CN203660660U - Transformer substation operation overhaul intelligent auxiliary system - Google Patents
Transformer substation operation overhaul intelligent auxiliary system Download PDFInfo
- Publication number
- CN203660660U CN203660660U CN201320648241.8U CN201320648241U CN203660660U CN 203660660 U CN203660660 U CN 203660660U CN 201320648241 U CN201320648241 U CN 201320648241U CN 203660660 U CN203660660 U CN 203660660U
- Authority
- CN
- China
- Prior art keywords
- monitor
- monitors
- wia
- communication network
- passive rfid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004891 communication Methods 0.000 claims abstract description 30
- 238000007689 inspection Methods 0.000 claims abstract description 17
- 229960000909 sulfur hexafluoride Drugs 0.000 claims abstract description 12
- SFZCNBIFKDRMGX-UHFFFAOYSA-N sulfur hexafluoride Chemical compound FS(F)(F)(F)(F)F SFZCNBIFKDRMGX-UHFFFAOYSA-N 0.000 claims abstract description 11
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 8
- 238000012806 monitoring device Methods 0.000 claims description 17
- 238000012544 monitoring process Methods 0.000 claims description 13
- 239000002828 fuel tank Substances 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract description 6
- 229910018503 SF6 Inorganic materials 0.000 abstract 2
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000013329 compounding Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 210000000056 organ Anatomy 0.000 description 1
- 230000007115 recruitment Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/126—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model discloses a transformer substation operation overhaul intelligent auxiliary system comprising iron core grounded monitors, lightning arrester monitor, sulfur hexafluoride monitors and temperature monitors, wherein the iron core grounded monitors are connected with a main transformer comprehensive monitor through a WIA communication network and WIA gateways; the lightning arrester monitors, the sulfur hexafluoride monitors and the temperature monitors are connected with GIS comprehensive monitors through the WIA communication network and the WIA gateways; the main transformer comprehensive monitor and the GIS comprehensive monitors are connected with a background host through a WIFI communication network; fixed operating points and patrol inspection equipment are provided with passive RFID electronic labels; the background host is respectively connected with the passive RFID electronic labels, electronic scanners and communication terminal devices through the WIFI communication network The transformer substation operation overhaul intelligent auxiliary system is characterized in that the position information of patrol inspection personnel can be displayed through utilization of the wireless network, passive RFID electronic labels, the electronic scanners and the communication terminal devices; daily patrol inspection and fault maintenance work can be carried out by the patrol inspection personnel.
Description
technical field:
The utility model relates to a kind of power system operation detection system, particularly relates to a kind of transformer station fortune inspection intelligent assistance system.
background technology:
Along with advancing 1000kV secret service, State Grid Corporation of China presses transformer station's few man on duty and transformer station's centralized monitor work, State Grid Corporation of China constantly upgrades to the intelligent requirements of power grid construction, intellectuality patrol and examine so that with maintenance, the system of operation order joint operation must be the development trend of intelligent substation, on the one hand for improving emergency first-aid repair speed, reduce on the other hand human cost, improve science and the reliability of station, ultra high voltage Nanyang O&M technology simultaneously, for intelligent grid construction and the service of raising power supply reliability, but the current employing of patrolling and examining is carried out manually, efficiency is low and labour intensity is large, also to set up many connecting lines, cost is higher.
utility model content:
Technical problem to be solved in the utility model is: overcome the deficiencies in the prior art, provide a kind of reasonable in design, easy to use, have good positioning and detect transformer station's fortune inspection intelligent assistance system accurately.
The technical solution of the utility model is: a kind of transformer station fortune inspection intelligent assistance system, contain iron core grounding monitor, lightning arrester monitor, sulphur hexafluoride monitor and temperature monitoring, described iron core grounding monitor is connected with main transformer comprehensive monitoring device by WIA communication network and WIA gateway, described lightning arrester monitor, sulphur hexafluoride monitor and temperature monitoring are connected with GIS comprehensive monitoring device by WIA communication network and WIA gateway, and described main transformer comprehensive monitoring device is connected with background host computer by WIFI communication network with GIS comprehensive monitoring device; On fixing operation point and inspection device, be provided with passive RFID electronic label, described background host computer is connected with described passive RFID electronic label, electronic scanner and communication terminal device respectively by WIFI communication network.
Described communication terminal device is panel computer or notebook computer.The quantity of described lightning arrester monitor, sulphur hexafluoride monitor, temperature monitoring and described GIS comprehensive monitoring device is more than one.Described temperature monitoring is arranged on transformer or/and on the fuel tank of reactor.
The beneficial effects of the utility model are:
1, the signal of the various monitors of the utility model all arrives background host computer by wireless network transmissions, and this signal sends on on-scene communication terminal organ by wireless network again, is convenient to on-the-spot patrol officer and carries out at any time exchanges data, is convenient to patrol and examine and keep in repair.
2, the utility model fixing operation point and patrol and examine must process position passive RFID electronic label is installed, after patrol officer is in place, scan by communication terminal device, can show personnel positions information, trigger the corresponding operation of the panel computer carrying simultaneously, in the time of daily tour, eject the information that relevant device needs typing, as the atmospheric pressure value of circuit breaker, oil pressure value, suppress number of times etc., the leakage current of lightning arrester and action frequency, the oil temperature of transformer or high resistance is around temperature, sleeve pipe oil level etc.; While having concrete operations task, compounding practice bill system completes the operation of appointment, records simultaneously or command by data.
3, the utility model adopts passive RFID electronic label to get final product work without power supply, in addition, communication terminal device is panel computer or notebook computer, can also video or audio frequency with backstage or technical specialist is on-the-spot exchanges, improve the efficiency of maintenance, and solve a maintenance difficult problem.
4, the utility model has improved station and O&M efficiency, can directly save station attendant's recruitment cost; Also improve and patrolled and examined O&M quality, potential faults has been got rid of and possible trouble, improved power supply reliability, strengthened grid stability, increased electrical network intelligent.
5, the utility model reasonable in design, easy to use, have good positioning and detect accurately, be easy to promotion and implementation, there is good economic benefit.
brief description of the drawings:
Fig. 1 is the circuit block diagram of transformer station's fortune inspection intelligent assistance system.
embodiment:
Embodiment: referring to Fig. 1, in figure, 1-iron core grounding monitor; 2-gateway; 3-main transformer comprehensive monitoring device; 4-background host computer; 5-GIS comprehensive monitoring device; 6-lightning arrester monitor; 7-sulphur hexafluoride monitor; 8-temperature monitoring.
Transformer station's fortune inspection intelligent assistance system contains iron core grounding monitor 1, lightning arrester monitor 6, sulphur hexafluoride monitor 7 and temperature monitoring 8, wherein: iron core grounding monitor 1 is connected with main transformer comprehensive monitoring device 3 by WIA communication network and WIA gateway 2, lightning arrester monitor 6, sulphur hexafluoride monitor 7 and temperature monitoring 8 are connected with GIS comprehensive monitoring device 5 by WIA communication network and WIA gateway, and main transformer comprehensive monitoring device 3 is connected with background host computer 4 by WIFI communication network with GIS comprehensive monitoring device 5; On fixing operation point and inspection device, be provided with passive RFID electronic label (not shown in FIG.), background host computer 4 is connected with passive RFID electronic label, electronic scanner and communication terminal device respectively by WIFI communication network.
Communication terminal device is panel computer or notebook computer.The quantity of lightning arrester monitor 6, sulphur hexafluoride monitor 7, temperature monitoring 8 and GIS comprehensive monitoring device 5 is more than one, forms many groups.Temperature monitoring 8 is arranged on transformer or/and on the fuel tank of reactor.
In Daily Round Check work, patrol officer is scanned passive RFID electronic label by CT scanner, can determine the position that patrol officer arrives, can check near the information of each monitor this passive RFID electronic label by communication terminal device, also can be by some input information in communication terminal device, and be transferred to background host computer 4 and process and store, if noted abnormalities, patrol officer, by Network Capture faulty equipment electronic record, formulates Strategies of Maintenance; Also can open the video acquisition remote assistance of communication terminal device.Maintenance grid switching operation coordinates electronic operational ticket to carry out, and at intelligent patrol detection terminal opening operation flow process interface, carries out flow operations, is shown details of operation and is carried out detailed record by picture and text.
Above execution mode is only the preferred embodiments of the present invention; the invention is not restricted to above-described embodiment; for persons skilled in the art, any apparent change of under the prerequisite that does not deviate from the principle of the invention, it being done, all belongs to protection scope of the present invention.
Claims (4)
1. transformer station's fortune inspection intelligent assistance system, contain iron core grounding monitor, lightning arrester monitor, sulphur hexafluoride monitor and temperature monitoring, it is characterized in that: described iron core grounding monitor is connected with main transformer comprehensive monitoring device by WIA communication network and WIA gateway, described lightning arrester monitor, sulphur hexafluoride monitor and temperature monitoring are connected with GIS comprehensive monitoring device by WIA communication network and WIA gateway, and described main transformer comprehensive monitoring device is connected with background host computer by WIFI communication network with GIS comprehensive monitoring device; On fixing operation point and inspection device, be provided with passive RFID electronic label, described background host computer is connected with described passive RFID electronic label, electronic scanner and communication terminal device respectively by WIFI communication network.
2. transformer station according to claim 1 fortune inspection intelligent assistance system, is characterized in that: described communication terminal device is panel computer or notebook computer.
3. transformer station according to claim 1 fortune inspection intelligent assistance system, is characterized in that: the quantity of described lightning arrester monitor, sulphur hexafluoride monitor, temperature monitoring and described GIS comprehensive monitoring device is more than one.
4. transformer station according to claim 1 fortune inspection intelligent assistance system, is characterized in that: described temperature monitoring is arranged on transformer or/and on the fuel tank of reactor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320648241.8U CN203660660U (en) | 2013-10-21 | 2013-10-21 | Transformer substation operation overhaul intelligent auxiliary system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320648241.8U CN203660660U (en) | 2013-10-21 | 2013-10-21 | Transformer substation operation overhaul intelligent auxiliary system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203660660U true CN203660660U (en) | 2014-06-18 |
Family
ID=50927013
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320648241.8U Expired - Fee Related CN203660660U (en) | 2013-10-21 | 2013-10-21 | Transformer substation operation overhaul intelligent auxiliary system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203660660U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105117837A (en) * | 2015-08-19 | 2015-12-02 | 国网山东省电力公司烟台供电公司 | Power grid apparatus whole life cycle archive management system |
CN105318978A (en) * | 2014-07-21 | 2016-02-10 | 中国科学院沈阳自动化研究所 | Wireless temperature measurement system of transformer temperature rise test |
CN106680663A (en) * | 2016-11-18 | 2017-05-17 | 云南电网有限责任公司电力科学研究院 | Online detection method and system for multi-branch power distribution network transformer |
-
2013
- 2013-10-21 CN CN201320648241.8U patent/CN203660660U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105318978A (en) * | 2014-07-21 | 2016-02-10 | 中国科学院沈阳自动化研究所 | Wireless temperature measurement system of transformer temperature rise test |
CN105117837A (en) * | 2015-08-19 | 2015-12-02 | 国网山东省电力公司烟台供电公司 | Power grid apparatus whole life cycle archive management system |
CN106680663A (en) * | 2016-11-18 | 2017-05-17 | 云南电网有限责任公司电力科学研究院 | Online detection method and system for multi-branch power distribution network transformer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205265369U (en) | Cable and tunnel operation and maintenance management field data application apparatus | |
CN104020374A (en) | Intelligent substation secondary equipment site-wide simulation test system | |
CN204391903U (en) | A kind of line loss monitoring system | |
CN204536448U (en) | A kind of high voltage supply leakage conductor wireless monitoring device | |
CN105356620A (en) | Electric energy quality monitoring system | |
CN203660660U (en) | Transformer substation operation overhaul intelligent auxiliary system | |
CN104377821A (en) | Power transformation equipment online monitoring system | |
CN106841933B (en) | Transmission line fault comprehensive positioning method and system | |
CN202333983U (en) | Comprehensive automatic system for railway power substation | |
CN203164334U (en) | Mobile power quality analyzer | |
CN205986337U (en) | System of patrolling and examining based on EMS remote signalling item | |
CN103558432A (en) | High-voltage direct connection type electricity stealing detection device | |
CN203813518U (en) | Monitoring system hardware platform of integrated power device | |
CN213581213U (en) | Overhead distribution line fault positioning system | |
CN202393811U (en) | On-line monitoring apparatus for lightning arrester for protecting series compensation capacitor | |
CN103746450A (en) | Monitoring system of integrated power equipment | |
CN207199074U (en) | For debugging the portable terminal device and electric-power metering terminal system of electric-power metering terminal | |
CN202904690U (en) | Intelligent patrol system of switching station | |
CN202838342U (en) | Data collection device used in protective relaying maintenance state | |
CN201892971U (en) | System for obtaining electric energy quality data from intelligent electric meter management system | |
CN203069698U (en) | An integrated information acquiring device of electric energy in a transformer station | |
CN203275554U (en) | Multipoint electric power parameter monitoring management system based on ARM and WinCE | |
CN207036975U (en) | Lightning rod running status on-Line Monitor Device | |
CN204928367U (en) | Electric wire netting device talk data interface | |
CN110428062A (en) | A kind of monitoring of process oil recovery tank and intelligent analysis system based on electric power Internet of Things |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140618 Termination date: 20141021 |
|
EXPY | Termination of patent right or utility model |