CN203653277U - Recycled water and sewage improvement system of waste heat power generation workshop - Google Patents

Recycled water and sewage improvement system of waste heat power generation workshop Download PDF

Info

Publication number
CN203653277U
CN203653277U CN201420004284.7U CN201420004284U CN203653277U CN 203653277 U CN203653277 U CN 203653277U CN 201420004284 U CN201420004284 U CN 201420004284U CN 203653277 U CN203653277 U CN 203653277U
Authority
CN
China
Prior art keywords
pipeline
vertical mill
water
place
fork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420004284.7U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN XINFENG CEMENT CO Ltd
Original Assignee
WUHAN XINFENG CEMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN XINFENG CEMENT CO Ltd filed Critical WUHAN XINFENG CEMENT CO Ltd
Priority to CN201420004284.7U priority Critical patent/CN203653277U/en
Application granted granted Critical
Publication of CN203653277U publication Critical patent/CN203653277U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model provides a recycled water and sewage improvement system of a waste heat power generation workshop, wherein the system is simple in structure and convenient for recycling. The system comprises a No. 2 vertical mill and a No.3 vertical mill and is characterized in that a pipeline A is arranged on the No.3 vertical mill; a fork is arranged on the pipeline A and respectively connected with a recycled water tank and a sewage treatment place; a recycled water treatment place is respectively connected with the recycled tank and a water producing workshop through the pipeline A; a circulating water tank is connected with the pipeline A arranged between the water producing workshop and the recycled water treatment place through the pipeline A, and the joint is a connection point A; the connection point A is close to one side of the water producing workshop; one end of the 5000t circulating water tank is connected with the No.3 vertical mill through the pipeline A and the other end is connected with the pipeline A arranged between the No.3 vertical mill and the fork through a pipeline B; the recycled water tank is connected with the pipeline A arranged between the sewage treatment place and the fork through the pipeline B. After improvement, the operation mode is relatively safe, the safety of the vertical mill in water use is improved, the operation frequency of an operator is reduced, and the normal operation of the equipment is guaranteed as well.

Description

A kind of cogeneration workshop Zhong Shui, sewage improved system
Technical field
The utility model relates to a kind of cogeneration workshop Zhong Shui, sink drainage, relates in particular to a kind of cogeneration workshop Zhong Shui, sewage improved system.
Background technology
As everyone knows, power industry is water consumption rich and influential family, every day is the about 1600 tons of left and right of circulating cooling make-up water only, substantially maintain 2000 tons of/day summer, except cooling pool evaporation, approximately 1000 tons of/day left and right water are because of the outer row of blowdown need, all very large for making softening water water consumption between waterwheel processed, but make the water discharging in softening water process between circulating water pool sewer and waterwheel processed, still can process a little and should use, but in the power plant for self-supply of other grog production unit, this part water is most of to be arranged outward as waste water, do not focus on reclaiming not in addition processing and utilizing, cause very large water resource waste.
Summary of the invention
In order to solve the problems of the technologies described above, it is a kind of simple in structure that the utility model provides, be convenient to the cogeneration workshop Zhong Shui recycling, sewage improved system, comprise 2# Vertical Mill and 3# Vertical Mill, it is characterized in that being provided with pipeline A on described 3# Vertical Mill, on pipeline A, be provided with a fork, described fork is connected with sewage disposal place with middle pond respectively, middle water treatment place is connected respectively with between middle pond and waterwheel processed by pipeline A, circulating water pool is connected by the pipeline A between pipeline A and waterwheel processed and between middle water treatment place, connecting place is tie point A, tie point A is near one side between waterwheel processed, described 5000t circulating water pool one end is connected with 3# Vertical Mill by pipeline A, the other end is connected with the pipeline A between 3# Vertical Mill and fork by pipeline B, described middle pond is connected with the pipeline A between sewage disposal place and fork by pipeline B, described sewage disposal place is connected by the pipeline A between pipeline B and waterwheel processed and between middle water treatment place, connecting place is tie point B, described tie point B is near middle water treatment place one side, described 2# Vertical Mill is connected with 3# Vertical Mill is parallel by pipeline A.
The beneficial effects of the utility model are:
1, improvement cost is lower, and benefit is obviously direct.360 tons/day, the former water of direct saving after transformation; Save small pump electric weight 1066 to spend/day.
2, administration quarter sewage disposal place can bringing normally into operation, the middle water of sewage disposal can directly be utilized, the sewer of simultaneously cannot processing completely because of reasons such as backwashes when plant area's water purifier can be discharged to sewage disposal place again and process, and sewer is all utilized like this, does not cause water resource waste.
3, improved operation scheme is safer, has improved the water safety of Vertical Mill, reduces operations staff's the operation frequency, has also guaranteed the normal operation of equipment simultaneously.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Wherein: 1-2# Vertical Mill, 2-3# Vertical Mill, 3-pipeline A, 4-fork, pond in 5-, 6-sewage disposal place, water treatment place in 7-, between 8-waterwheel processed, 9-circulating water pool, 10-tie point A, 11-5000t circulating water pool, 12-pipeline B, 13-tie point B.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail;
As shown in Figure 1, on 3# Vertical Mill 2, be provided with pipeline A3, on pipeline A3, be provided with a fork 4, fork 4 is connected with sewage disposal place 6 with middle pond 5 respectively, middle water treatment place 78 is connected respectively with between middle pond 5 and waterwheel processed by pipeline A3, circulating water pool 9 by between pipeline A3 and waterwheel processed 8 and middle water treatment place 7 between pipeline A3 be connected, connecting place is tie point A10, tie point A10 is near 8 one sides between waterwheel processed, 5000t circulating water pool 11 one end are connected with 3# Vertical Mill 2 by pipeline A3, the other end is connected with the pipeline A3 between 3# Vertical Mill 2 and fork 4 by pipeline B12, middle pond 5 is connected with the pipeline A3 between sewage disposal place 6 and fork 4 by pipeline B12, sewage disposal place 6 by between pipeline B12 and waterwheel processed 8 and middle water treatment place 7 between pipeline A3 be connected, connecting place is tie point B13, tie point B13 is near middle water treatment place 7 one sides, 2# Vertical Mill 1 is connected with 3# Vertical Mill 2 is parallel by pipeline A3.
Improvement cost is lower, and benefit is obviously direct.360 tons/day, the former water of direct saving after transformation; Save small pump electric weight 1066 to spend/day, administration quarter sewage disposal place 6 can bringing normally into operation, the middle water of sewage disposal can directly be utilized, the sewer of simultaneously cannot processing completely because of reasons such as backwashes when plant area's water purifier can be discharged to sewage disposal place 6 again and process, and sewer is all utilized like this, does not cause water resource waste, improved operation scheme is safer, improve the water safety of Vertical Mill, reduced operations staff's the operation frequency, also guaranteed the normal operation of equipment simultaneously.

Claims (1)

1. a cogeneration workshop Zhong Shui, sewage improved system, comprise 2# Vertical Mill (1) and 3# Vertical Mill (2), it is characterized in that being provided with on described 3# Vertical Mill (2) pipeline A (3), on pipeline A (3), be provided with a fork (4), described fork (4) is connected with sewage disposal place (6) with middle pond (5) respectively, middle water treatment place (7) by pipeline A (3) respectively with middle pond (5) and waterwheel processed between (8) be connected, circulating water pool (9) is connected by the pipeline A (3) between (8) between pipeline A (3) and waterwheel processed and middle water treatment place (7), connecting place is tie point A (10), tie point A (10) is near (8) one sides between waterwheel processed, described 5000t circulating water pool (11) one end is connected with 3# Vertical Mill (2) by pipeline A (3), the other end is connected with the pipeline A (3) between 3# Vertical Mill (2) and fork (4) by pipeline B (12), described middle pond (5) is connected with the pipeline A (3) between sewage disposal place (6) and fork (4) by pipeline B (12), described sewage disposal place (6) is connected by the pipeline A (3) between (8) between pipeline B (12) and waterwheel processed and middle water treatment place (7), connecting place is tie point B (13), described tie point B (13) is near middle water treatment place (7) one sides, described 2# Vertical Mill (1) is connected with 3# Vertical Mill (2) is parallel by pipeline A (3).
CN201420004284.7U 2014-01-03 2014-01-03 Recycled water and sewage improvement system of waste heat power generation workshop Expired - Lifetime CN203653277U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420004284.7U CN203653277U (en) 2014-01-03 2014-01-03 Recycled water and sewage improvement system of waste heat power generation workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420004284.7U CN203653277U (en) 2014-01-03 2014-01-03 Recycled water and sewage improvement system of waste heat power generation workshop

Publications (1)

Publication Number Publication Date
CN203653277U true CN203653277U (en) 2014-06-18

Family

ID=50919691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420004284.7U Expired - Lifetime CN203653277U (en) 2014-01-03 2014-01-03 Recycled water and sewage improvement system of waste heat power generation workshop

Country Status (1)

Country Link
CN (1) CN203653277U (en)

Similar Documents

Publication Publication Date Title
CN203144204U (en) Filtering and heat energy recovering device supplied with power by solar energy
CN203653277U (en) Recycled water and sewage improvement system of waste heat power generation workshop
CN205024335U (en) Dissolve copper jar waste heat reutilization system
CN205975781U (en) Extraction of traditional chinese medicine material workshop circulating water system
CN203790602U (en) Alcohol atmospheric distillation and waste-liquid concentration thermal coupling system of molasses materials
CN203454470U (en) Heat pump system for efficiently utilizing residual heat of waste water
CN203754430U (en) Silicon carbide recycling device
CN206927636U (en) A kind of dehydrogenation of isobutane device waste water reclaiming device
CN203346241U (en) Microwave-strengthening solar-energy reclaimed-water high-temperature double-source heat-pump sludge-drying system
CN202852793U (en) Water recycling system capable of preventing shaking and water spraying of deaerator
CN202717637U (en) Primary water storage circulating system of purified water preparation workshop
CN202606135U (en) Water cooling circulating system
CN204221516U (en) The water supply installation that multiple stage lathe shares
CN202592644U (en) Improved structure of circulating cooling water system for production of expandable polystyrene (EPS) foam products
CN203411525U (en) Molten oil steam recycling device
CN203922799U (en) A kind of chemical fibre is produced the oily-water seperating equipment of oil-polluted water
CN203489742U (en) Waste water heat energy recovering system
CN218292106U (en) Industrial waste water normal position regeneration recycling system
CN204401710U (en) Domestic waste water the automatic recovery reutilizing device
CN203392878U (en) Wastewater cyclic utilization system applicable to producing terpilenol
CN203540349U (en) Total recycling self-circulation system of purified water
CN203021323U (en) Distillation system automatically saving water
CN103848527A (en) Sewage treatment device
CN204058367U (en) The dual residual neat recovering system of vacuum still of Wet vacuum distillation processing condensed-nuclei aromatics oil
CN201925908U (en) Paper-making condensed water recovery system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140618