CN203671118U - Steel-plastic transition pipe - Google Patents
Steel-plastic transition pipe Download PDFInfo
- Publication number
- CN203671118U CN203671118U CN201320856954.3U CN201320856954U CN203671118U CN 203671118 U CN203671118 U CN 203671118U CN 201320856954 U CN201320856954 U CN 201320856954U CN 203671118 U CN203671118 U CN 203671118U
- Authority
- CN
- China
- Prior art keywords
- steel
- pipe
- plastic tube
- tube
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Rigid Pipes And Flexible Pipes (AREA)
Abstract
The utility model discloses a steel-plastic transition pipe. The steel-plastic transition pipe comprises a plastic pipe and a steel pipe, wherein the plastic pipe is bent, and one end of the plastic pipe is fixedly connected with the steel pipe. A bent part of the steel-plastic transition pipe is arranged on the plastic pipe, and because the bending performance of the plastic pipe is far higher than profile steel, the bent part is not prone to fracturing or leaking.
Description
Technical field
The utility model relates to seamless steel pipe and PE(polyethylene) tube transitions refutes the pipeline parts connecing, and particularly a kind of steel is moulded transition tube.
Background technique
At present, underground introduction pipe line and the surface line of China's pipeline gas industry, generally adopt steel to mould the rigid connection after transition.The connecting tube of under ground piping and surface duct at present, traditional way, the electric smelting threeway that before general employing building, house steward PE63 welds a PE63X32X63, the inlet tube that mates the PE32 of welding with PE63 locates to install the electric smelting elbow of a PE32X32 of welding beyond building foundation again, elbow is vertically located welded and installed steel and is moulded transition tube, is incorporated into indoor by the screwed connection of steel pipe.
In the patent document that the structure of moulding transition tube for steel is " CN2572188Y " at license notification number, disclose, steel is moulded the bend pipe that transition tube is roughly 90 °, have by steel pipe bend bend pipe in 90 ° and at least molding and forming at the plastic tube of bend pipe one end.Receive the reason of larger stress in bending place and cause, in long-term using process, easily occurring the problem that fracture is revealed in this bending place to there is larger potential safety hazard due to steel pipe, be therefore necessary to improve for the problems referred to above.
Summary of the invention
For the deficiencies in the prior art, the utility model provides steel to mould transition tube, solved existing steel mould transition tube easily rupture in bend pipe bending place reveal problem.
The utility model is achieved by the following technical solution: steel is moulded transition tube, comprises plastic tube and steel pipe, and described plastic tube bending, is connected with steel pipe in one end of described plastic tube.
In technique scheme, described plastic tube is directly injected and molded in described steel pipe.
In technique scheme, on the outer wall of one end that described steel pipe is connected with described plastic tube, be provided with helical teeth.
In technique scheme, in the bending place of described plastic tube, fixed base is set.
In technique scheme, described plastic tube is polyethylene pipe or steel frame polyethylene compound pipe.
The utlity model has following beneficial effect: be arranged on plastic tube by the position of steel being moulded to transition tube bending, because plastic tube material bending performance is far above shaped steel, therefore bending place is not easy to occur fracture and reveals.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the partial enlarged drawing at A place in Fig. 1.
Embodiment
Below the utility model is described in further detail, embodiment 1: referring to Fig. 1 to Fig. 2, steel is moulded transition tube, comprises plastic tube 2 and steel pipe 1, and described plastic tube 2 bends, and is connected with steel pipe 1 in one end of described plastic tube 2.By kink being arranged on the good plastic tube of bending performance, therefore in use steel is moulded transition tube bending place and is not easy to occur fracture and the problem of revealing.
Described plastic tube 2 is directly injected and molded in described steel pipe 1, ensure that plastic tube 2 and steel pipe 1 fixing position have good sealability, and be provided with helical teeth 10 on the outer wall of the one end being connected with described plastic tube 2 at described steel pipe 1, the opposite direction that the direction of this helical teeth 10 and steel pipe 1 insert, plastic tube 2 injection mouldings are in the time of described steel pipe 1, by the cooperation of helical teeth 10 and plastic tube 2 inwalls, steel pipe 1 can not deviate from from plastic tube 2.
In the bending place of described plastic tube 2, fixed base 20 is set, in the time that steel is moulded transition tube installation, can it be directly vertically placed on to ground by fixed base 20, it is more convenient to make to install.
Embodiment 2: on described steel pipe 1, screw thread is set, one end that described plastic tube 2 is connected in described steel pipe 1 is screw, and described steel pipe 1 is fixed in described plastic tube 2 by the cooperation of screw thread and screw, embodiment 2 all the other with embodiment 1.
In above-described embodiment, plastic tube 2 adopts polyethylene pipe or steel frame polyethylene compound pipe, has very high decay resistance when having higher-strength, has ensured that steel moulds the working life of transition tube.
Claims (5)
1. steel is moulded transition tube, comprises plastic tube (2) and steel pipe (1), it is characterized in that: described plastic tube (2) bending, is connected with steel pipe (1) in one end of described plastic tube (2).
2. steel as claimed in claim 1 is moulded transition tube, it is characterized in that: described plastic tube (2) is directly injected and molded in described steel pipe (1).
3. steel as claimed in claim 2 is moulded transition tube, it is characterized in that: on the outer wall of one end that described steel pipe (1) is connected with described plastic tube (2), be provided with helical teeth (10).
4. steel as claimed in claim 1 is moulded transition tube, it is characterized in that: in the bending place of described plastic tube (2), fixed base (20) is set.
5. steel as claimed in claim 1 is moulded transition tube, it is characterized in that: described plastic tube (2) is polyethylene pipe or steel frame polyethylene compound pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320856954.3U CN203671118U (en) | 2013-12-24 | 2013-12-24 | Steel-plastic transition pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320856954.3U CN203671118U (en) | 2013-12-24 | 2013-12-24 | Steel-plastic transition pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203671118U true CN203671118U (en) | 2014-06-25 |
Family
ID=50967411
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320856954.3U Expired - Fee Related CN203671118U (en) | 2013-12-24 | 2013-12-24 | Steel-plastic transition pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203671118U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103697279A (en) * | 2013-12-24 | 2014-04-02 | 宁波恒元精工管阀科技有限公司 | Steel plastic transition pipe |
-
2013
- 2013-12-24 CN CN201320856954.3U patent/CN203671118U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103697279A (en) * | 2013-12-24 | 2014-04-02 | 宁波恒元精工管阀科技有限公司 | Steel plastic transition pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203671118U (en) | Steel-plastic transition pipe | |
CN203671069U (en) | Novel steel-plastic transition pipe | |
CN203718242U (en) | Steel plastic transition pipe | |
CN103697279A (en) | Steel plastic transition pipe | |
CN202884348U (en) | Copper internal thread beam section joint with steel ring | |
CN201723895U (en) | Connector for pipe produced through rotational molding | |
CN203023717U (en) | Spigot-and-socket reducing tee electric melting pipe fitting for steel-plastic complex pipe | |
CN202812542U (en) | Double-socket hollow-wall winding pipe joint and connection structure | |
CN202149293U (en) | Plastic pipe with steel wire reinforcing layer | |
CN202644395U (en) | Water discharge pipe for railroad bridge | |
CN201187638Y (en) | Steel faucet prestress steel cylinder concrete pipe | |
CN201145115Y (en) | Middle and large caliber reduced tee piece for PVC pipe | |
CN202000374U (en) | Plastic inspection well with function of freely connecting pipes | |
CN204000941U (en) | Reducing type injection moulding manhole seat | |
CN202220913U (en) | FRPP high strength reinforcement pipe | |
CN203739072U (en) | Pipe bending mold of plastic pipe | |
CN201909126U (en) | Pipe fitting connecting element | |
CN202252338U (en) | Plum-blossom pipe clamp for ground source heat pump air conditioner | |
CN202074120U (en) | Methane pipeline | |
CN204239920U (en) | Slip-knot pipe fitting | |
CN204647681U (en) | A kind of plastic pipe union | |
CN201187639Y (en) | Steel faucet prestress steel cylinder reinforced concrete pipe | |
CN202359762U (en) | Plastic guardrail | |
CN201538968U (en) | Anti-bending device for water outlet pipe of dewatering well | |
CN204647689U (en) | A kind of cross under connects |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140625 Termination date: 20211224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |