CN203629160U - Crystallizer refrigerating apparatus - Google Patents

Crystallizer refrigerating apparatus Download PDF

Info

Publication number
CN203629160U
CN203629160U CN201320811064.0U CN201320811064U CN203629160U CN 203629160 U CN203629160 U CN 203629160U CN 201320811064 U CN201320811064 U CN 201320811064U CN 203629160 U CN203629160 U CN 203629160U
Authority
CN
China
Prior art keywords
tank
refrigerant
storage tank
crystallizing
matchmaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320811064.0U
Other languages
Chinese (zh)
Inventor
彭华
许开兵
许一鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN YINGCHENG GREASE INDUSTRY CO LTD
Original Assignee
HUNAN YINGCHENG GREASE INDUSTRY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN YINGCHENG GREASE INDUSTRY CO LTD filed Critical HUNAN YINGCHENG GREASE INDUSTRY CO LTD
Priority to CN201320811064.0U priority Critical patent/CN203629160U/en
Application granted granted Critical
Publication of CN203629160U publication Critical patent/CN203629160U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a crystallizer refrigerating apparatus which comprises a storage tank, a refrigerating machine and a transferring tank, wherein the storage tank is connected with the refrigerant inlet of a crystallizing tank through a medium inlet pipe, the refrigerant outlet of the crystallizing tank is connected with the transferring tank through a first circulating pipe, and the refrigerating machine is respectively connected with the transferring tank and the storage tank. Refrigerant flows out of the refrigerant outlet of the crystallizing tank, flows into the transferring tank, and the refrigerating machine sequentially and then flows back to the storage tank after being cooled. Since the refrigerant transferring tank is employed, the refrigerant is cooled before flowing back to the storage tank. The refrigerant in the storage tank maintains certain cooling capacity and ensures refrigeration effect.

Description

A kind of crystallizing tank refrigerating plant
Technical field
The utility model relates to grease manufacture field, refers to especially a kind of crystallizing tank refrigerating plant.
Background technology
Winterization crystallizing tank carries out heat exchange cooling by refrigerant (cooling medium) to oil.In crystallizing tank, be provided with cooling coil, be connected with cooling system, refrigerant through refrigeration machine refrigeration enters refrigerant storage tank, refrigerant from storage tank out, from crystallizing tank bottom and middle part (point upper and lower two parts cooling coil in crystallizing tank, two parts coil pipe respectively has a refrigerant access port) pump into cooling coil in crystallizing tank, flow out from the outlet up and down of cooling coil respectively with the refrigerant after oily heat exchange.Like this, be back to refrigerant storage tank with the high temperature refrigerant after oily heat exchange, mix with the low temperature refrigerant of lowering the temperature through refrigeration machine.
This refrigerant circulation reduces the low temperature refrigerant cold in storage tank, affects coolant refrigeration effect, has increased refrigeration machine energy consumption, and then has affected the refrigeration of whole cooling system.
Utility model content
In view of this, the purpose of this utility model is to propose a kind of crystallizing tank refrigerating plant, solves refrigerant utilization rate low, the technical problem that energy consumption is large, refrigeration is undesirable.
The crystallizing tank refrigerating plant providing based on above-mentioned purpose the utility model, comprises storage tank, refrigeration machine and transfer tank; Wherein, described storage tank is connected with the refrigerant entrance of described crystallizing tank by entering matchmaker's pipeline, the refrigerant exit of described crystallizing tank is connected with described transfer tank and described storage tank respectively by the first circulating line, and described refrigeration machine connects respectively described transfer tank and described storage tank; Refrigerant enters described transfer tank from the refrigerant exit of described crystallizing tank flows out, and then flows into described refrigeration machine, after refrigeration, flows back to described storage tank.
Optionally, the refrigerant exit of described crystallizing tank also by the second circulating line with described in enter matchmaker's pipeline communication, described in the refrigerant flowing out from the refrigerant exit of described crystallizing tank can reenter, enter matchmaker's pipeline and again carry out cooling to described crystallizing tank.
Optionally, described the first circulating line is provided with pneumatic operated valve and temperature control system, the switch of described pneumatic operated valve and the size of folding are subject to described temperature control system control, described temperature control system by control described pneumatic operated valve adjust refrigerant flow back to the ratio of described transfer tank and again flow into described in enter the ratio of matchmaker's pipeline.
Optionally, described in, entering matchmaker's pipeline is connected by emptying pipe with described storage tank.
As can be seen from above, the crystallizing tank refrigerating plant that the utility model provides by the installation of refrigerant transfer tank, was lowered the temperature before refrigerant flows back to storage tank, made the refrigerant in storage tank keep cold, had guaranteed refrigeration.The setting of the second circulating line makes to flow out a part of refrigerant after crystallizing tank and can again be incorporated to into matchmaker and roll into a ball with fresh refrigerant and together proceed refrigeration, takes full advantage of refrigerant, has further reduced energy consumption.
Accompanying drawing explanation
Fig. 1 is the utility model crystallizing tank refrigerating plant embodiment schematic diagram;
Fig. 2 is the utility model crystallizing tank refrigerating plant the first circulating line embodiment schematic diagram.
The specific embodiment
For making the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with specific embodiment, and with reference to accompanying drawing, the utility model is further described.
Crystallizing tank refrigerating plant as shown in Figure 1, is loaded with grease to be cooled in crystallizing tank 1, cooling coil is the refrigerating plant in crystallizing tank 1, is divided into upper and lower two parts coil pipe, and every a part of coil pipe has respectively an entrance and exit.The entrance and exit of upper part cooling coil is called upper inlet 7 and upper outlet 8, and the entrance and exit of lower part cooling coil is called lower inlet 9 and lower outlet 10.The upper inlet 7 of crystallizing tank 1 is connected by pipeline with storage tank 2 with lower inlet 9, and this segment pipe is called into matchmaker's pipeline 5, and fresh refrigerant is through entering matchmaker's pipeline 5 and pumped into upper inlet 7 by pump 12 and lower inlet 9 entering cooling coil.Refrigerant is flowed through after cooling coil lowers the temperature to the grease in crystallizing tank 1, flows out respectively from upper outlet 8 and outlet 10.Upper outlet 8 is connected with the first circulating line 6 with lower outlet 10, and the other end of the first circulating line 6 connects respectively storage tank 2 and transfer tank 3, and transfer tank 3 is connected with storage tank 2 by refrigeration machine 4.Refrigerant flows back to storage tank 2 or transfer tank 3 through the first circulating line 6, can be by the valve control on pipeline.Significantly raise if flow out the temperature of refrigerant of crystallizing tank 1, directly flow back to the cold that storage tank 2 can the serious refrigerant that lowers storage, can select to allow refrigerant first flow to transfer tank 3, entering refrigeration machine 4 after naturally cooling freezes, and finally flows back in storage tank 2.
By the installation of refrigerant transfer tank 3, before flowing back to storage tank 2, refrigerant lowers the temperature, and make the refrigerant in storage tank 2 keep cold, guarantee refrigeration, reduce the energy consumption of refrigeration machine 4.
As one preferred embodiment, as shown in Figure 2, the upper outlet 8 of crystallizing tank and lower outlet 10 also by pipeline with enter matchmaker's pipeline 5 and be connected, this section of connecting pipe is called the second circulating line 11.The refrigerant flowing out from upper outlet 8 and outlet 10 can enter into matchmaker's pipeline 5 again through the second circulating line 11, is pumped to crystallizing tank 1 and freezes together with fresh refrigerant, has improved the utilization rate of refrigerant.At work, as shown in Figure 2, together with the refrigerant flowing out converges to, require refrigerant to be divided into two-way according to concrete cooling from upper outlet 8 with outlet 10, wherein a road refrigerant first circulating line 6 of flowing through enters transfer tank 3, finally flows back to storage tank 2; Another road refrigerant enters into matchmaker's pipeline 5 again through the second circulating line 11, is pumped in crystallizing tank 1 and again grease is lowered the temperature together with fresh refrigerant.The utilization of this shunting design maximizes refrigerant, reduced energy consumption for cooling.
As one preferred embodiment, as shown in Figure 2, on described the first circulating line 6, pneumatic operated valve 13 and temperature control system are installed, the switch of described pneumatic operated valve 13 and the size of folding are subject to temperature control system control, described in described temperature control system control pneumatic operated valve 13 adjust refrigerant flow back to the ratio of described transfer tank 3 and again flow into described in enter the ratio of matchmaker's pipeline 5, reasonably alleviate the load of refrigeration machine 4, reduce energy consumption.Described temperature control system adopts conventional PLC system (Programmable Logic Controller) now to control, and it is not only temperature control system.Its main operation logic is: by being arranged on the equipment such as temperature sensor, pressure sensor and the liquid level monitoring in workshop, real time information is fed back to PLC system, system is according to the technological requirement of setting, assign instruction to equipment such as valves, control its opening degree, so that it reaches technological requirement.As, cold is carried for making full use of refrigerant in workshop, system can first-selected allow refrigerant after heat exchange through the oil supply cooling that refluxes again of the second circulating line 11, but winterization crystallization growing the grain process has strict demand to cooling rate, in the time that TEMP feeds back to PLC system information and shows that refrigerant cold can not meet the demand of cooling rate in cooling coil, PLC system can be assigned rapidly instruction, open or increase the opening degree of pneumatic operated valve 13, increase and be back to coolant quantity after the heat exchange of transfer tank 3, reduce and enter coolant quantity after the second circulating line 11 heat exchange, increase simultaneously and control fresh refrigerant input valve opening degree, thereby the fresh refrigerant ratio that enters cooling coil increases, cooling rate is accelerated, in the time finding that cooling rate is too fast, situation is contrary.
Optionally, described in enter matchmaker's pipeline 5 and be connected by emptying pipe 14 with described storage tank 2, in the time of work, emptying pipe 14 is closed, and after crystallizing tank 1 has freezed, opens emptying pipe 14, drains in storage tank 2 remaining in into the refrigerant of matchmaker's pipeline 5.
As can be seen from above, the crystallizing tank refrigerating plant that the utility model provides by the installation of refrigerant transfer tank 3, was lowered the temperature before refrigerant flows back to storage tank 2, made the refrigerant in storage tank 2 keep cold, had guaranteed refrigeration.The setting of the second circulating line 11 makes a part of refrigerant after refrigeration can be directly incorporated into fresh refrigerant and proceeds refrigeration, takes full advantage of refrigerant, has further reduced energy consumption.
Those of ordinary skill in the field are to be understood that: the foregoing is only specific embodiment of the utility model; be not limited to the utility model; all within spirit of the present utility model and principle; any modification of making, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (4)

1. a crystallizing tank refrigerating plant, is characterized in that, comprises storage tank, refrigeration machine and transfer tank; Wherein,
Described storage tank is connected with the refrigerant entrance of described crystallizing tank by entering matchmaker's pipeline, the refrigerant exit of described crystallizing tank is connected with described transfer tank and described storage tank respectively by the first circulating line, and described refrigeration machine connects respectively described transfer tank and described storage tank;
Refrigerant enters described transfer tank and described storage tank from the refrigerant exit of described crystallizing tank flows out, and the refrigerant in described transfer tank flows back to described storage tank after flowing into described refrigeration machine refrigeration.
2. crystallizing tank refrigerating plant according to claim 1, it is characterized in that, the refrigerant exit of described crystallizing tank also by the second circulating line with described in enter matchmaker's pipeline communication, described in the refrigerant flowing out from described refrigerant exit enters again by described the second circulating line, enter matchmaker's pipeline.
3. crystallizing tank refrigerating plant according to claim 2, it is characterized in that, described the first circulating line is provided with pneumatic operated valve and temperature control system, the switch of described pneumatic operated valve and the size of folding are subject to described temperature control system control, described temperature control system by control described pneumatic operated valve adjust refrigerant flow back to the ratio of described transfer tank and again flow into described in enter the ratio of matchmaker's pipeline.
4. crystallizing tank refrigerating plant according to claim 1, is characterized in that, described in enter matchmaker's pipeline and be also connected by emptying pipe with described storage tank.
CN201320811064.0U 2013-12-10 2013-12-10 Crystallizer refrigerating apparatus Expired - Fee Related CN203629160U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320811064.0U CN203629160U (en) 2013-12-10 2013-12-10 Crystallizer refrigerating apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320811064.0U CN203629160U (en) 2013-12-10 2013-12-10 Crystallizer refrigerating apparatus

Publications (1)

Publication Number Publication Date
CN203629160U true CN203629160U (en) 2014-06-04

Family

ID=50815628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320811064.0U Expired - Fee Related CN203629160U (en) 2013-12-10 2013-12-10 Crystallizer refrigerating apparatus

Country Status (1)

Country Link
CN (1) CN203629160U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107091550A (en) * 2016-02-18 2017-08-25 顺丰速运有限公司 Thesaurus system, thesaurus refrigerating method and repository device
CN111481055A (en) * 2020-03-25 2020-08-04 张文丞 Beverage maker

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107091550A (en) * 2016-02-18 2017-08-25 顺丰速运有限公司 Thesaurus system, thesaurus refrigerating method and repository device
CN111481055A (en) * 2020-03-25 2020-08-04 张文丞 Beverage maker
WO2021190109A1 (en) * 2020-03-25 2021-09-30 盛霖国际股份有限公司 Beverage making machine
JP2022530327A (en) * 2020-03-25 2022-06-29 盛霖国際股▲ふん▼有限公司 Beverage making equipment

Similar Documents

Publication Publication Date Title
CN206235051U (en) A kind of interval cooling liquid cool equipment of double water tank
CN108195099A (en) A kind of connected machine and its control method
CN103654418A (en) Refrigeration device of water dispenser and method for improving refrigeration efficiency
CN105222386B (en) A kind of pneumatic GM refrigeration machines and its control process
CN203629160U (en) Crystallizer refrigerating apparatus
CN106931799A (en) A kind of cooling tower device and control method with moisturizing and anti-scaling function
CN206618289U (en) A kind of cooling tower device with moisturizing and anti-scaling function
CN202820961U (en) Refrigerating device of water dispenser
CN104879865B (en) A kind of chilled water storage system being adapted in transition season and winter operation
CN207515288U (en) The efficient central air-conditioning refrigeration system of cold storage condensation
CN104567532A (en) Cooling water dual recycling system of heat exchanging equipment
CN203393172U (en) Online adjusting system for heat load distribution of full-cooling-wall blast furnace
KR101544014B1 (en) Water heat storage system that intelligent variable flow automatically control using modular
CN204301590U (en) A kind of liquid-circulating control system
CN209371417U (en) Cold source also serves as data center's cold supply system of the spare cold source of data center
CN204574671U (en) A kind of refrigeration system of grid-connected reduction cool cycles water consumption
CN204593704U (en) A kind of chilled water storage system being adapted at transition season and winter operation
CN104807248B (en) A kind of centralized cold and heat source system for workshop circulation
CN204301345U (en) A kind of cooling system of liquid cooling equipment
CN201133779Y (en) Multi-pool cold-storage system
CN204478913U (en) A kind of two recovery system of cooling water of heat transmission equipment
CN205580046U (en) Water cooling treatment system
CN209181368U (en) A kind of multi items substance changes device for cooling
CN205505542U (en) Efficient liquid cooling system
CN205446495U (en) Recirculated cooling water device suitable for oil -well rig braking system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20191210