CN203657495U - Novel annular cooler device for pellet production line - Google Patents
Novel annular cooler device for pellet production line Download PDFInfo
- Publication number
- CN203657495U CN203657495U CN201420000772.0U CN201420000772U CN203657495U CN 203657495 U CN203657495 U CN 203657495U CN 201420000772 U CN201420000772 U CN 201420000772U CN 203657495 U CN203657495 U CN 203657495U
- Authority
- CN
- China
- Prior art keywords
- ring
- section
- annular
- segment
- production line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Furnace Details (AREA)
Abstract
The utility model discloses a novel annular cooler device for a pellet production line. The novel annular cooler device comprises a material-receiving area, a cooling area and a discharging area. The cooling area comprises an annular I segment, an annular II segment, an annular III segment and an annular IV segment. A sealing top cover is arranged above the cooling area. Air boxes are uniformly arranged below the cooling area. Hot air outlets are respectively arranged at the sealing top cover of the annular I segment, the annular II segment, the annular III segment and the annular IV segment. Wind-break walls are respectively arranged between two segments among the annular I segment, the annular II segment, the annular III segment and the annular IV segment. The annular I segment is connected with the material-receiving area. The annular IV segment is connected with a discharging area. The novel annular cooler device for the pellet production line has following beneficial effects: a scientific improvement is made on a presently-used annular cooler; recovery and utilization of heat are further carried out; and therefore energy is saved and waste of resources is reduced.
Description
Technical field
The utility model relates to the central cooler equipment of the grate-kiln production line of producing pellet, is specially a kind of Novel pellet production line central cooler equipment.
Background technology
The operation principle of current pelletizing grate-kiln production line central cooler equipment is, high temperature pellet from rotary kiln out, enter on the chassis of feed hopper continuous uniform ground cloth at slewing frame through gravity flow screen, slewing frame passes through chain drive by the sprocket wheel of drive unit, on supporting roller channel, make horizontal circular motion, simultaneously air blast is sent cold air into the bellows below chassis, cold air is under the effect of normal pressure, enter the hot-bulb nodulizing bed of material and carry out with it heat exchange by chassis base plate gap, then hot blast is delivered to rotary kiln and drying grate or smoke stack emission by the cold cover of ring of bed of material end face through backheat pipeline and is gone out, high temperature pellet is able to cooling.In the time that chassis returns back to discharge zone, high temperature pellet is also cooled to design temperature simultaneously.
Current pelletizing grate-kiln production line central cooler equipment mainly divides three process sections: ring I, ring II, ring II I, carry out cooling to roasting 1000 ℃ above pellets, ring I section hot blast is sent into recycling in rotary kiln, it is dry that ring II section hot blast enters chain grate machine by connecting pipe, II section is dry to green-ball, and ring I II section hot blast is emptying.Due to the requirement of Processes and apparatus, ring I, ring II section recovery utilization rate less than 50%, and remaining more than 50% heat energy enters in the air, cause great waste, if reclaimed from ring III, because ring II I section faces blanking, send into cold blast rate larger, the hot blast temperature of whole ring III section is only 150 ℃ of left and right, recycles comparatively difficulty.
Utility model content
In order to overcome above-mentioned technological deficiency, the utility model provides a kind of Novel pellet production line central cooler equipment, can further carry out waste heat recovery.
The utility model solves the technical scheme that its technical problem adopts, a kind of Novel pellet production line central cooler equipment, comprise material receiving area, cooling zone and discharge zone, described cooling zone comprises ring I section, ring II section, ring I II section and ring IV section, top, described cooling zone is provided with sealing overhead guard, below is evenly provided with bellows, on the sealing overhead guard of described ring I section, ring II section, ring III section and ring IV section, be respectively equipped with a hot-blast outlet, in described ring I section, ring II section, ring I II section and ring IV section, between adjacent two sections, be respectively equipped with windbreak; Described ring I section is connected with material receiving area, and described ring IV section is connected with discharge zone;
Described ring II I section is UTILIZATION OF VESIDUAL HEAT IN district, and below, described UTILIZATION OF VESIDUAL HEAT IN district is provided with two bellows, and the air inlet of described bellows is provided with control valve.
The beneficial effect that the utility model produces is: the utility model carries out science improvement on existing central cooler basis, and heat is further recycled, and has effectively saved the energy, has reduced the waste of resource.
Accompanying drawing explanation
As shown be structural representation of the present utility model;
In figure, 1, material receiving area 2, ring I section 3, ring II section 4, ring III section 5, ring IV section 6, discharge zone 7, hot-blast outlet 8, windbreak.
The specific embodiment
Below in conjunction with accompanying drawing and example, the utility model is further illustrated:
As shown in the figure, a kind of Novel pellet production line central cooler equipment, comprise material receiving area 1, cooling zone and discharge zone 6, described cooling zone comprises ring I section 2, ring II section 3, ring I II section 4 and ring IV section 5, top, described cooling zone is provided with sealing overhead guard, below is evenly provided with bellows, on the sealing overhead guard of described ring I section 2, ring II section 3, ring II I section 4 and ring IV section 5, be respectively equipped with a hot-blast outlet 7, described ring between two sections adjacent in I section 2, ring II section 3, ring III section 4 and ring IV section 5 is respectively equipped with windbreak 8; Described ring I section 2 is connected with material receiving area 1, and described ring IV section 5 is connected with discharge zone 6;
Described ring III section 4 is UTILIZATION OF VESIDUAL HEAT IN district, and below, described UTILIZATION OF VESIDUAL HEAT IN district is provided with two bellows, and the air inlet of described bellows is provided with control valve.
The utility model by existing central cooler three process sections change four process sections into, first bellows of last bellows region of ring II section 3 and ring II I section 4 are isolated with windbreak 8 as a new technology section, above this region, seal again overhead guard and open hot-blast outlet 7 connecting pipes, carry out waste heat recovery.After transformation, ring I section 2 is constant, and ring II section 3 continues to chain grate machine heat air delivery, and ring III section 4 is UTILIZATION OF VESIDUAL HEAT IN district, and ring IV section 5 is emptying by chimney.
For existing central cooler, ring 950 ℃ of left and right of I section, ring II section 750-900 ℃, first bellows region material layer temperature of ring III section is between 400-700 ℃, add the temperature of last bellows of ring II, waste heat recovery district just can collect the hot blast of 300-500 ℃, and available waste heat boiler produces steam and generates electricity.
The utility model encircles II I Duan HehuanⅣ district for the ease of operation waste heat recovery district and shares ring III section blower fan, be circulating fan ring II section fan improvement, the warm wind of having a surplus after processing is sent into ring II section, through chain grate machine transfer heat in the bed of material, accomplish that heat energy makes full use of.In waste heat recovery district, two bellows air inlets add control valve, are convenient to control temperature.
Concrete repacking mode of the present utility model is, windbreak between existing ring II section and ring III section is removed, ring II last bellows of section and first bellows of ring III section are separated by two windbreaks and all the other two sections, above the sealing overhead guard of these two sections, open a hot-blast outlet, connecting pipe is carried out waste heat recovery.
The utility model is not limited to above-mentioned embodiment, and anyone should learn the structural change of making under enlightenment of the present utility model, every with the utlity model has identical or close technical scheme, within all falling into protection domain of the present utility model.
Technology, shape, structure part that the utility model is not described in detail are known technology.
Claims (2)
1. a Novel pellet production line central cooler equipment, comprise material receiving area, cooling zone and discharge zone, it is characterized in that, described cooling zone comprises ring I section, ring II section, ring III section and ring IV section, top, described cooling zone is provided with sealing overhead guard, below is evenly provided with bellows, on the sealing overhead guard of described ring I section, ring II section, ring III section and ring IV section, be respectively equipped with a hot-blast outlet, in described ring I section, ring II section, ring III section and ring IV section, between adjacent two sections, be respectively equipped with windbreak; Described ring I section is connected with material receiving area, and described ring IV section is connected with discharge zone.
2. Novel pellet production line central cooler equipment as claimed in claim 1, is characterized in that, described HuanⅢDuan Wei UTILIZATION OF VESIDUAL HEAT IN district, and below, described UTILIZATION OF VESIDUAL HEAT IN district is provided with two bellows, and the air inlet of described bellows is provided with control valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420000772.0U CN203657495U (en) | 2014-01-02 | 2014-01-02 | Novel annular cooler device for pellet production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420000772.0U CN203657495U (en) | 2014-01-02 | 2014-01-02 | Novel annular cooler device for pellet production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203657495U true CN203657495U (en) | 2014-06-18 |
Family
ID=50923874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420000772.0U Expired - Fee Related CN203657495U (en) | 2014-01-02 | 2014-01-02 | Novel annular cooler device for pellet production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203657495U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306945A (en) * | 2019-11-11 | 2020-06-19 | 湖南理工学院 | Circular cooler with particle size screening function |
-
2014
- 2014-01-02 CN CN201420000772.0U patent/CN203657495U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306945A (en) * | 2019-11-11 | 2020-06-19 | 湖南理工学院 | Circular cooler with particle size screening function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205014851U (en) | Sintering deposit shows heat reclamation device | |
CN106556258A (en) | Sintering mine sensible heat retracting device and its using method | |
CN106907931A (en) | Process and system that sintering deposit waste heat drags main exhauster are reclaimed with perpendicular cold kiln | |
CN202853402U (en) | High-efficient heat recovery type sinter mine cooling system | |
CN202403498U (en) | Carbon material drying machine | |
CN203454809U (en) | Cylindrical cooling device for thermal-state mineral blocky-shaped particles | |
CN105021049A (en) | Vertical cooling tower and sintering waste heat comprehensive utilization system | |
CN106242229A (en) | Sludge dewatering treatment device | |
CN104359321B (en) | A kind of vertical cement chamotte cooler | |
CN206479044U (en) | The process system that sintering deposit waste heat drags main exhauster is reclaimed with perpendicular cold kiln | |
CN207600223U (en) | A kind of sinter air-draft-type circulating cooling system | |
CN105861768A (en) | Blast furnace cinder dry-process treatment device | |
CN202470676U (en) | Carbon material drying machine | |
CN203768043U (en) | Roasting transformation, distributing and cooling-recovery production device of spodumene | |
CN203657495U (en) | Novel annular cooler device for pellet production line | |
CN106635111B (en) | A kind of biomass pyrolytic production liquid fuel co-producing bio charcoal system | |
CN204923908U (en) | System is used multipurposely to sintering cooling tower and sintering waste heat | |
CN101799240A (en) | Method for using waste heat flue gas from rotary hearth furnace | |
CN104294036B (en) | Iron ore pellet roasting device | |
CN103332673A (en) | Heat-accumulating type semi-coke rotary kiln | |
CN109536656B (en) | Granulating system adopting roller pumping drying method | |
CN209877658U (en) | Waste heat efficient recovery and comprehensive utilization system of rotary vertical type cooler for sintered ore | |
CN202361817U (en) | Machine tail environment managing device of palletizing chain grate machine | |
CN204138620U (en) | High temperature dust raw gas cold filtration pyrolysis installation | |
CN107098345A (en) | Prepare the device of granulated carbide |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140618 Termination date: 20160102 |
|
EXPY | Termination of patent right or utility model |