CN203687353U - Hot air and steam integration boiler - Google Patents
Hot air and steam integration boiler Download PDFInfo
- Publication number
- CN203687353U CN203687353U CN201420046403.5U CN201420046403U CN203687353U CN 203687353 U CN203687353 U CN 203687353U CN 201420046403 U CN201420046403 U CN 201420046403U CN 203687353 U CN203687353 U CN 203687353U
- Authority
- CN
- China
- Prior art keywords
- boiler
- steam
- hot air
- burner hearth
- smoke
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Drying Of Solid Materials (AREA)
Abstract
The utility model relates to the field of boilers, in particular to a hot air and steam integration boiler. The hot air and steam integration boiler is characterized in that a coal feeding hopper and a high and short front arch are arranged at the front end of a furnace, a high and long herringbone rear arch is arranged behind the furnace, the longitudinal section of the herringbone rear arch is in a herringbone shape, a smoke outlet window is arranged behind the herringbone rear arch, and the furnace is divided into a combustion chamber and a cooling chamber in the vertical direction; a left air inlet duct and a right air inlet duct are located on two sides of an airtight isobaric air chamber; the upper sides of water pipes are connected with an upper boiler cylinder, the lower sides of the water pipes are connected with a lower boiler cylinder, the water pipes are located in a smoke flue, the front three rows of the water pipes are provided with separation baffles; an upper flashboard and a smoke outlet are arranged behind a smoke channel, a lower flashboard is arranged below the smoke channel, and an exhaust smoke outlet is arranged outside the boiler. By the adoption of the technical scheme, steam or hot air is converted through the hot air and steam integration boiler, so that the hot air and steam integration boiler operates continuously and stably, heat efficiency of the hot air and steam integration boiler is improved comprehensively, the shut-down frequency of the hot air and steam integration boiler can be reduced effectively, electricity and labor are saved, and the service life of the hot air and steam integration boiler is prolonged.
Description
Technical field
The utility model relates to field of boilers, is a kind of hot blast, steam one boiler.
Background technology
For a long time, steam boiler, hot-blast stove are the maximum users of China's primary energy, almost annual 1/3rd of the national raw coal output that consumes.And steam boiler, hot-blast stove use widely in industries such as food, medicinal material, weaving, papermaking, chemical industry, metallurgy, building materials.These industries, in the time of needs steam, start steam boiler; In the time of needs hot blast, start hot-blast stove, these two kinds of type of furnaces are changed mutually, and fortune fortune is stopped, and causes the cyclically-varying of imbalance and the combustion process of supply and demand.This just causes the operating thermal efficiency of steam boiler, hot-blast stove not high, and particularly heat loss of imperfect solid combustion increases, and energy loss waste is quite serious.China's " 12 " development plan continues to classify energy-saving and emission-reduction as restrictive performance assessment criteria, solve as early as possible steam boiler, the high heat loss of hot-blast stove, improve steam boiler, hot-blast stove efficiency of fire coal, save valuable coal-fired resource, realizing the energy-saving and cost-reducing of steam hot wind all-in-one oven, is the vital task that China's steam boiler and hot-blast stove industry are imminent.
Summary of the invention
The purpose of this utility model is that a kind of hot blast, steam one boiler will be provided.Hot blast, steam all-in-one oven are provided with two completely independently hot exhaust gases passes, and hot blast, steam are arbitrarily adjusted according to demand by two air-introduced machines, jointly enter wind mixed chamber, send into dryer by air-heater.
The utility model is achieved in that a kind of hot blast, steam one boiler, is made up of upper coal bunker 1, burner hearth 3, smoke outlet window 5, combustion chamber 7 and flue 18; It is characterized in that burner hearth 3 front ends have upper coal bunker 1 with height and short face arch 2, after burner hearth 3, there is the chevron shaped rear arch 4 compared with Gao Erchang, chevron shaped rear arch 4 longitudinal sections be shaped as " people " character form structure, after chevron shaped rear arch 4, have smoke outlet window 5, burner hearth 3 is vertically separated into combustion chamber 7 and cooling chamber; Left side air inlet duct 23 and right side air inlet duct 32, be positioned at airtight isobaric air compartment 9 both sides, and airtight isobaric air compartment 9 is made up of dnockout core fire grate 6, wind isolation board 8, base plate 10; On water pipe 16, connect drum 20, under connect lower drum 22, water pipe 16 is positioned at flue 18, in water pipe 16 first three array of pipes, be equipped with separate plate washer 15; After exhaust gases passes 11, have upper flashboard 12 and exhanst gas outlet 13, exhaust gases passes has lower flashboard 14 11 times, and smoke evacuation outlet 19 is contained in the outside of stove; In boiler tube bundle region along arranging a soot blower 17 on boiler center line; Magnetic turnover panel 21 is contained in a side of upper drum 20.
On dnockout core fire grate 6, have fire grate segment shell 26, fire grate segment shell 26 has long and narrow socket 27 and groove straightthrough port 28.
In burner hearth 3, water pipe 16th district and have insulation material 25 between furnace wall 24.
Owing to having adopted technique scheme, by hot blast, steam one boiler conversion steam or hot blast, make full use of a large amount of hot flue gas that discharges in the process of producing steam and carry out the fertilizer that baking needed will be dried, dry the water vapour that the moisture content in fertilizer produces, contained sulphur nitre dust etc. in can the hot flue gas of washing discharge, fertilizer absorbs the materials such as sulphur nitre dust in washing simultaneously increases the element that fertilizer needs crops.Minus has lacked the furnace roof of this stove in the time producing hot blast and the heat loss of furnace wall, has more effectively utilized the energy, has reduced the waste of resource.
Accompanying drawing explanation
Fig. 1 is main TV structure schematic diagram of the present utility model.
Fig. 2 is plan structure schematic diagram of the present utility model.
Fig. 3 is left TV structure schematic diagram of the present utility model.
Fig. 4 is fire grate segment shell structure schematic diagram of the present utility model.
In the drawings: 1, upper coal bunker; 2, face arch; 3, burner hearth; 4, chevron shaped rear arch; 5, smoke outlet window; 6, dnockout core fire grate; 7, combustion chamber; 8, wind isolation board; 9, airtight isobaric air compartment; 10, base plate; 11, exhaust gases passes; 12, upper flashboard; 13, exhanst gas outlet; 14, lower flashboard; 15, skimming baffle; 16, water pipe; 17, soot blower; 18, flue; 19, smoke evacuation outlet; 20, upper drum; 21, magnetic turnover panel; 22, lower drum; 23, left side air inlet duct; 24, furnace wall; 25, insulation material; 26, fire grate segment shell; 27, long and narrow socket; 28, groove straightthrough port.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is further described.
In Fig. 1, Fig. 2, Fig. 3 and Fig. 4, burner hearth 3 front ends have upper coal bunker 1 with height and short face arch 2, after burner hearth 3, there is the chevron shaped rear arch 4 compared with Gao Erchang, chevron shaped rear arch 4 longitudinal sections be shaped as " people " character form structure, after chevron shaped rear arch 4, have smoke outlet window 5, burner hearth 3 is vertically separated into combustion chamber 7 and cooling chamber; Left side air inlet duct 23 and right side air inlet duct 32, be positioned at airtight isobaric air compartment 9 both sides, and airtight isobaric air compartment 9 is made up of dnockout core fire grate 6, wind isolation board 8, base plate 10; On water pipe 16, connect drum 20, under connect lower drum 22, water pipe 16 is positioned at flue 18, in water pipe 16 first three array of pipes, be equipped with separate plate washer 15; After exhaust gases passes 11, have upper flashboard 12 and exhanst gas outlet 13, exhaust gases passes has lower flashboard 14 11 times, and smoke evacuation outlet 19 is contained in the outside of stove; In boiler tube bundle region along arranging a soot blower 17 on boiler center line; Magnetic turnover panel 21 is contained in a side of upper drum 20.On dnockout core fire grate 6, have fire grate segment shell 26, fire grate segment shell 26 has long and narrow socket 27 and groove straightthrough port 28.In burner hearth 3, water pipe 16th district and have insulation material 25 between furnace wall 24.
Fuel is sent into coal bunker 1 from coal yard through conveying device, and coal is fallen on dnockout core fire grate 6, enter burner hearth 3 and burn, combustion product from burner hearth 3 through smoke outlet window 5, enter combustion chamber 7 and burn after, enter exhaust gases passes 11.Burn needed air through left side air inlet duct 23 and right side air inlet duct 32, airtight isobaric air compartment 9, long and narrow gap by fire grate segment shell 26 from bottom to top blow into burner hearth, on fire grate, form Boiling Combustion, coal-fired high-temperature region is advanced to burner hearth 3 centers, effectively improve the efficiency of combustion of fuel, and avoid the initial failure of fire grate, extended the service life of fire grate.In the time needing steam and hot blast, open upper flashboard 12 and lower flashboard 14 simultaneously.In the time of needs steam, open lower flashboard 14, close upper flashboard 12, high-temperature flue gas washes away water pipe 16 through skimming baffle 15 and produces steam, and remaining flue gas is discharged through smoke evacuation outlet 19.In the time of needs hot blast, open upper flashboard 12, close lower flashboard 14, the high-temperature flue gas that burning produces enters high temperature gas cleaning chamber through exhanst gas outlet 13.High temperature gas cleaning chamber is formed by refractory material laying, and high-temperature flue gas carries out second-time burning in clean room, the high temperature polymerization sedimentation in clean room of a small amount of dust of carrying secretly in combustion process.In clean room, clean hot blast (~1000 ℃) out mixes a certain amount of cold wind, is mixed into the temperature required hot blast of dry materials and enters drying equipment material is dried.
Claims (3)
1. hot blast, a steam one boiler, is made up of upper coal bunker (1), burner hearth (3), smoke outlet window (5), combustion chamber (7) and flue (18); It is characterized in that burner hearth (3) front end has upper coal bunker (1) and high and short face arch (2), after burner hearth (3), there is the chevron shaped rear arch (4) compared with Gao Erchang, chevron shaped rear arch (4) longitudinal section be shaped as " people " character form structure, after chevron shaped rear arch (4), have smoke outlet window (5), burner hearth (3) is vertically separated into combustion chamber (7) and cooling chamber; Left side air inlet duct (23) and right side air inlet duct (32), be positioned at airtight isobaric air compartment (9) both sides, airtight isobaric air compartment (9) is made up of dnockout core fire grate (6), wind isolation board (8), base plate (10); On water pipe (16), connect drum (20), under connect lower drum (22), water pipe (16) is positioned at flue (18), is equipped with and separates plate washer (15) in first three array of pipes of water pipe (16); After exhaust gases passes (11), have upper flashboard (12) and exhanst gas outlet (13), have lower flashboard (14) under exhaust gases passes (11), smoke evacuation outlet (19) is contained in the outside of stove; In boiler tube bundle region along arranging a soot blower (17) on boiler center line; Magnetic turnover panel (21) is contained in a side of upper drum (20).
2. a kind of hot blast according to claim 1, steam one boiler, it is characterized in that having fire grate segment shell (26), fire grate segment shell (26) to have long and narrow socket (27) and groove straightthrough port (28) on dnockout core fire grate (6).
3. a kind of hot blast according to claim 1, steam one boiler, is characterized in that in burner hearth (3), water pipe (16) district and has insulation material (25) between furnace wall (24).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420046403.5U CN203687353U (en) | 2014-01-25 | 2014-01-25 | Hot air and steam integration boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420046403.5U CN203687353U (en) | 2014-01-25 | 2014-01-25 | Hot air and steam integration boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203687353U true CN203687353U (en) | 2014-07-02 |
Family
ID=51009242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420046403.5U Expired - Fee Related CN203687353U (en) | 2014-01-25 | 2014-01-25 | Hot air and steam integration boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203687353U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103791609A (en) * | 2014-01-25 | 2014-05-14 | 随州金峰节能设备制造有限公司 | Hot air and steam integrated boiler |
-
2014
- 2014-01-25 CN CN201420046403.5U patent/CN203687353U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103791609A (en) * | 2014-01-25 | 2014-05-14 | 随州金峰节能设备制造有限公司 | Hot air and steam integrated boiler |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207963507U (en) | A kind of coal base shaft furnace flue gas waste heat recovery system | |
CN204880187U (en) | Biomass fuel is dry device of stoving in advance | |
CN204006647U (en) | Semi-coal gas downward-burning type tubulation multistage heat exchange smoke-dust-free hot-air furnace | |
CN101706197A (en) | Oxygen-free surface water drying system and surface water drying technology for material | |
CN105485901B (en) | A kind of grain-drying hot-air furnace | |
CN101929732A (en) | Environment-friendly and energy-saving constant pressure hot water boiler | |
CN103063044B (en) | Rotary hearth furnace smoke waste heat utilization system and rotary hearth furnace fume afterheat Application way | |
CN203687353U (en) | Hot air and steam integration boiler | |
CN209165440U (en) | A kind of rice husk burning device | |
CN102635939A (en) | Vertical coal hot air furnace with double-layer heat conduction | |
CN201628457U (en) | Coal oxygen-free drying device and drying system | |
CN104964440A (en) | Energy-saving boiler | |
CN205448287U (en) | Many fuel heat pipe indirect heating hot -blast furnace | |
CN101650073A (en) | Baffled hot-blast stove | |
CN103791609A (en) | Hot air and steam integrated boiler | |
CN102607286A (en) | Molten salt furnace afterheat power-generation and combustion comprehensive utilizing system | |
CN202392992U (en) | Full-automatic horizontal-type hot air and hot water multipurpose boiler | |
CN208998096U (en) | Hot-blast stove | |
CN103121786B (en) | Integrated condensation dehydration and waste heat utilization sludge treatment device and technological process | |
CN208269409U (en) | A kind of biologic matter particle fuel hot-air furnace | |
CN203758209U (en) | Sealing type hot-blast stove | |
CN203550478U (en) | Roasting furnace | |
CN106196133A (en) | A kind of negative pressure coal dust preparation system | |
CN201449007U (en) | A turn-back flow coal burning hot air furnace | |
CN201425298Y (en) | Efficient, energy-saving and multifunctional circulating heating furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140702 Termination date: 20180125 |
|
CF01 | Termination of patent right due to non-payment of annual fee |