CN203669391U - Brick stacking frame - Google Patents

Brick stacking frame Download PDF

Info

Publication number
CN203669391U
CN203669391U CN201420014036.0U CN201420014036U CN203669391U CN 203669391 U CN203669391 U CN 203669391U CN 201420014036 U CN201420014036 U CN 201420014036U CN 203669391 U CN203669391 U CN 203669391U
Authority
CN
China
Prior art keywords
fragment
brick
steel wire
holes
spring clip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420014036.0U
Other languages
Chinese (zh)
Inventor
张外文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420014036.0U priority Critical patent/CN203669391U/en
Application granted granted Critical
Publication of CN203669391U publication Critical patent/CN203669391U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

Provided is a brick stacking frame. A structural base of the brick stacking frame is formed by stacking rectangular bricks, three through holes with uniform sizes are formed in the middle of each brick, steel wires are wound among the through holes of the bricks, the steel wires penetrate through the two through holes of adjacent bricks, and the steel wires extend upwards and are woven into a latticed space structure in a vertical angle. Structural protection is carried out on independent building structures or independent building materials, and the using prospect of the brick stacking frame is wider.

Description

Fragment of brick pile framework
Technical field
The utility model relates to one and forms peripheral frame by fragment of brick and steel wire fence, becomes structure pedestal by fragment of brick pile, is engaged in winding steel wire on fragment of brick and forms external frame, to independently building structure or building materials carry out structural defence.
Background technology
At present, known construction site has many building materials of putting or precision instrument, and the also independent building structure in the construction stage, often in there is no the environment of additional protection, due to people-to-people contacts and equipment carrying, can cause the damage for structure and building materials, cause cost to rise, current safeguard procedures are considered practicality and cost savings, on protective, there is limitation, general dustcloth or the suggestion Fence structure of adopting, cannot effectively mark off independently safe space, utility model provides a kind of fragment of brick pile framework, to independently building structure or building materials carry out structural defence, this innovative design is a kind of competitive advantage greatly in commercial operation is promoted, valuable is that this know-why is simple, and it is reasonable and practical that it establishes scheme, in thinking, break down the conventions, thereby bring new technological revolution.
Summary of the invention
The defect existing in order to overcome at present traditional construction wall module; utility model provides a kind of fragment of brick pile framework; become structure pedestal by fragment of brick pile; be engaged in winding steel wire on fragment of brick and form external frame; independently building structure or building materials are carried out to structural defence, and the product of innovating by technique can better be used and be promoted at business and building engineering field.
The utility model solves the technical scheme that its technical problem adopts: the structure pedestal of fragment of brick pile framework is formed by rectangle fragment of brick pile, fragment of brick central authorities offer three evenly through holes of size, steel wire winding is between the through hole of fragment of brick, between two through holes with adjacent fragment of brick, pass steel wire, steel wire upwards extends, on vertical angle, be woven into latticed space structures, add spring clip at steel wire and fragment of brick junction, spring clip has hook and supports shell fragment, support shell fragment by fixation with steel wire on fragment of brick, the hook of spring clip is fixed on the latticed space structures of steel wire formation, outside grabbing and power is provided, by the junction structural strengthening of steel wire and fragment of brick pedestal, realize the concrete effect of this fragment of brick pile framework.For preventing the uncompleted construction structure of job site or the stacking of constructional materials is caved in or extraneous wearing and tearing, adopt on-the-spot material framework bearer bar frame, on the fragment of brick of rectangle, offer three uniform through holes, be convenient to interting of steel wire, and pile fragment of brick is that the flow-guiding channel consisting of air runoff produces the ground cardiac stress increasing, by fragment of brick pile framework surely on the ground, the latticed space structures on top is formed by braided steel wire, from heavy and light and there is certain deformation range, can carry out appropriateness according to internal construction requisite space regulates, the further fixed structure of spring clip, member becomes the interim simple and easy protection structure of building of building structure.This fragment of brick pile framework is applicable to the control application on architectural engineering technology, has expanded the scope of application, thereby and also can use in more areas technique innovation to bring more income.
The beneficial effects of the utility model are; in actual utilization process; this utility model provides a kind of fragment of brick pile framework; the structure pedestal of fragment of brick pile framework is formed by rectangle fragment of brick pile; fragment of brick central authorities offer three evenly through holes of size; steel wire winding is between the through hole of fragment of brick; between two through holes with adjacent fragment of brick, pass steel wire; steel wire upwards extends; on vertical angle, be woven into latticed space structures; independently building structure or building materials are carried out to structural defence, promoted the physical function of this fragment of brick pile framework.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is design principle figure of the present utility model.
1. fragment of brick pile frameworks in figure, 2. pedestal, 3. fragment of brick, 4. through hole, 5. steel wire, 6. spring clip, 7. hook, 8. supports shell fragment.
The specific embodiment
In Fig. 1, the structure pedestal 2 of fragment of brick pile framework 1 is formed by rectangle fragment of brick 3 piles, fragment of brick 3 central authorities offer three evenly through holes 4 of size, steel wire 5 is wrapped between the through hole 4 of fragment of brick 3, between two through holes 4 with adjacent fragment of brick 3, pass steel wire 5, steel wire 5 upwards extends, on vertical angle, be woven into latticed space structures, add spring clip 6 in steel wire 5 and fragment of brick 3 junctions, spring clip 6 has hook 7 and supports shell fragment 8, supporting shell fragment 8 is fixed on fragment of brick 3 by steel wire 5, the hook 7 of spring clip 6 is fixed on the latticed space structures that steel wire 5 forms, outside grabbing and power is provided, by the junction structural strengthening of steel wire 5 and fragment of brick 3 pedestals 2, realize the valid function of fragment of brick pile framework 1.

Claims (1)

1. a fragment of brick pile framework, the structure pedestal of fragment of brick pile framework is formed by rectangle fragment of brick pile, it is characterized in that, fragment of brick central authorities offer three evenly through holes of size, steel wire winding is between the through hole of fragment of brick, between two through holes with adjacent fragment of brick, pass steel wire, steel wire upwards extends, on vertical angle, be woven into latticed space structures, add spring clip at steel wire and fragment of brick junction, spring clip has hook and supports shell fragment, support shell fragment by fixation with steel wire on fragment of brick, the hook of spring clip is fixed on the latticed space structures of steel wire formation, by the junction structural strengthening of steel wire and fragment of brick pedestal.
CN201420014036.0U 2014-01-10 2014-01-10 Brick stacking frame Expired - Fee Related CN203669391U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420014036.0U CN203669391U (en) 2014-01-10 2014-01-10 Brick stacking frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420014036.0U CN203669391U (en) 2014-01-10 2014-01-10 Brick stacking frame

Publications (1)

Publication Number Publication Date
CN203669391U true CN203669391U (en) 2014-06-25

Family

ID=50965706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420014036.0U Expired - Fee Related CN203669391U (en) 2014-01-10 2014-01-10 Brick stacking frame

Country Status (1)

Country Link
CN (1) CN203669391U (en)

Similar Documents

Publication Publication Date Title
MX2016015920A (en) Foundations system for towers and method for installing the foundations system for towers.
MX349972B (en) Ribbed foundation for superstructures and method for producing the foundation.
CN104532850B (en) Foundation pit support system
CN103174124B (en) On-site overlapping lay-out method of vertical sand-protecting barriers
CN204040515U (en) Cat ladder
CN203669391U (en) Brick stacking frame
CN204080793U (en) Hoisting device for reinforcement cage
WO2010057187A3 (en) Tower construct suitable for wind turbines along with methods for fabricating and erecting the same
CN105442868A (en) Adjustable steel-structure reticulated shell spliced scaffold
CN205530324U (en) Miniature stake of thin -walled cold -formed steel
CN204475349U (en) Modular support device
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN204199337U (en) A kind of pile foundation construction eliminates side frictional resistance sleeve arrangement
CN203961300U (en) Tool-type passage
CN203222935U (en) Reinforcement bar spacing positioning device for silo sliding mode
CN204475348U (en) Foundation pit support system
CN205742960U (en) A kind of vertical scaffold reinforcement assembly across Bars In Poured Concrete Slab
CN205276898U (en) Wall construction support
CN201485966U (en) Anti-earthquake thickening loop in core region of frame columns
CN204401648U (en) Circular Pit inwall reinforcing cage binding stand
CN203891474U (en) Device for mounting rowed junction boxes on shear wall
CN204609477U (en) A kind of column building enclosing
CN204326307U (en) The module wall that a kind of building construction uses
CN204780940U (en) Prop up supporting beam and go up interim year platform of piling of steel construction
CN201581550U (en) Overlong structural beam provided with guide holes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140625

Termination date: 20150110

EXPY Termination of patent right or utility model