CN203684623U - Bracket for exterior wall tile sticking - Google Patents
Bracket for exterior wall tile sticking Download PDFInfo
- Publication number
- CN203684623U CN203684623U CN201320770437.4U CN201320770437U CN203684623U CN 203684623 U CN203684623 U CN 203684623U CN 201320770437 U CN201320770437 U CN 201320770437U CN 203684623 U CN203684623 U CN 203684623U
- Authority
- CN
- China
- Prior art keywords
- exterior wall
- supporting plate
- gripper shoe
- bracket
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a bracket for exterior wall tile sticking. The bracket for exterior wall tile sticking comprises a support plate, wherein the support plate is a horizontally arranged rectangular plate and a supporting plate is vertically arranged below the support plate; the upper end of the supporting plate is fixedly connected with the lower surface of the support plate, one side surface of the supporting plate and one side of the support plate are on the same level, and a plurality of positioning holes are formed in the supporting plate. The bracket for exterior wall tile sticking has the advantages that the exterior wall tiles at the bottom can be supported, the exterior wall tiles can be stuck at the same time when treatment and construction of infrastructure such as ground facilities are performed, the construction time is effectively shortened and the construction efficiency is improved.
Description
Technical field
The utility model relates to a kind of bracket, relates in particular to a kind of exterior wall patch block bracket.
Background technology
In order to make the more attractive in appearance or better heat preservation of building, people can be at outside the building wall tile fixing or insulating brick (warming plate) conventionally.Traditional patch block is all pasted from starting at the bottom of wall, but so need to be at ground installations such as capital construction, carry out after finishing dealing with, otherwise cannot construct because bottom wall brick lacks support.But due to the engineering time relatively growth (1,2 month) conventionally of capital construction or other ground installations, will cause like this installation work of exterior wall tile to be delayed, thereby cause the delay of whole construction period, cause serious time waste, make productivity slowdown, cause damage to construction party.
Utility model content
For prior art above shortcomings, the purpose of this utility model is just to provide a kind of exterior wall patch block bracket, bottom exterior wall tile can be held up, thereby can in the ground installations such as capital construction, processing construction, carry out exterior wall patch block, thereby effectively reduce the engineering time, improve efficiency of construction.
To achieve these goals, the technical solution adopted in the utility model is such: a kind of exterior wall patch block bracket, is characterized in that: comprise supporting plate, described supporting plate is horizontally disposed rectangular slab, is vertically provided with a gripper shoe below supporting plate; The upper end of described gripper shoe is fixedly connected with the soffit of supporting plate, and one side is concordant with a side of supporting plate, is provided with several locating holes in gripper shoe.
Further, described locating hole is 3, and distribution triangular in shape.
Further, described supporting plate and gripper shoe are metal material, wooden or plastic material.
Compared with prior art, the utility model has the advantage of: simple in structure, easy to use; After utilizing screw to pass the locating hole in gripper shoe, gripper shoe is fixed on to body of wall (wall face) bottom, and gripper shoe and metope are close to; Like this, can support bottom exterior wall tile by supporting plate, thereby realize, exterior wall tile be started to construction from supporting plate top, thereby can in the ground installations such as capital construction, processing construction, carry out exterior wall patch block, thereby effectively reduce the engineering time, improve efficiency of construction.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model;
Fig. 2 is lateral view of the present utility model.
In figure: 1-supporting plate, 2-gripper shoe, 3-locating hole.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment: referring to Fig. 1, Fig. 2, a kind of exterior wall patch block bracket, comprises supporting plate 1, and described supporting plate 1 is horizontally disposed rectangular slab, is vertically provided with a gripper shoe 2 below supporting plate 1.The upper end of described gripper shoe 2 is fixedly connected with the soffit of supporting plate 1, and one side is concordant with a side of supporting plate 1, like this gripper shoe 2 and metope are close to fixing after, supporting plate 1 also can be close to metope.In gripper shoe 2, be provided with several locating holes 3, facilitate the use cement nail and metope is fixed.
Described locating hole 3 is 3, and distribution triangular in shape; Easy to process, quick, by the locating hole 3 of distribution triangular in shape, bracket is fixed on metope, fixing convenient, quick, and locating effect is better.Described supporting plate 1 and gripper shoe 2 are metal material, wooden or plastic material; Make with low cost, easy to process.
After utilizing screw to pass the locating hole 3 in gripper shoe 2, gripper shoe 2 is fixed on to body of wall (wall face) bottom, and gripper shoe 2 and metope are close to; Like this, can support bottom exterior wall tile by supporting plate 1, exterior wall tile be started to construction from supporting plate 1 top thereby realize, thereby can in the ground installations such as capital construction, processing construction, carry out exterior wall patch block, thereby effectively reduce the engineering time, improve efficiency of construction.
Finally it should be noted that, above embodiment is only in order to the technical solution of the utility model to be described but not restriction technologies scheme, those of ordinary skill in the art is to be understood that, those are modified to the technical solution of the utility model or are equal to replacement, and do not depart from aim and the scope of the technical program, all should be encompassed in the middle of claim scope of the present utility model.
Claims (3)
1. an exterior wall patch block bracket, is characterized in that: comprise supporting plate, described supporting plate is horizontally disposed rectangular slab, is vertically provided with a gripper shoe below supporting plate; The upper end of described gripper shoe is fixedly connected with the soffit of supporting plate, and one side is concordant with a side of supporting plate, is provided with several locating holes in gripper shoe.
2. exterior wall patch block bracket according to claim 1, is characterized in that: described locating hole is 3, and distribution triangular in shape.
3. exterior wall patch block bracket according to claim 1, is characterized in that: described supporting plate and gripper shoe are metal material, wooden or plastic material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320770437.4U CN203684623U (en) | 2013-11-30 | 2013-11-30 | Bracket for exterior wall tile sticking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320770437.4U CN203684623U (en) | 2013-11-30 | 2013-11-30 | Bracket for exterior wall tile sticking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203684623U true CN203684623U (en) | 2014-07-02 |
Family
ID=51006545
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320770437.4U Expired - Fee Related CN203684623U (en) | 2013-11-30 | 2013-11-30 | Bracket for exterior wall tile sticking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203684623U (en) |
-
2013
- 2013-11-30 CN CN201320770437.4U patent/CN203684623U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203684623U (en) | Bracket for exterior wall tile sticking | |
CN203684622U (en) | Support for exterior wall tile sticking | |
CN203742140U (en) | Support device for external wall tiling | |
CN202658577U (en) | Protector for horizontal rubber water-stop protector | |
CN203238853U (en) | Concrete cushion block for protection layer of building heat preservation system | |
CN204850428U (en) | Imitative brick outer wall template | |
CN204326346U (en) | A kind of building construction uses lays bricks | |
CN202248423U (en) | Hanging curtain wall | |
CN203514553U (en) | Reinforced heat insulation board | |
CN202689612U (en) | Hollow brick curing chamber | |
CN204367137U (en) | Produce the mould of grape bracing frame | |
CN203846686U (en) | Building construction reinforced concrete protective layer cushion block | |
CN203636957U (en) | Foam concrete block mold | |
CN204163272U (en) | With the solid light wallboard of crossed beam trunking | |
CN202829851U (en) | Novel brick holding circle structure | |
CN202248418U (en) | Surface-mounted device of unit curtain wall | |
CN205012569U (en) | Take roofing heat preservation prefabricated plate of installation foot | |
CN202137834U (en) | Forming mould for cement precast slab | |
CN205739470U (en) | A kind of stone material conveyer device conveniently carrying out stone material cutting processing | |
CN206205346U (en) | Composite metal plate cladding panel structure | |
CN204587652U (en) | A kind of ceramic tile immersion laying rack | |
CN206737256U (en) | A kind of energy-conserving and environment-protective wall board body being easily installed | |
CN202627581U (en) | Hollow-brick curing room utilizing solar energy | |
CN203097209U (en) | Marble slab of improved structure | |
CN202689398U (en) | External-hanging stone external angle structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140702 Termination date: 20141130 |
|
EXPY | Termination of patent right or utility model |