CN203673026U - Misplaced partial discharge model for stress cone of 10kV-cable intermediate joint - Google Patents
Misplaced partial discharge model for stress cone of 10kV-cable intermediate joint Download PDFInfo
- Publication number
- CN203673026U CN203673026U CN201320699926.5U CN201320699926U CN203673026U CN 203673026 U CN203673026 U CN 203673026U CN 201320699926 U CN201320699926 U CN 201320699926U CN 203673026 U CN203673026 U CN 203673026U
- Authority
- CN
- China
- Prior art keywords
- layer
- stress cone
- intermediate joint
- cable
- partial discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Cable Accessories (AREA)
Abstract
本实用新型的目的在于提供一种10kV电缆中间接头应力锥错位局部放电模型,将普通的XLPE电缆直接制作成,能在确保安全的情况下真实反映出电缆中间接头在制造安装运行过程中暴露出来的模型。为了解决上述技术问题,本实用新型10kV电缆中间接头应力锥错位局部放电模型,包括连接在一起的两根电缆,所述电缆逐层剥离屏蔽层、外导电层、主绝缘层、内导电层,露出铜芯;所述电缆被剥开部分外侧套设有应力锥,其中一根电缆的外半导电层断口伸出应力锥至少5mm形成错位。与现有技术相比,本实用新型在真实的电缆中间接头内部人为制成一个缺陷部位,能真实反映出电缆中间接头在制造安装运行过程中暴露出来的具有代表性缺陷的性质、特征和放电机理。
The purpose of this utility model is to provide a 10kV cable intermediate joint stress cone dislocation partial discharge model, which can directly make ordinary XLPE cables, and can truly reflect that the cable intermediate joint is exposed during the manufacturing, installation and operation process under the condition of ensuring safety. model. In order to solve the above-mentioned technical problems, the utility model 10kV cable intermediate joint stress cone dislocation partial discharge model includes two cables connected together, and the cables peel off the shielding layer, outer conductive layer, main insulating layer, and inner conductive layer layer by layer, The copper core is exposed; the outside of the stripped part of the cable is covered with a stress cone, and the fracture of the outer semiconducting layer of one cable protrudes from the stress cone by at least 5mm to form a dislocation. Compared with the existing technology, the utility model artificially makes a defective part inside the real cable intermediate joint, which can truly reflect the nature, characteristics and discharge of representative defects exposed during the manufacturing, installation and operation of the cable intermediate joint. mechanism.
Description
技术领域 technical field
本实用新型涉及电力系统领域,尤其涉及10kV电缆中间接头应力锥错位局部放电模型。 The utility model relates to the field of power systems, in particular to a stress cone dislocation partial discharge model of a 10kV cable intermediate joint. the
背景技术 Background technique
XLPE电缆以其优异的性能被广泛用于输电线路,然而电缆制作长度一般在1km以下,需要电缆中间接头连接,因此电缆中间接头是电力电缆的重要组成部分,但同时也是输电线路事故的多发部位,其可靠性直接影响供电系统的安全性。在现场安装过程中,由于操作不当可能会在电缆附件中引入多种缺陷,对附件造成严重的损伤。电缆的局部放电量与其绝缘状况密切相关,局部放电量的变化预示着电缆绝缘可能存在危害电缆安全运行的缺陷。 XLPE cables are widely used in transmission lines due to their excellent performance. However, the length of cables is generally less than 1km, and cable intermediate joints are required for connection. Therefore, cable intermediate joints are an important part of power cables, but they are also frequent sites of transmission line accidents. , its reliability directly affects the security of the power supply system. During on-site installation, various defects may be introduced into the cable accessories due to improper operation, causing serious damage to the accessories. The partial discharge of the cable is closely related to its insulation condition, and the change of the partial discharge indicates that there may be defects in the cable insulation that may endanger the safe operation of the cable. the
对此,现有为了针对这样的问题,最好的解决方式是设计一种物理模型来专门研究。同时也能便于工作人员练习问题处理方式。 In this regard, in order to address such problems, the best solution is to design a physical model for special research. At the same time, it is also convenient for the staff to practice problem-solving methods. the
目前,国内外对电缆中间接头绝缘缺陷放电特性进行了大量研究,但大部分典型缺陷放电特性研究不是在实际电缆接头上进行,与接头内真实放电特性有差异。而如果真的选取一段已有缺陷的电缆,则不能确保这个模型的安全性。因此如何在安全的前提下更为真实地模拟10kV电缆中间接头应力锥错位局部放电模型就成为了一个难题。 At present, a lot of research has been done on the discharge characteristics of insulation defects in cable intermediate joints at home and abroad, but most of the research on the discharge characteristics of typical defects is not carried out on the actual cable joints, which is different from the real discharge characteristics in the joints. And if you really choose a section of defective cable, you can't guarantee the safety of this model. Therefore, how to more realistically simulate the stress cone dislocation partial discharge model of the 10kV cable intermediate joint under the premise of safety has become a difficult problem. the
实用新型内容 Utility model content
本实用新型的目的在于提供一种10kV电缆中间接头应力锥错位局部放电 模型,将普通的XLPE电缆直接制作成,能在确保安全的情况下真实反映出电缆中间接头在制造安装运行过程中暴露出来的模型。 The purpose of this utility model is to provide a 10kV cable intermediate joint stress cone dislocation partial discharge model, which is directly made of ordinary XLPE cables, and can truly reflect that the cable intermediate joint is exposed during the manufacturing, installation and operation process under the condition of ensuring safety. model. the
为了解决上述技术问题,本实用新型是通过以下技术方案实现的: In order to solve the above technical problems, the utility model is achieved through the following technical solutions:
10kV电缆中间接头应力锥错位局部放电模型,包括连接在一起的两根电缆,所述电缆逐层剥离屏蔽层、外导电层、主绝缘层、内导电层,露出铜芯;两根电缆的铜芯通过压接管相连,所述铜芯和压接管外侧包有半导电套层,所述电缆被剥开部分外侧套设有应力锥,其中一根电缆的外半导电层断口伸出应力锥至少5mm形成错位。 10kV cable intermediate joint stress cone dislocation partial discharge model, including two cables connected together, the cables peel off the shielding layer, outer conductive layer, main insulating layer, and inner conductive layer layer by layer to expose the copper core; the copper of the two cables The cores are connected by a crimping tube, the outer side of the copper core and the crimping tube is covered with a semi-conductive sheath, and the outside of the stripped part of the cable is covered with a stress cone, and the fracture of the outer semi-conductive layer of one cable extends out of the stress cone for at least 5mm forms a misalignment. the
优选的,所述半导电套层为半导电胶带。这样的结构较为容易包扎。 Preferably, the semi-conductive sleeve layer is a semi-conductive tape. Such a structure is easier to wrap. the
优选的,所述半导电套层为半导电塑胶套。塑胶套为专用设备,使用起来比半导电胶带方便,但是只能针对一种型号。 Preferably, the semiconductive sheath layer is a semiconductive plastic sheath. The plastic sleeve is a special device, which is more convenient to use than semi-conductive tape, but it can only be used for one model. the
优选的,所述半导电胶带从一根电缆的屏蔽层包裹到另一根电缆的屏蔽层。这样的包扎确保用最少的材料,确保包扎效果。 Preferably, the semi-conductive tape is wrapped from the shielding layer of one cable to the shielding layer of another cable. Such wrapping ensures that the least material is used to ensure the wrapping effect. the
优选的,所述主绝缘层交界处以及主绝缘层表面还涂设有瓦克硅脂层。瓦克硅脂层能起到耐高温的阻燃效果,同时也能加强粘合的效果。 Preferably, the junction of the main insulating layer and the surface of the main insulating layer are also coated with a Wacker silicone grease layer. WACKER's silicone grease layer can play a flame-retardant effect of high temperature resistance, and can also strengthen the bonding effect. the
优选的,所述其中一根电缆的外半导电层断口伸出应力锥30mm形成错位。 Preferably, the fracture of the outer semiconducting layer of one of the cables protrudes 30 mm from the stress cone to form a dislocation. the
优选的,所述屏蔽层、外导电层、主绝缘层呈阶梯状分布。这样的结构在制作过程中便于找到对应层,不会出错。 Preferably, the shielding layer, the outer conductive layer and the main insulating layer are distributed in steps. Such a structure is convenient to find the corresponding layer during the production process, and there is no error. the
优选的,所述屏蔽层、外导电层、主绝缘层的露出部长度相同。这样的设计主要为了结构美观。 Preferably, the exposed portions of the shielding layer, the outer conductive layer and the main insulating layer have the same length. This design is mainly for structural beauty. the
与现有技术相比,本实用新型10kV电缆中间接头应力锥错位局部放电模型选取在真实的电缆中间接头内部人为制成一个缺陷部位,能真实而安全地反映出电缆中间接头在制造安装运行过程中暴露出来的具有代表性缺陷的性质、特征和放电机理,实现典型缺陷局放特征量的有效提取,很好的研究应力锥错位形成的局部放电特征量,对进行电缆中间接头局部放电检测提供实物基础。 Compared with the prior art, the stress cone dislocation partial discharge model of the 10kV cable intermediate joint of the utility model is selected to artificially make a defective part inside the real cable intermediate joint, which can truly and safely reflect the manufacturing, installation and operation process of the cable intermediate joint The nature, characteristics and discharge mechanism of the representative defects exposed in the test can effectively extract the characteristic quantities of partial discharge of typical defects, and study the characteristic quantities of partial discharge formed by the dislocation of stress cones well. Physical basis. the
附图说明 Description of drawings
图1为本实用新型10kV电缆中间接头应力锥错位局部放电模型所用电缆按要求拨开后的整体结构示意图。 Figure 1 is a schematic diagram of the overall structure of the cable used in the stress cone dislocation partial discharge model of the 10kV cable intermediate joint of the utility model after it is pulled apart as required. the
图2为本实用新型10kV电缆中间接头应力锥错位局部放电模型的整体结构示意图。 Fig. 2 is a schematic diagram of the overall structure of the stress cone dislocation partial discharge model of the 10kV cable intermediate joint of the utility model. the
具体实施方式 Detailed ways
10kV电缆中间接头应力锥错位局部放电模型,包括连接在一起的两根电缆1,所述电缆1逐层剥离屏蔽层11、外半导电层12、主绝缘层13、内导电层14,露出铜芯2;两根电缆1的铜芯2通过压接管3相连,所述铜芯2和压接管3外侧包有半导电套层4,所述电缆1被剥开部分外侧套设有应力锥5,其中一根电缆1的外半导电层12断口伸出应力锥至少5mm形成错位。
10kV cable intermediate joint stress cone dislocation partial discharge model, including two
所述半导电套层4为半导电胶带或半导电塑胶套。所述半导电胶带从一根电缆1的屏蔽层包裹到另一根电缆1的屏蔽层11。所述主绝缘层13交界处以及主绝缘层13表面还涂设有瓦克硅脂层。所述其中一根电缆1的外半导电层12断口伸出应力锥30mm形成错位。所述屏蔽层11、外半导电层12、主绝缘层13呈阶梯状分布
The
所述屏蔽层11、外半导电层12、主绝缘层13的露出部长度相同。
The exposed portions of the
在10kV电缆中间接头应力锥的正常制作过程中,应力锥5端部应与电缆外半导电层12断口紧密压接,为保证安装质量,应力锥5相对位置都留有一定的余量。但如果不注意,使一端外半导电层12断口伸出应力锥5尾部,就会产生电场集中,在界面处产生爬电现象,从而引发局部放电。电缆中间接头应力锥错位缺陷产生的局部放电量非常大,对电缆接头内部绝缘性能损伤较为严重。而本实用新型所制作的10kV电缆中间接头应力锥错位局部放电模型,通上10kV交流电,在一昼夜后,停止通电,剖开应力锥5位置,就能看到明显半径1-5厘米的一处或多处焦痕。通过对短路情况的分析,可以了解到在不同场合下应力锥5错位不同角度下带来的不同后果。同时也能模拟在雨天或者其他恶劣环境下的损坏状况。研究过程只需一个交流电源和远程控制开关以及一个空旷的实验场地就能实现。相比起现有技术中的其他方案,节约并且安全可靠。
In the normal production process of the stress cone of the 10kV cable intermediate joint, the end of the
本实用新型制作时在外半导电层12的断口伸出应力锥25-35mm形成错位是为了确保模拟导电后的局部放电情况足够大,便于观察,但是又确保安全。如果这个距离过小,在10kV的交流电作用下,可能要2个多星期才能检测到内部有焦痕。而这个间距过大则可能直接出现电火花,将这段电缆损坏,同时造成危险。
When the utility model is made, the fracture of the outer
以上所述仅为本实用新型的具体实施例,但本实用新型的技术特征并不局限于此,任何本领域的技术人员在本实用新型的领域内,所作的变化或修饰皆涵盖在本实用新型的专利范围之中。 The above is only a specific embodiment of the utility model, but the technical characteristics of the utility model are not limited thereto, and any changes or modifications made by those skilled in the art within the scope of the utility model are all covered by the utility model. In the scope of the new patent. the
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320699926.5U CN203673026U (en) | 2013-11-06 | 2013-11-06 | Misplaced partial discharge model for stress cone of 10kV-cable intermediate joint |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320699926.5U CN203673026U (en) | 2013-11-06 | 2013-11-06 | Misplaced partial discharge model for stress cone of 10kV-cable intermediate joint |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203673026U true CN203673026U (en) | 2014-06-25 |
Family
ID=50969304
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320699926.5U Expired - Fee Related CN203673026U (en) | 2013-11-06 | 2013-11-06 | Misplaced partial discharge model for stress cone of 10kV-cable intermediate joint |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203673026U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103630807A (en) * | 2013-11-06 | 2014-03-12 | 国家电网公司 | Partial discharge model for staggering of stress cone of 10kV cable intermediate joint |
| CN104065020A (en) * | 2014-07-11 | 2014-09-24 | 国家电网公司 | Medium-voltage cable accessory defect model based on RTV coatings |
| CN104078876A (en) * | 2014-07-11 | 2014-10-01 | 国家电网公司 | Medium voltage cable and accessory defect treatment method based on RTV coatings |
-
2013
- 2013-11-06 CN CN201320699926.5U patent/CN203673026U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103630807A (en) * | 2013-11-06 | 2014-03-12 | 国家电网公司 | Partial discharge model for staggering of stress cone of 10kV cable intermediate joint |
| CN103630807B (en) * | 2013-11-06 | 2017-01-18 | 国家电网公司 | Partial discharge model for staggering of stress cone of 10kV cable intermediate joint |
| CN104065020A (en) * | 2014-07-11 | 2014-09-24 | 国家电网公司 | Medium-voltage cable accessory defect model based on RTV coatings |
| CN104078876A (en) * | 2014-07-11 | 2014-10-01 | 国家电网公司 | Medium voltage cable and accessory defect treatment method based on RTV coatings |
| CN104065020B (en) * | 2014-07-11 | 2016-08-17 | 国家电网公司 | A kind of midium voltage cable adnexa defect model based on RTV coating |
| CN104078876B (en) * | 2014-07-11 | 2016-09-07 | 国家电网公司 | A kind of midium voltage cable annex defect handling method based on RTV coating |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103630807B (en) | Partial discharge model for staggering of stress cone of 10kV cable intermediate joint | |
| CN203673026U (en) | Misplaced partial discharge model for stress cone of 10kV-cable intermediate joint | |
| CN104065020B (en) | A kind of midium voltage cable adnexa defect model based on RTV coating | |
| CN103630805A (en) | Partial discharge model for conductive particles on insulating surface of 10kV cable intermediate joint | |
| CN204131079U (en) | A kind of 35kV and following cable intermediate junction device | |
| CN205828708U (en) | A kind of fast cable connector | |
| CN107946006A (en) | A kind of insulating sheath for suspended insulated guide wire tie point | |
| CN104078876B (en) | A kind of midium voltage cable annex defect handling method based on RTV coating | |
| CN204131073U (en) | A kind of 35kV and following cable termination jockey | |
| CN204101079U (en) | The comprehensive monitoring sensor of high-tension cable operational factor | |
| CN104078915A (en) | Cable middle connector and connecting method thereof | |
| CN103630806B (en) | 10kV cable intermediate joint stress cone dislocation partial discharge model manufacture method | |
| CN209844528U (en) | Joint structure suitable for 35kV and following well low voltage cable | |
| CN201222643Y (en) | Inner waterproofing type middle, low-voltage crosslinked polyetylene insulated cable shrinking straight joint | |
| CN204905595U (en) | a cable joint | |
| CN208127453U (en) | A kind of cable connection structure convenient for detection | |
| CN201655984U (en) | Primary cable joint of light | |
| CN204348360U (en) | A kind of intelligent self-heating multicore Plastic-sheathed Cable | |
| CN201345230Y (en) | Multilayer insulated cable | |
| CN204130232U (en) | Silicon rubber insulation fireproof control cable | |
| CN104283179A (en) | Middle connection device and method for cables of 35kV or below | |
| CN203688723U (en) | Insulation surface conductive particle partial discharge model of 10kV cable intermediate joint | |
| CN203225502U (en) | 110kV or above prefabricated dry-type cable terminal attachment | |
| CN204205456U (en) | An insulating coating sleeve | |
| CN205303052U (en) | Novel power cable |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 100045 West Chang'an Avenue, Beijing, No. 86, No. Co-patentee after: Jinhua Power Supply Company, State Grid Zhejiang Electric Power Company Patentee after: State Grid Corporation of China Co-patentee after: Red phase Limited by Share Ltd Address before: 100045 West Chang'an Avenue, Beijing, No. 86, No. Co-patentee before: Jinhua Power Supply Company, State Grid Zhejiang Electric Power Company Patentee before: State Grid Corporation of China Co-patentee before: Xiamen Red Phase Instruments Inc. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140625 Termination date: 20191106 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |