CN203654751U - Turnover internal supporting structure of shear wall - Google Patents

Turnover internal supporting structure of shear wall Download PDF

Info

Publication number
CN203654751U
CN203654751U CN201420023158.6U CN201420023158U CN203654751U CN 203654751 U CN203654751 U CN 203654751U CN 201420023158 U CN201420023158 U CN 201420023158U CN 203654751 U CN203654751 U CN 203654751U
Authority
CN
China
Prior art keywords
steel pipe
shear wall
wall
supporting structure
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420023158.6U
Other languages
Chinese (zh)
Inventor
谢惠庆
文芳
苏启旺
康清泉
向元勇
罗波
李熊飞
张毅
贾鹏坤
蔡宏儒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu No4 Construction Engineering Co
Original Assignee
Chengdu No4 Construction Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu No4 Construction Engineering Co filed Critical Chengdu No4 Construction Engineering Co
Priority to CN201420023158.6U priority Critical patent/CN203654751U/en
Application granted granted Critical
Publication of CN203654751U publication Critical patent/CN203654751U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of shear wall construction, particularly to a turnover internal supporting structure of a shear wall. The turnover internal supporting structure comprises through-wall opposite-pull screws and also comprises a steel pipe which is utilized as an internal support; the through-wall opposite-pull screws are arranged inside in a sleeving mode through the steel pipe; the turnover internal supporting structure also comprises a plastic pipe which is arranged on the periphery of the steel pipe in a sleeving mode. Compared with concrete internal supporting strips or welded reinforced internal supports in the prior art, the steel pipe is utilized as the internal support, the repeated turnover use of the steel pipe can be achieved after one-time production, and accordingly the mass cost is saved and the economic effect is obvious.

Description

Shear wall can have enough to meet the need inner supporting structure
Technical field
The utility model relates to shear wall construction technical field, is specifically related to a kind of shear wall and can has enough to meet the need inner supporting structure.
Background technology
Common shear wall formwork inner support has two kinds of methods at present, the first as shown in Figure 1, to adopt the sizing pea gravel concreten support bar 6 of customization to do inner support, concrete support bar is to be placed on shear wall horizontal distribution muscle, its colligation is tight, smooth to ensure shear wall formwork 4 pieces in joist, and adjacent shear wall formwork planeness can not exceed 1mm.As shown in Figure 1, three concrete support bars 6 are arranged on and between both sides shear wall formwork 4, play inner support effect, shear wall formwork 4 outsides are wooden a tree, used in making timber for boats 5, by reference to the accompanying drawings 2, wall-punching pair-pulling threaded spindle 1 passes in the hole from shear wall formwork 4, the outer plastic pipe-covered 3 of wall-punching pair-pulling threaded spindle 1, plastic pipe 3 is provided with plug 7 with the joint of shear wall formwork 4.Adopt and be applicable in this way the situation that shear wall thickness is less (thickness is less than 500mm); For thicker shear wall, the method need to increase quantity, the increasing support bar size of concrete support bar 6 and strengthen rigidity, this has just increased the difficulty of concreting body of wall between both sides shear wall formwork 4, can not ensure concrete pouring quality, because larger, a fairly large number of words of concrete inner bracing strip 6 sizes, be unfavorable for vibrating of walls concrete, easily cause the leakiness of vibrating, form the quality problems such as honeycomb, pitted skin, dew muscle.
Second method is the reinforcing bar inner support that adopts welding, and reinforcing bar inner support is placed on shear wall horizontal distribution muscle and is welded and fixed, and as shown in Figure 3, three I shape reinforcing bar inner supports 8 are arranged between both sides shear wall formwork 4 and play a supportive role.For thicker shear wall, adopting the problem existing in this way has: the first, need to increase the use amount of reinforcing bar inner support to meet requirement of strength, and can cause like this problem that reinforcing bar welding recruitment is many, cost is high; The second, for thicker wall, adopt the rigidity of reinforcing bar inner support good not, can cause the bad shortcoming of shear wall surface evenness; The 3rd, in two side templates after concreting, reinforcing bar inner support 8 can be stayed in body of wall and cannot have enough to meet the need use, causes high material consumption.
Utility model content
The problem existing for prior art, provides a kind of shear wall can have enough to meet the need inner supporting structure.
The technical solution adopted in the utility model is:
A kind of shear wall can have enough to meet the need inner supporting structure, comprises wall-punching pair-pulling threaded spindle, also comprises the steel pipe as inner support, and described steel pipe also comprises the plastic pipe that is sleeved on described steel pipe periphery in described wall-punching pair-pulling threaded spindle is sleeved in addition.In the prior art of comparing, use the reinforcing bar inner support of concrete inner support bar or welding, the utility model adopts steel pipe to do inner support, when dismounting, steel pipe can be taken out plastic pipe is stayed in body of wall, steel pipe only needs can realize and repeatedly can have enough to meet the need use after disposable production, save great amount of cost, economic effect is obvious.The utility model does inner support without welding with steel pipe, and steel pipe good rigidity is specially adapted to thicker shear wall, can ensure the construction quality compared with thick shear-wall.
As preferred embodiment of the present utility model, described plastic pipe is PVC plastic pipe.
As preferred embodiment of the present utility model, described steel pipe is coating steel pipe.
As preferred embodiment of the present utility model, described coating steel pipe is JDG pipe.
This patent also discloses a kind of above-mentioned shear wall and can have enough to meet the need the using method of inner supporting structure in addition, first on shear wall formwork, accomplishes fluently wall-punching pair-pulling threaded spindle eyelet, after treating shear force wall reinforcing steel bar colligation, fixes a side shear wall formwork; Then, from described wall-punching pair-pulling threaded spindle eyelet, penetrate described wall-punching pair-pulling threaded spindle, more successively described steel pipe and described plastic pipe sleeve as inner support is contained on described wall-punching pair-pulling threaded spindle, opposite side shear wall formwork is installed afterwards; Finally, fixing described wall-punching pair-pulling threaded spindle.Before concreting, can also seal by the thing such as joint filling caulking gum or foam between described plastic pipe and shear wall formwork, while preventing from pouring into a mould shear wall, the gap of concrete between plastic pipe and shear wall formwork, flow into and bond with steel pipe, being unfavorable for the dismounting of steel pipe.In the utility model, steel pipe is to be enclosed within on wall-punching pair-pulling threaded spindle, and in the shear wall Screw arbor with nut at both-ends hole that wall-punching pair-pulling threaded spindle interts on shear wall formwork, shear wall formwork is without increasing perforate again, simple installation and improved operating efficiency.
As the preferred embodiment of the method, meeting concreting after both sides shear wall formwork installs, when concrete in shear wall formwork reaches requiring of the dismountable template of codes and standards, take out wall-punching pair-pulling threaded spindle, after removing described shear wall formwork, take out described steel pipe, described plastic pipe is stayed in body of wall.In the prior art of comparing, use concrete inner support bar, the utility model adopts steel pipe to do inner support, when dismounting, steel pipe can be taken out and plastic pipe is stayed in body of wall, and steel pipe only needs can realize and repeatedly can have enough to meet the need use after disposable production, save great amount of cost, economic effect is obvious.
In sum, owing to having adopted technique scheme, the beneficial effects of the utility model are:
1, compare in prior art by the reinforcing bar inner support of concrete inner support bar or welding, the utility model adopts steel pipe to do inner support, when dismounting, steel pipe can be taken out and plastic pipe is stayed in body of wall, steel pipe only needs can realize and repeatedly can have enough to meet the need use after disposable production, save great amount of cost, economic effect is obvious.
2, the utility model does inner support without welding with steel pipe, and steel pipe good rigidity is specially adapted to thicker shear wall, can ensure the construction quality compared with thick shear-wall.
3, in the utility model, steel pipe is to be enclosed within on wall-punching pair-pulling threaded spindle, and in the shear wall Screw arbor with nut at both-ends hole that wall-punching pair-pulling threaded spindle interts on shear wall formwork, shear wall formwork is without increasing perforate again, simple installation and improved operating efficiency.
4, the utility model construction safety, does not need welding, reduces construction safety risk, reduces and pollutes, and ensures personal safety as well as the property safety, and minimizing accident occurs.
Brief description of the drawings
Fig. 1 is the structural representation that prior art adopts concrete support bar
Fig. 2 is the C place enlarged drawing in Fig. 1
Fig. 3 is the structural representation of available technology adopting reinforcing bar inner support
Fig. 4 is structural representation of the present utility model
Fig. 5 is A place partial enlarged drawing in Fig. 4
Fig. 6 be in Fig. 5 B-B to sectional view
Mark in figure: 1-wall-punching pair-pulling threaded spindle, 2-steel pipe, 3-plastic pipe, 4-shear wall formwork, 5-wood a tree, used in making timber for boats, 6-concrete support bar, 7-plug, 8-reinforcing bar inner support.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is described further.Should be appreciated that specific embodiment described herein is only in order to explain the utility model, and be not used in restriction the utility model.
embodiment 1
Shear wall as shown in Figure 5 can have enough to meet the need inner supporting structure, comprise wall-punching pair-pulling threaded spindle 1, also comprise the steel pipe 2 as inner support, in conjunction with Fig. 6, described steel pipe 2 also comprises the plastic pipe 3 that is sleeved on described steel pipe 2 peripheries in described wall-punching pair-pulling threaded spindle 1 is sleeved in addition.Between described wall-punching pair-pulling threaded spindle 1 and described steel pipe 2, all leave gap between described steel pipe 2 and described plastic pipe 3, be convenient to dismounting.In the prior art of comparing, use the reinforcing bar inner support of concrete inner support bar or welding, the utility model adopts steel pipe 2 to do inner support, when dismounting, steel pipe 2 can be taken out plastic pipe 3 is stayed in body of wall, after 2 disposable productions of needs of steel pipe, can realize and repeatedly can have enough to meet the need use, save great amount of cost, economic effect is obvious.The utility model does inner support without welding with steel pipe 2, and steel pipe good rigidity is specially adapted to thicker shear wall, can ensure the construction quality compared with thick shear-wall.Plastic pipe 3 described in the present embodiment is PVC plastic pipe.Steel pipe 2 described in the present embodiment is the JDG pipe in coating steel pipe.The utility model is applicable to the shear wall that thickness is larger, is particularly useful for the shear wall that thickness is less than or equal to 1 meter.In construction, conventional wall-punching pair-pulling threaded spindle diameter has 12mm, 14mm, 16mm and tetra-kinds of models of 18mm, and these four kinds of diameter model are all applicable to the utility model, adopt the wall-punching pair-pulling threaded spindle of 14mm diameter in the present embodiment.In construction, conventional diameter of steel tube has two kinds of 16mm and 20mm, and 16mm diameter steel thickness of pipe wall is 1.2mm, and wall thickness allowable variation is ± 0.12mm; 20mm diameter steel thickness of pipe wall is 1.6mm, and wall thickness allowable variation is ± 0.15mm.16mm and 20mm diameter steel pipe are all applicable to the utility model, and in the present embodiment, diameter of steel tube adopts 20mm.
This technology also discloses a kind of above-mentioned shear wall can have enough to meet the need the using method of inner supporting structure, as shown in Figure 4, first on shear wall formwork 4, accomplishes fluently wall-punching pair-pulling threaded spindle eyelet, after treating shear force wall reinforcing steel bar colligation, fixes a side shear wall formwork 4; Then, from described wall-punching pair-pulling threaded spindle eyelet, penetrate described wall-punching pair-pulling threaded spindle 1, more successively described steel pipe 2 and described plastic pipe 3 as inner support is sleeved on described wall-punching pair-pulling threaded spindle, opposite side shear wall formwork 4 is installed afterwards; Finally, fixing described wall-punching pair-pulling threaded spindle, installs butterfly button at the two ends of wall-punching pair-pulling threaded spindle 1.In this technology, steel pipe 2 is to be enclosed within on wall-punching pair-pulling threaded spindle 1, and in the shear wall Screw arbor with nut at both-ends eyelet that wall-punching pair-pulling threaded spindle 1 interts on shear wall formwork 4, shear wall formwork is without increasing perforate again, simple installation and improved operating efficiency.Before concreting, can also seal by the thing such as joint filling caulking gum or foam between described plastic pipe 3 and shear wall formwork 4, while preventing from pouring into a mould shear wall, the gap of concrete between plastic pipe 3 and shear wall formwork 4, flow into and bond with steel pipe 2, being unfavorable for the dismounting of steel pipe 2.
Both sides shear wall formwork 4 installs after-pouring concrete, when concrete in both sides shear wall formwork 4 reaches requiring of the dismountable template of codes and standards, take out wall-punching pair-pulling threaded spindle 1, remove the described steel pipe 2 of the rear taking-up of described shear wall formwork 4, described plastic pipe 3 is stayed in body of wall.In the prior art of comparing, use concrete inner support bar, the present invention adopts steel pipe 2 to do inner support, when dismounting, steel pipe 2 can be taken out and plastic pipe 3 is stayed in body of wall, can realize and repeatedly can have enough to meet the need use after 2 disposable productions of needs of steel pipe, save great amount of cost, economic effect is obvious.The present invention is specially adapted to the occasion that shear wall thickness is larger, applicable to the shear wall of thickness≤1m.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., within all should being included in protection scope of the present invention.

Claims (4)

1. shear wall can have enough to meet the need an inner supporting structure, comprises wall-punching pair-pulling threaded spindle, it is characterized in that, also comprises the steel pipe as inner support, and described steel pipe also comprises the plastic pipe that is sleeved on described steel pipe periphery in described wall-punching pair-pulling threaded spindle is sleeved in addition.
2. shear wall according to claim 1 can have enough to meet the need inner supporting structure, it is characterized in that, described plastic pipe is PVC plastic pipe.
3. shear wall according to claim 1 and 2 can have enough to meet the need inner supporting structure, it is characterized in that, described steel pipe is coating steel pipe.
4. shear wall according to claim 3 can have enough to meet the need braced structures, it is characterized in that, described coating steel pipe is JDG pipe.
CN201420023158.6U 2014-01-14 2014-01-14 Turnover internal supporting structure of shear wall Expired - Lifetime CN203654751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420023158.6U CN203654751U (en) 2014-01-14 2014-01-14 Turnover internal supporting structure of shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420023158.6U CN203654751U (en) 2014-01-14 2014-01-14 Turnover internal supporting structure of shear wall

Publications (1)

Publication Number Publication Date
CN203654751U true CN203654751U (en) 2014-06-18

Family

ID=50921155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420023158.6U Expired - Lifetime CN203654751U (en) 2014-01-14 2014-01-14 Turnover internal supporting structure of shear wall

Country Status (1)

Country Link
CN (1) CN203654751U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711309A (en) * 2014-01-14 2014-04-09 成都市第四建筑工程公司 Shear wall turnable internal support structure and use method thereof
CN110185261A (en) * 2019-05-09 2019-08-30 五冶集团上海有限公司 A kind of shear wall formwork inner supporting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711309A (en) * 2014-01-14 2014-04-09 成都市第四建筑工程公司 Shear wall turnable internal support structure and use method thereof
CN110185261A (en) * 2019-05-09 2019-08-30 五冶集团上海有限公司 A kind of shear wall formwork inner supporting structure

Similar Documents

Publication Publication Date Title
CN202706536U (en) Lateral support formwork applied to post-cast strip or construction joint
CN104295092A (en) Adjustable frame column formwork back arris system
CN203654751U (en) Turnover internal supporting structure of shear wall
CN107083804B (en) A kind of wall structure column joint bar construction method
CN202530763U (en) Cast-in-place concrete structure deformation joint formwork construction device
CN103711309A (en) Shear wall turnable internal support structure and use method thereof
CN107687281A (en) A kind of prestressing force pull end slip-form template installation method
CN204626961U (en) A kind of steel form trussed construction of swallow-tail form large-sized concrete pier stud
CN204356959U (en) 3D prints truss cassette ceiling
CN206539005U (en) Formwork structure for narrow and small movement joint both sides shear wall construction
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN206539007U (en) A kind of arch steel concrete wall formwork erecting structure
CN203441105U (en) Hole template supporting tool
CN209397912U (en) A kind of ruggedized construction of ultra-long and ultra-thick core tube template
CN207245172U (en) A kind of constructional column prefab-form structure
CN115045499A (en) Deformation joint wall formwork reinforcing method
CN109386129A (en) The reinforcement means of large-diameter concrete column-form
CN205713089U (en) A kind of concrete column tie ruggedized construction
CN103089007A (en) Cast-in-place concrete floor punching pipe seal template device and using method
CN203603369U (en) Channel steel converting steel beam
CN203846679U (en) Tie bar of embedded sleeve of infilled wall
CN104626341B (en) Cored slab internal model and its method for assembly and disassembly
CN207484961U (en) A kind of novel wall column steel form
CN105648932B (en) Fixing device and its application method for highway reinforced concrete box culvert end template
CN204604573U (en) PVC embedded box in a kind of fixed concrete