CN203628646U - Light combustion-supporting wind and combustion gas integrated heat storing burner - Google Patents

Light combustion-supporting wind and combustion gas integrated heat storing burner Download PDF

Info

Publication number
CN203628646U
CN203628646U CN201320809295.8U CN201320809295U CN203628646U CN 203628646 U CN203628646 U CN 203628646U CN 201320809295 U CN201320809295 U CN 201320809295U CN 203628646 U CN203628646 U CN 203628646U
Authority
CN
China
Prior art keywords
combustion
heat storing
heat
burner
supporting wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320809295.8U
Other languages
Chinese (zh)
Inventor
余阳春
付力
陈雄军
吴喜英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUANGGANG ZHONGZHOU ANDA THERMAL EQUIPMENT CO Ltd
Original Assignee
HUANGGANG ZHONGZHOU ANDA THERMAL EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUANGGANG ZHONGZHOU ANDA THERMAL EQUIPMENT CO Ltd filed Critical HUANGGANG ZHONGZHOU ANDA THERMAL EQUIPMENT CO Ltd
Priority to CN201320809295.8U priority Critical patent/CN203628646U/en
Application granted granted Critical
Publication of CN203628646U publication Critical patent/CN203628646U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Abstract

The utility model discloses a light combustion-supporting wind and combustion gas integrated heat storing burner solving a series of problems of large cross section temperature difference due to wide cross section and inadequate flame length, insufficient combustion due to unevenness of combustion gas and combustion-supporting wind mixture and energy loss due to inadequate combustion of exhaust gas. The light combustion-supporting wind and combustion gas integrated heat storing burner is characterized by comprising a heat storing case body (4), a combustion-supporting wind chamber (2) and a high pressure rotational flow burner block (7), wherein a heat storing body (6) and a heat preservation and insulation layer (5) are arranged in the heat storing case body (4); one end of the heat storing case body (4) is provided with the combustion-supporting wind chamber (2) and the other end thereof is connected with the high pressure rotational flow burner block (7); the upper part of the heat storing case body (4) is provided with fuel gas branch pipes; and an end part of the combustion-supporting wind chamber (2) is provided with an access door (10) and an air duct joint (1). Each burner is provided with an independent heat storing chamber and an independent air case, so that not only light and rational structure is provided for the light combustion-supporting wind and combustion gas integrated heat storing burner, but heat loss and pipeline heat preservation cost due to hot wind long distant conveying are avoided, thereby providing the light combustion-supporting wind and combustion gas integrated heat storing burner with incomparable advantages compared with traditional heat storing combustion.

Description

Light-duty combustion air, combustion gas integral type heat-accumulation combustor
One, technical field
The utility model belongs to the combustion plant of large-size chemical, metallurgical industry heat-treatment furnace, relates in particular to that a kind of product firing temperature is high, flexible and convenient operation, the light-duty combustion air of the saving energy, combustion gas integral type heat-accumulation combustor.
Two, background technology
Energy saving and environment friendly combustion system is the manufacturing important development direction of kiln, and therefore heat storage type combustion is more and more by should be on all kinds of kilns.The heat storage type combustion that kiln industry adopts at present generally adopts regenerator type, build one or more independently regenerator at workshop, be used for store heat, be switched on each burner of body of heater by pipeline, to transfer heat in kiln, also store the heat of taking out of in flue gas, thereby reach the object that reduces energy consumption simultaneously.Although this structure has been saved the energy to a certain extent, but still exist floor space large, long construction period, one-time investment is large, and the long distance of flue gas and combustion air is carried the problems such as the thermal losses that causes.
Three, summary of the invention
The purpose of this utility model is to provide that a kind of structure is light-duty rationally, operation control easy, automation control accuracy is high, the significant high efficiency combustion device of energy-saving effect.
Technical solution adopted in the utility model is: it is made up of parts such as accumulation of heat casing, combustion-supporting air compartment and high pressure cyclone burner blocks, in accumulation of heat casing, be provided with heat storage and thermal insulation separation thermosphere, its one end is provided with combustion-supporting air compartment, the other end connects high pressure cyclone burner block, top is provided with the combustion gas arm that portals corresponding with high pressure cyclone burner block gas injection, heat storage front end is corresponding with the combustion air ejiction opening of high pressure cyclone burner block, and is provided with access door and blast connection in combustion-supporting air compartment end.In high-pressure swirl flaming brick, be provided with the combustion air ejiction opening that the densely covered gas injection in a row of horizontal direction low discharge portals and is horizontal ellipse shape hole.
The beneficial effects of the utility model are, not only every brunched burner nozzle arranges independently regenerator and a watertight aircase independently, rational in infrastructure, has avoided the long distance of hot blast to carry the thermal loss causing, and significantly reduces pipe insulation expense; And the conversion of heat supply and heat-accumulating process realized full-automatic interlocked control, can, according to the requirement of body of heater and product heating, in setting-up time, commutate by reversal valve, automaticity is high, flexible and convenient operation.And the form that every cover heat-accumulating burner all adopts oval air outlet and multiple small sircle hole to supply gas has more increased the mixing of combustion air and combustion gas, make fuel gas buring more abundant, saving effect is more remarkable.
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Four, accompanying drawing explanation
Fig. 1 is the main TV structure schematic diagram of the utility model;
Fig. 2 is the utility model plan structure schematic diagram;
Fig. 3 is the left TV structure schematic diagram of the utility model;
Fig. 4 is that the utility model uses state control principle schematic diagram.
In figure: 1 is blast connection, 2 is combustion-supporting air compartment, 3 combustion gas arms, 4 is accumulation of heat casing, 5 is thermal insulation separation thermosphere, 6 is heat storage, 7 is flaming brick, 8 portal for gas injection, 9 is combustion air ejiction opening, 10 is access door, 11 is pneumatic operated valve, 12 is orifice flowmeter, 13 is light-duty combustion air, combustion gas integral type heat-accumulation combustor, 14 is fire box temperature test point, 15 is flue-gas temperature test point, 16 is burner hearth, 17 is two four-way fume reversing apparatus, 18 is combustion fan, 19 is smoke exhaust fan, 20 is pressure sensor, 21 is smoke exhaust pipe, 22 is combustion air arm, 23 is combustion air supervisor, 24 is combustion gas supervisor, 25 is manual ball valve, 26 is burning fireworks.
Five, the specific embodiment
As shown in Figure 4, push away steel stove as example to undertake the construction of one 100 tons/hour.Pushing away steel stove entirety is made up of body of heater, the combustion system etc. of steel structure frame, refractory material laying.Combustion system is mainly made up of heat-accumulation combustor, pipe-line system and two four-way fume reversing apparatus etc.On the kiln wall of burner hearth 16 both sides, respectively establish 40 heat-accumulation combustors, every 8 are divided into one group.When one group of one side burning, another group smoke evacuation accumulation of energy, now two of offside groups of actions that burner is corresponding are respectively smoke evacuation accumulation of energy and burning.In burner hearth 16, be provided with fire box temperature test point 14, at the other flue-gas temperature test point 15 that is provided with of the combustion air arm 22 that connects accumulation of heat burner simultaneously.As Fig. 1, Fig. 2, shown in Fig. 3, heat-accumulation combustor 13 is by accumulation of heat casing 4, the compositions such as combustion-supporting air compartment 2 and high pressure cyclone burner block 7, in accumulation of heat casing 4, be provided with cellular heat storage 6 and thermal insulation separation thermosphere 5, its one end is provided with combustion-supporting air compartment 2, the other end connects high pressure cyclone burner block 7, top is provided with and the high pressure cyclone burner block 7 gas injections 8 corresponding combustion gas arms 3 that portal, heat storage 6 front ends are corresponding with the combustion air ejiction opening 9 of high pressure cyclone burner block 7, high-pressure swirl flaming brick 7 is made up of heavy castable, inside be provided with the horizontal direction low discharge gas injection in a row that gathers and portal 8 and be the combustion air ejiction opening 9 in horizontal ellipse shape hole.Be provided with access door 10 and blast connection 1 in combustion-supporting air compartment 2 ends, be connected with two four-way fume reversing apparatus 17 that the smoke exhaust fan 19 that is connected with smoke evacuation supervisor 21 is connected with the combustion fan 18 that is connected with combustion air supervisor 23 by combustion air arm 22.Combustion gas arm 3 communicates with the combustion gas supervisor 24 who is provided with orifice flowmeter 12 by combustion gas pneumatic operated valve 11, and its front end is placed in high-pressure swirl flaming brick 7 with gas injection and portals and 8 closely cooperate.While implementing the utility model, on the kiln wall of burner hearth 16 both sides, respectively establish two groups of heat-accumulation combustors 13, the combustion air arm 22 of every group is by two import and export of three-way connection connecting pipe and two four-way fume reversing apparatus 17, and another two import and export are connected with smoke exhaust fan 19 and combustion fan 18 respectively.When two four-way fume reversing valves 17 are during in position as shown in Figure 4, combustion fan 18 is blown to a group of burner hearth left side and another group heat-accumulation combustor 13 on right side, through heat storage 6, combustion air temperature is raise, combustion gas pneumatic operated valve 11 is opened, and heat-accumulation combustor 13 forms burning fireworks to spraying combustion gas and combustion air in burner hearth from high-pressure swirl flaming brick 7 is interior.Now the combustion air arm 22 of the heat-accumulation combustor 13 of corresponding kiln wall opposite side is communicated with smoke exhaust fan 19 by two four-way fume reversing valves 17, from the hot flue gas of the interior extraction of burner hearth 16, makes heat storage 6 accumulation of energys in the heat-accumulation combustor 13 on right side.After 40 second time, the air cylinder driven reversal valve chip of two four-way fume reversing valves 17 rotates 90 °, and it is forwarded on another working position.One group of so corresponding accumulation of energy burner 13 transfers smoke evacuation state to by fired state, and one group transfers fired state to by smoke evacuation state, and one group of corresponding another side accumulation of energy burner transfers fired state to by smoke evacuation state, and one group transfers smoke evacuation state to by fired state.Thereby complete the commutation action of primary combustion device fired state.Through 40 second time, air cylinder driven reversal valve blade reversed 90 ° so again, then completed the conversion of one action state.So circulation, according to the requirement of different product firing rate, fuel gases calorific value difference, smoke evacuation and combustion fan pressure condition, heat-accumulating burner, by frequency commutation accumulation of heat and heat supply with different, reaches energy-saving and cost-reducing more than 15%.

Claims (2)

1. a light-duty combustion air, combustion gas integral type heat-accumulation combustor, it comprises accumulation of heat casing (4), combustion-supporting air compartment (2) and high pressure cyclone burner block (7), it is characterized in that: in accumulation of heat casing (4), be provided with heat storage (6) and thermal insulation separation thermosphere (5), its one end is provided with combustion-supporting air compartment (2), the other end connects high pressure cyclone burner block (7), top is provided with and high pressure cyclone burner block (7) gas injection combustion gas arm (3) corresponding to (8) that portal, heat storage (6) front end is corresponding with the combustion air ejiction opening (9) of high pressure cyclone burner block (7), and be provided with access door (10) and blast connection (1) in combustion-supporting air compartment (2) end.
2. light-duty combustion air according to claim 1, combustion gas integral type heat-accumulation combustor, is characterized in that: in high-pressure swirl flaming brick (7), be provided with the combustion air ejiction opening (9) that the densely covered gas injection in a row of horizontal direction low discharge portals (8) and is horizontal ellipse shape hole.
CN201320809295.8U 2013-12-07 2013-12-07 Light combustion-supporting wind and combustion gas integrated heat storing burner Expired - Fee Related CN203628646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320809295.8U CN203628646U (en) 2013-12-07 2013-12-07 Light combustion-supporting wind and combustion gas integrated heat storing burner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320809295.8U CN203628646U (en) 2013-12-07 2013-12-07 Light combustion-supporting wind and combustion gas integrated heat storing burner

Publications (1)

Publication Number Publication Date
CN203628646U true CN203628646U (en) 2014-06-04

Family

ID=50815120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320809295.8U Expired - Fee Related CN203628646U (en) 2013-12-07 2013-12-07 Light combustion-supporting wind and combustion gas integrated heat storing burner

Country Status (1)

Country Link
CN (1) CN203628646U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105318330A (en) * 2014-07-16 2016-02-10 鞍钢股份有限公司 Burner and method capable of improving combustion effect of heat storage type furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105318330A (en) * 2014-07-16 2016-02-10 鞍钢股份有限公司 Burner and method capable of improving combustion effect of heat storage type furnace

Similar Documents

Publication Publication Date Title
CN203432296U (en) Energy-saving ceramic kiln
CN202101401U (en) Novel hot air furnace
CN103940221A (en) Novel energy-saving kiln
CN201517887U (en) Ceramic kiln
CN201462837U (en) Light sectional type heat accumulation burner
CN201715543U (en) Heat accumulating type heat exchanger
CN201852093U (en) Air single heat-storage fuel continuous feeding type burner nozzle
CN203534159U (en) Atmosphere protection black brick tunnel kiln
CN203628646U (en) Light combustion-supporting wind and combustion gas integrated heat storing burner
CN203163478U (en) Novel energy-saving kiln
CN104230187B (en) A kind of burning beam using preheated-combustion-supporting wind
CN202928349U (en) Series-connection industrial furnace
CN101846447A (en) Down draft kiln
CN106123590A (en) Natural gas shuttle-type power-saving kiln
CN203382777U (en) Hot-blast furnace
CN201636873U (en) Pre-combustor for tube-type heating furnace
CN201925932U (en) Novel air-single regenerative and air-gas dual regenerative general heating furnace
CN101413039B (en) Continuous air blast type strong wind warm blast furnace
CN207231215U (en) A kind of intelligent natural gas kiln with novel energy-conserving technology
CN207760402U (en) A kind of novel steel wire annealing device
CN202246727U (en) High-blast-temperature combinative heat exchange system of blast furnace
CN203489270U (en) Novel combustor
CN202119278U (en) Full-automatic rotating timed soot-blowing and scale-blowing energy saver
CN202643723U (en) Grill-free double-preheating top combustion hot-blast stove
CN202171254U (en) Air supplying and smoke discharging device of boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20151207

EXPY Termination of patent right or utility model