embodiment 3
As shown in Figure 7 to 9, a kind of I type screw thread suspension hook for furred ceiling and roof pipeline installation that the present embodiment provides, comprise I template body 1-c, on one end of I template body 1-c, have the nailing hole 2 (this part is equivalent to joint portion, roof 1-1) for injecting nailing, I template body 1 by inject the vertical ledge on nailing in nailing hole 2 and roof or vertically body of wall top fit tightly.On the other end of I template body 1, protuberance has two the first arc protrusions 3 and a second arc protrusion 4 (this part is equivalent to body of rod joint portion 1-2), the protuberance opposite direction of the first arc protrusion 3 and the second arc protrusion 4, and the first arc protrusion 3 and the second arc protrusion 4 intervals are arranged, are jointly formed the space of the end of the metallic rod body that holds the end of furred ceiling screw mandrel or bend by all the first arc protrusions 3 and the second arc protrusion 4.On the inwall of the first arc protrusion 3 and the second arc protrusion 4, be formed with screw thread.
In the time using the utility model to carry out installation of ceiling, first by according to the suspension hook of the different structure in the different choice embodiment 1 to 3 of installation site, if desired furred ceiling screw mandrel is arranged on roof plan, select the screw thread suspension hook of embodiment 1, if desired furred ceiling screw mandrel is arranged on the flange position, right angle on roof, select the screw thread suspension hook of embodiment 2, if desired furred ceiling screw mandrel is arranged on the vertical ledge or vertical body of wall top on roof, select the screw thread suspension hook of embodiment 3.Choose after the screw thread suspension hook of appropriate structure, the end of furred ceiling screw mandrel is inserted in the space jointly being formed by the first arc protrusion 3 and the second arc protrusion 4, re-use the ail shooter with extension bar, operating personnel station utilize on the ground penetrate screw thread suspension hook that the nailing in nailing hole 2 provides the utility model and on furred ceiling screw mandrel be fixed on relevant position.
In the time using the utility model to carry out the installation of roof pipeline, scene utilizes simple instrument, according to the formation of pipeline, Metallic rod is bent to moulding, and the Metallic rod two ends that bend are inserted respectively in the space jointly being formed by the first arc protrusion 3 and the second arc protrusion 4 on the screw thread suspension hook that a utility model provides (now, also will be according to the difference of installation site, select the screw thread suspension hook of different structure in embodiment 1 to 3, described in specifically seeing above, repeat no more) herein, hold after pipeline by Metallic rod, operating personnel just can utilize the ail shooter with extension bar, stand on the ground and to utilize the relevant position that penetrates screw thread suspension hook that the nailing in nailing hole 2 provides the utility model and pipeline and be fixed on roof.
For the intensity of screw thread suspension hook that strong the utility model is provided, on the 1-1 of joint portion, roof, be formed with two reinforcing ribs 5, all reinforcing ribs 5 all extend to body of rod joint portion 1-2.
Claims (9)
1. the screw thread suspension hook for furred ceiling and roof pipeline installation, its spy is: comprise plate body, this plate body at least comprises joint portion, roof (1-1) and body of rod joint portion (1-2), joint portion, roof (1-1) by the appropriate section on the nailing injected and roof or vertically body of wall top fit tightly, on body of rod joint portion (1-2), be formed with body of rod fixed structure, the end of the end of furred ceiling screw mandrel or the metallic rod body bending is fixedly connected with plate body by this body of rod fixed structure.
2. a kind of screw thread suspension hook for furred ceiling and roof pipeline installation as claimed in claim 1, its spy is: described plate body is L-type plate body (1-a), the joint portion, roof (1-1) of this L-type plate body (1-a) is angle α with its body of rod joint portion (1-2), its joint portion, roof (1-1) fits tightly by nailing and the roof injected in described nailing hole (2), and the end of the end of furred ceiling screw mandrel or the metallic rod body bending is fixedly connected with L-type plate body (1) by described body of rod fixed structure.
3. a kind of screw thread suspension hook for furred ceiling and roof pipeline installation as claimed in claim 2, its spy is: 180 ° of angle α < described in 0 ° of <.
4. a kind of screw thread suspension hook for furred ceiling and roof pipeline installation as claimed in claim 1, its spy is: described plate body is Z-shaped plate body (1-b), between the joint portion, roof (1-1) of this Z-shaped plate body (1-b) and body of rod joint portion (1-2), pass through transition part (1-3) transition, transition part (1-3) is all perpendicular with joint portion, roof (1-1) and body of rod joint portion (1-2), its joint portion, roof (1-1) fits tightly by injecting the interior nailing in described nailing hole (2) and the flange position, right angle on roof, the end of the end of furred ceiling screw mandrel or the metallic rod body bending is fixedly connected with Z-shaped plate body (1-b) by described body of rod fixed structure.
5. a kind of screw thread suspension hook for furred ceiling and roof pipeline installation as claimed in claim 1, its spy is: described plate body is I template body (1-c), its joint portion, roof (1-1) fits tightly by vertical ledge or the vertical body of wall top of injecting the interior nailing in described nailing hole (2) and roof, and the end of the end of furred ceiling screw mandrel or the metallic rod body bending is fixedly connected with I template body (1) by this body of rod fixed structure.
6. as claim 1, 2, 4, a kind of screw thread suspension hook for furred ceiling and roof pipeline installation in 5 described in any one, its spy is: described body of rod fixed structure comprises at least one the first arc protrusion (3) and at least one the second arc protrusion (4) that on body of rod joint portion (1-2), swell in the opposite direction, jointly formed the space of the end of the metallic rod body that holds the end of described furred ceiling screw mandrel or bend by all the first arc protrusions (3) and the second arc protrusion (4), the end of the end of furred ceiling screw mandrel or the metallic rod body bending is stretched in this space and is fixed.
7. a kind of screw thread suspension hook for furred ceiling and roof pipeline installation as claimed in claim 6, its spy is: on the inwall of the first arc protrusion (3) and/or the second arc protrusion (4), be formed with screw thread.
8. a kind of screw thread suspension hook for furred ceiling and roof pipeline installation as claimed in claim 1, its spy is: on joint portion, described roof (1-1), be formed with at least two reinforcing ribs (5), all reinforcing ribs (5) all extend to described body of rod joint portion (1-2).
9. a kind of screw thread suspension hook for furred ceiling and roof pipeline installation as claimed in claim 1, its spy is: on joint portion, described roof (1-1), have the nailing hole (2) for injecting nailing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320874725.4U CN203701396U (en) | 2013-12-27 | 2013-12-27 | Threaded hook used for mounting ceiling or roof pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320874725.4U CN203701396U (en) | 2013-12-27 | 2013-12-27 | Threaded hook used for mounting ceiling or roof pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203701396U true CN203701396U (en) | 2014-07-09 |
Family
ID=51051852
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320874725.4U Withdrawn - After Issue CN203701396U (en) | 2013-12-27 | 2013-12-27 | Threaded hook used for mounting ceiling or roof pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203701396U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669672A (en) * | 2013-12-27 | 2014-03-26 | 邦林机械制造(上海)有限公司 | Thread lifting hook for suspended ceiling and roof pipe installation |
CN111075991A (en) * | 2019-11-25 | 2020-04-28 | 宁夏昌禾装饰工程有限公司 | Novel water pipeline laying method |
-
2013
- 2013-12-27 CN CN201320874725.4U patent/CN203701396U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669672A (en) * | 2013-12-27 | 2014-03-26 | 邦林机械制造(上海)有限公司 | Thread lifting hook for suspended ceiling and roof pipe installation |
CN103669672B (en) * | 2013-12-27 | 2016-03-02 | 邦林机械制造(上海)有限公司 | A kind of screw shackle lock installed for furred ceiling and roof pipeline |
CN111075991A (en) * | 2019-11-25 | 2020-04-28 | 宁夏昌禾装饰工程有限公司 | Novel water pipeline laying method |
CN111075991B (en) * | 2019-11-25 | 2021-10-01 | 宁夏昌禾装饰工程有限公司 | Water pipeline laying method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205116728U (en) | Stupefied system of aluminum alloy building templates back of body | |
CN203701396U (en) | Threaded hook used for mounting ceiling or roof pipeline | |
CN104895400A (en) | Fixing device for fixing a rigid fence on a post | |
CN207582782U (en) | A kind of keel installation structure | |
CN205190360U (en) | Eye -splice structure | |
CN104609287B (en) | A kind of fixed form of escalator balustrade exterior panelling | |
CN103669672B (en) | A kind of screw shackle lock installed for furred ceiling and roof pipeline | |
CN205543820U (en) | Novel mounting bracket | |
CN204686795U (en) | A kind of jump ring installation station for being arranged in valve courage | |
CN204059918U (en) | scaffold and wall connecting piece | |
CN203605170U (en) | Lamp installing suspension cable hooking clamp | |
CN106182068A (en) | A kind of industry cantilever connects assembly | |
CN104110135B (en) | A kind of high-altitude working safety guardrail suspension member and manufacture method thereof | |
CN104453209B (en) | Putlock pressure lever type fixing device and method | |
CN203594220U (en) | Scaffold butt-joint fastener | |
CN203144973U (en) | Template capable of being disassembled and assembled repeatedly for small tube hole | |
CN205136833U (en) | Cable fixing clip of quick installation | |
CN205063191U (en) | Draw reinforcing bar fixing base to one side | |
CN204609235U (en) | With the floated athletic floor of locating pin | |
CN208352865U (en) | One kind can expand cable suspension device | |
CN204098302U (en) | A kind of metal plates curtain wall | |
CN109930822A (en) | A kind of house side template ruggedized construction | |
CN211287477U (en) | But reuse's a string ladder that is used for steel construction installation | |
CN206379681U (en) | A kind of portable cable suspension assembly | |
CN205591444U (en) | Rainwater drainage pipe suspend mounting structure in midair |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20140709 Effective date of abandoning: 20160302 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |