CN203684296U - Steel support simulation device in deep foundation pit construction mechanical model experiment - Google Patents

Steel support simulation device in deep foundation pit construction mechanical model experiment Download PDF

Info

Publication number
CN203684296U
CN203684296U CN201420034043.7U CN201420034043U CN203684296U CN 203684296 U CN203684296 U CN 203684296U CN 201420034043 U CN201420034043 U CN 201420034043U CN 203684296 U CN203684296 U CN 203684296U
Authority
CN
China
Prior art keywords
spring
deep foundation
sleeve
foundation pit
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420034043.7U
Other languages
Chinese (zh)
Inventor
武科
赵闯
贾超
廉明远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201420034043.7U priority Critical patent/CN203684296U/en
Application granted granted Critical
Publication of CN203684296U publication Critical patent/CN203684296U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The utility model discloses a steel support simulation device in a deep foundation pit construction mechanical model experiment. The steel support simulation device comprises adhering pieces, stress transmission tubes, a sleeve and a spring. The number of the stress transmission tubes is two. The two stress transmission tubes are fixed to the two ends of the spring through the adhering pieces and the other end of each stress transmission tube is provided with one adhering piece. The spring is fixed to the inner portion of the sleeve. A millimeter calibrated scale is arranged in the sleeve and corresponds to the spring in position. The steel supporting simulation device can simulate the steel support supporting and protecting function in the deep foundation pit digging process and measure the stress received by a steel support in the experiment process and an experiment device is simple in structure, low in cost, easy to machine and produce, convenient to operate and accurate in measurement.

Description

Steel in a kind of deep foundation pit construction Mechanical Model Test supports analogue means
Technical field
The utility model relates to Geotechnical Engineering field, and the steel in especially a kind of deep foundation pit construction Mechanical Model Test supports analogue means.
Background technology
At present, steel in Deep foundation Pit excavation Mechanical Model Test supports analogue means, mainly the brief test equipment forming with the materials processing such as iron wire, plastic pipe, can only realize at horizontal loading loading procedure, these Simple steels support that analog machines easily produce flexural deformation or without any strain; Meanwhile, consider that in deep foundation pit construction Mechanical Model Test, steel supports the long term of reusing born load, cause steel to support difficult recovery of distortion that analog machine produces, support suffered stress state thereby cannot truly, effectively simulate steel, result of the test is not very desirable.
Utility model content
The utility model is in order to address the above problem, the steel having proposed in a kind of deep foundation pit construction Mechanical Model Test supports analogue means, this can simulate steel shotcrete support structure stress process in Deep Excavation effectively, have simple in structure, the advantage that test effect is desirable.
To achieve these goals, the utility model adopts following technical scheme:
Steel in deep foundation pit construction Mechanical Model Test supports an analogue means, comprises bonding sheet, stress transfer pipe, sleeve and spring; Wherein, stress transfer pipe has two, and two stress transfer pipes are fixed on both ends of the spring by adhesive sheet, the other end of two stress transfer pipes is equipped with an adhesive sheet, spring is fixed in sleeve, and sleeve inner is provided with a millimeter rule, and spring is corresponding with the position of millimeter rule.
The middle-end of described sleeve is clear glass.
Described sleeve inner top is provided with several decks.
Operating principle of the present utility model is: in deep foundation ditch model testing digging process, steel supports stressed size by measuring camber of spring size, and multiplies each other and obtain with spring constant, and wherein camber of spring size is measured by millimeter rule.
In deep foundation ditch model testing digging process, the barricade or other object that steel are supported in bonding sheet and the model testing at analogue means two ends are fixed as one, along with the continuous excavation of deep foundation ditch, soil body off-load in model testing, cause wall-retaining structure or other structure to foundation ditch inner inclination, thereby make steel support analogue means and bear extruding---the horizontal pressure force of horizontal direction, pressure is delivered to by stress transfer pipe on the spring of sleeve inner, cause spring crimp, spring deflection can be read by the clear glass rule on sleeve.In spring extrusion process, produce elastic force, react on stress transfer pipe, make it produce horizontal thrust, act on barricade or other works, play the supporting role of simulation steel.
The beneficial effects of the utility model are:
This device not only can be simulated steel shotcrete support effect in Deep Excavation, and in can testing experiment process, steel supports suffered stress intensity, and testing equipment is simple in structure, and cost is lower, and easily processing is easy to operate, measures accurately.
Accompanying drawing explanation
Fig. 1 is structure elevation of the present utility model;
Fig. 2 is section of structure of the present utility model.
Wherein, 1, bonding sheet; 2, stress transfer pipe; 3, sleeve; 4, clear glass; 5, spring; 6, millimeter rule; 7, deck.
The specific embodiment:
Below in conjunction with accompanying drawing and embodiment, the utility model is described in further detail.
As shown in Figure 1 and Figure 2, the steel in a kind of deep foundation pit construction Mechanical Model Test supports analogue means, comprises bonding sheet 1, stress transfer pipe 2, sleeve 3 and spring 5; Wherein, stress transfer pipe 2 has two, and two stress transfer pipes 2 are fixed on spring 5 two ends by adhesive sheet 1, and the other end of stress transfer pipe 2 is equipped with an adhesive sheet 1, and spring 5 is fixed in sleeve 3, and sleeve 3 inside are provided with millimeter rule 6.
The middle-end of sleeve 3 is clear glass 4.
Sleeve 3 inner tip are provided with several decks 7.
In deep foundation ditch model testing digging process, steel supports stressed size by measuring spring 5 distortion sizes, and obtains with spring 5 multiplication, and its medi-spring 5 distortion sizes are measured by millimeter rule 6.
In deep foundation ditch model testing digging process, the bonding sheet 1 that steel is supported to analogue means two ends is fixed as one with barricade or other object in model testing, along with the continuous excavation of deep foundation ditch, soil body off-load in model testing, cause wall-retaining structure or other structure to foundation ditch inner inclination, thereby make steel support analogue means and bear extruding---the horizontal pressure force of horizontal direction, pressure is delivered to by stress transfer pipe 2 on the spring 5 of sleeve 3 inside, cause spring 5 crimps, spring 5 deflections can be read by the millimeter rule 6 of the clear glass 5 on sleeve 3.In spring 5 extrusion processes, produce elastic force, react on stress transfer pipe 2, make it produce horizontal thrust, act on barricade or other works, play the supporting role of simulation steel.
By reference to the accompanying drawings the specific embodiment of the present utility model is described although above-mentioned; but the not restriction to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various modifications that creative work can make or distortion still in protection domain of the present utility model.

Claims (3)

1. the steel in deep foundation pit construction Mechanical Model Test supports an analogue means, it is characterized in that: comprise bonding sheet, stress transfer pipe, sleeve and spring; Wherein, stress transfer pipe has two, and two stress transfer pipes are fixed on both ends of the spring by adhesive sheet, the other end of two stress transfer pipes is equipped with an adhesive sheet, spring is fixed in sleeve, and sleeve inner is provided with a millimeter rule, and spring is corresponding with the position of millimeter rule.
2. the steel in a kind of deep foundation pit construction Mechanical Model Test as claimed in claim 1 supports analogue means, it is characterized in that: the middle-end of described sleeve is clear glass.
3. the steel in a kind of deep foundation pit construction Mechanical Model Test as claimed in claim 1 supports analogue means, it is characterized in that: described sleeve inner top is provided with several decks.
CN201420034043.7U 2014-01-20 2014-01-20 Steel support simulation device in deep foundation pit construction mechanical model experiment Withdrawn - After Issue CN203684296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420034043.7U CN203684296U (en) 2014-01-20 2014-01-20 Steel support simulation device in deep foundation pit construction mechanical model experiment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420034043.7U CN203684296U (en) 2014-01-20 2014-01-20 Steel support simulation device in deep foundation pit construction mechanical model experiment

Publications (1)

Publication Number Publication Date
CN203684296U true CN203684296U (en) 2014-07-02

Family

ID=51006219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420034043.7U Withdrawn - After Issue CN203684296U (en) 2014-01-20 2014-01-20 Steel support simulation device in deep foundation pit construction mechanical model experiment

Country Status (1)

Country Link
CN (1) CN203684296U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711153A (en) * 2014-01-20 2014-04-09 山东大学 Steel brace simulation device in deep foundation pit construction mechanical model test

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711153A (en) * 2014-01-20 2014-04-09 山东大学 Steel brace simulation device in deep foundation pit construction mechanical model test

Similar Documents

Publication Publication Date Title
CN109459311B (en) Experimental device for tunnel pipe ring atress warp under simulation different atress conditions
CN103217345B (en) Device and method for measuring actual triaxial creep of geotechnical engineering test specimen
CN102539261B (en) Steel tube bending deformation testing system
CN204116128U (en) A kind of tension-torsion coupling stiffness proving installation
AU2015101608A4 (en) Rock acoustic wave detection transducer
CN103711153A (en) Steel brace simulation device in deep foundation pit construction mechanical model test
CN101281089B (en) Composite material prick pipe structure wind load simulation test method
CN102169039A (en) Calibrating device for screen (silk screen) tensiometer for printing
CN203684296U (en) Steel support simulation device in deep foundation pit construction mechanical model experiment
JP2014037738A (en) Load experimental device for test piece of shield tunnel
CN104181002B (en) A kind of uniform hydraulic analogue charger for tunnel structural model test and method
CN106124736A (en) Displacement laboratory test model-aided measurement apparatus in a kind of country rock ground
CN202770569U (en) Apparatus for monitoring riprap embankment back levee soil horizontal bearing deformation
CN203965144U (en) Rail fastening lateral stiffness measurement mechanism
CN206902781U (en) The detection means of anchor pole internal force exterior measuring
CN203561561U (en) Device for detecting axial side pressure of tank body
CN209894618U (en) Indoor model experimental equipment for simulating tunnel disturbed by surrounding rock
CN206627375U (en) Pipeline rigidity automatic testing equipment
CN206208190U (en) A kind of strain gauge means
CN204989075U (en) Measure testing arrangement that expanding material inflation was pressed
CN208606915U (en) A kind of measuring device of steel tube component twin shaft residual stress
CN203241180U (en) Back-arch type pressure gauge
CN204694322U (en) A kind of simple and easy deep phreatic water level measuring arrangement
CN201191255Y (en) Bending measuring apparatus for concrete tenacity experiment
CN209670985U (en) Mine presses the simulation bracket of similarity simulation experiment measurement roof pressure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140702

Effective date of abandoning: 20150812

RGAV Abandon patent right to avoid regrant