CN203628639U - Stokehold material feeding device suitable for biomass raw material with high water content - Google Patents

Stokehold material feeding device suitable for biomass raw material with high water content Download PDF

Info

Publication number
CN203628639U
CN203628639U CN201320844950.3U CN201320844950U CN203628639U CN 203628639 U CN203628639 U CN 203628639U CN 201320844950 U CN201320844950 U CN 201320844950U CN 203628639 U CN203628639 U CN 203628639U
Authority
CN
China
Prior art keywords
raw material
blanking
pipe
stokehold
high water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320844950.3U
Other languages
Chinese (zh)
Inventor
景元涿
翟世辉
闫永秀
孟辉
刘桂才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jinfu Environment Engineering Co ltd
Original Assignee
ZKCH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZKCH Co Ltd filed Critical ZKCH Co Ltd
Priority to CN201320844950.3U priority Critical patent/CN203628639U/en
Application granted granted Critical
Publication of CN203628639U publication Critical patent/CN203628639U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a stokehold material feeding device suitable for a biomass raw material with high water content. The stokehold material feeding device comprises a material warehouse and a material blanking pipe, wherein a plurality of material unloading augers are arranged at the bottom of the material warehouse; one end of each material unloading auger is connected with a motor, and the other end of each material unloading auger is connected with the material blanking pipe; an electric turning plate door is arranged on the lower part of the material blanking pipe; the bottom of the material blanking pipe is connected with a fluidized bed boiler through a tilted pipe; a material blowing air inlet is formed in the top of the tilted pipe. The multiple material unloading augers are positioned at the bottom of the material warehouse, can be used for unloading the material uniformly, have a quantitative metering function, have a disturbance effect on the material in the material warehouse and guarantee no dead angle of material blanking; the electric turning plate door is closed during material interruption, so that flame can be prevented from running back, the material in the warehouse can be protected, and the outbreak of fire can be avoided; the material blowing air inlet generates negative pressure at an intersection between the tilted material blanking pipe and the perpendicular material blanking pipe, so that the blanking material can successfully fall off along the tilted pipe under the action of hot air; meanwhile, by the adoption of primary high-temperature air, the raw material can be preheated and dried in a successful blanking process.

Description

Be applicable to the stokehold feed arrangement of high water-contained biomass raw material
Technical field
The utility model relates to feed arrangement, is specifically related to a kind of stokehold feed arrangement that is applicable to high water-contained biomass raw material.
Background technology
The easy scaffold of biomass material, for moisture content higher light industry biomass castoff and waste residue, the stability of its charging blanking becomes problem more, feeding system unstable, to directly cause combustion conditions unstable, produce steam unstable, simultaneously, fracture easily causes tempering, and flame anti-channeling causes danger.
Summary of the invention
The purpose of this utility model is to provide a kind of blanking stable, avoids flame anti-channeling, raw material is carried out to the stokehold feed arrangement of the applicable high water-contained biomass raw material of effective preheating and drying.
The utility model solves the technical scheme that its technical problem adopts: the stokehold feed arrangement that is applicable to high water-contained biomass raw material, comprise feed bin and material blanking tube, bin bottom is provided with multiple discharging augers, one end of each discharging auger is all connected with motor, the other end of discharging auger is connected with material blanking tube, the bottom of material blanking tube is provided with electric rotating plate door, and the bottom of material blanking tube is connected with fluidized-bed combustion boiler by inclined tube, and the top of inclined tube is provided with blows material wind entrance.
Particularly, the bottom of described material blanking tube is fixedly connected on the outer wall of fluidized-bed combustion boiler, to guarantee material blanking tube firm stable.
Particularly, the junction of described inclined tube and fluidized-bed combustion boiler is provided with raw material and enters fire door.
Particularly, the up-narrow and down-wide funnel type that is down of described feed bin, angle of inclination is greater than solid accumulation angle, guarantees that material do not pile up.
Particularly, the top of described feed bin is provided with charging aperture.
The utlity model has following beneficial effect: discharging auger is positioned at bin bottom, and be provided with multiplely, evenly discharging has function of measuring fixed amount, and the material in feed bin is had to perturbation action, guarantees that blanking is without dead angle; Electric rotating plate door is closed in the time of fracture, blocking-up flame anti-channeling, and the material in protection feed bin, avoids breaking out of fire; Blow material wind entrance and form negative pressure at blanking inclined tube with vertical material blanking tube intersection, guarantee blanking under hot blast effect along the smooth and easy whereabouts of inclined tube, adopt wind of high temperature simultaneously, in the smooth and easy dropping process of raw material, realize preheating and be dried.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is that the A of Fig. 1 is to view.
In figure, 1, charging aperture, 2, feed bin, 3, motor, 4, discharging auger, 5, material blanking tube, 6, electric rotating plate door, 7, blow material wind entrance, 8, raw material enters fire door, 9, fluidized-bed combustion boiler, 10, inclined tube.
The specific embodiment
By reference to the accompanying drawings the utility model is described in further detail now.
As shown in Figure 1 and Figure 2, be applicable to the stokehold feed arrangement of high water-contained biomass raw material, comprise feed bin 2 and material blanking tube 5, feed bin 2 bottoms are provided with multiple discharging augers 4, one end of each discharging auger 4 is all connected with motor 3, and the other end of discharging auger 4 is connected with material blanking tube 5, and the bottom of material blanking tube 5 is provided with electric rotating plate door 6, the bottom of material blanking tube 5 is connected with fluidized-bed combustion boiler 9 by inclined tube 10, and the top of inclined tube 10 is provided with blows material wind entrance 7.
Particularly, the bottom of described material blanking tube 5 is fixedly connected on the outer wall of fluidized-bed combustion boiler 9.
Particularly, described inclined tube 10 is provided with raw material with the junction of fluidized-bed combustion boiler 9 and enters fire door 8.
Particularly, the up-narrow and down-wide funnel type that is down of described feed bin 2.
Particularly, the top of described feed bin 2 is provided with charging aperture 1.
Discharging auger is positioned at bin bottom, and is provided with multiplely, and evenly discharging has function of measuring fixed amount, and the material in feed bin is had to perturbation action, guarantees that blanking is without dead angle; Electric rotating plate door is closed in the time of fracture, blocking-up flame anti-channeling, and the material in protection feed bin, avoids breaking out of fire; Blow material wind entrance and form negative pressure at blanking inclined tube with vertical material blanking tube intersection, guarantee blanking under hot blast effect along the smooth and easy whereabouts of inclined tube, adopt wind of high temperature simultaneously, in the smooth and easy dropping process of raw material, realize preheating and be dried.
The utility model is not limited to above-mentioned embodiment, and anyone should learn the structural change of making under enlightenment of the present utility model, every with the utlity model has identical or close technical scheme, within all falling into protection domain of the present utility model.
Technology, shape, structure part that the utility model is not described in detail are known technology.

Claims (5)

1. be applicable to the stokehold feed arrangement of high water-contained biomass raw material, comprise feed bin and material blanking tube, it is characterized in that, bin bottom is provided with multiple discharging augers, one end of each discharging auger is all connected with motor, and the other end of discharging auger is connected with material blanking tube, and the bottom of material blanking tube is provided with electric rotating plate door, the bottom of material blanking tube is connected with fluidized-bed combustion boiler by inclined tube, and the top of inclined tube is provided with blows material wind entrance.
2. the stokehold feed arrangement that is applicable to high water-contained biomass raw material according to claim 1, is characterized in that, the bottom of described material blanking tube is fixedly connected on the outer wall of fluidized-bed combustion boiler.
3. the stokehold feed arrangement that is applicable to high water-contained biomass raw material according to claim 1, is characterized in that, the junction of described inclined tube and fluidized-bed combustion boiler is provided with raw material and enters fire door.
4. the stokehold feed arrangement that is applicable to high water-contained biomass raw material according to claim 1, is characterized in that the up-narrow and down-wide funnel type that is down of described feed bin.
5. the stokehold feed arrangement that is applicable to high water-contained biomass raw material according to claim 1, is characterized in that, the top of described feed bin is provided with charging aperture.
CN201320844950.3U 2013-12-20 2013-12-20 Stokehold material feeding device suitable for biomass raw material with high water content Expired - Lifetime CN203628639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320844950.3U CN203628639U (en) 2013-12-20 2013-12-20 Stokehold material feeding device suitable for biomass raw material with high water content

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320844950.3U CN203628639U (en) 2013-12-20 2013-12-20 Stokehold material feeding device suitable for biomass raw material with high water content

Publications (1)

Publication Number Publication Date
CN203628639U true CN203628639U (en) 2014-06-04

Family

ID=50815113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320844950.3U Expired - Lifetime CN203628639U (en) 2013-12-20 2013-12-20 Stokehold material feeding device suitable for biomass raw material with high water content

Country Status (1)

Country Link
CN (1) CN203628639U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115368924A (en) * 2022-09-07 2022-11-22 河南省科学院 Large-scale living beings baking furnace charge-in system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115368924A (en) * 2022-09-07 2022-11-22 河南省科学院 Large-scale living beings baking furnace charge-in system
CN115368924B (en) * 2022-09-07 2023-11-03 河南省科学院 Large-scale living beings baking furnace feed system

Similar Documents

Publication Publication Date Title
CN103756712B (en) Biomass quick cracking device based on internal-external circulation spouted fluidized bed
CN105003910B (en) A kind of biomass molding fuel central heating device
CN203628639U (en) Stokehold material feeding device suitable for biomass raw material with high water content
CN103217003B (en) Layered energy-saving dryer
CN205174809U (en) A buggy hot -blast furnace for brown coal, coal slime are dried
CN104180386A (en) Biomass boiler feeder
CN205014408U (en) Boiler feed system
CN208587921U (en) A kind of cyclone dryer and biomass fuel drying device
CN105157377A (en) Fly ash drying machine
CN202705042U (en) Tank type carbon calcining furnace
CN104456547A (en) Feeding structure for suspension combustion biomass boiler
CN205174403U (en) Combustion apparatus's slag extractor constructs
CN207749052U (en) A kind of production system suitable for chicken manure drying granulation
CN103880261B (en) A kind of circulating fluidized bed air drying system
CN105202564A (en) Boiler feeding device
CN104456546A (en) Suspension combustion biomass particle feeding structure
CN201589250U (en) Multifunctional biomass boiler
CN204063101U (en) Biomass boiler feeder
CN203234018U (en) Flow guide device for pneumatic drying
CN207455622U (en) A kind of biomass boiler feeding device
CN203159245U (en) Solid raw material feeding device of fluidized bed furnace for producing titanium tetrachloride
CN204227834U (en) A kind of warehouse for drying of alumina balls
CN204268900U (en) One is stablized charging and can dry hopper
CN103301921A (en) Energy-saving and emission-reducing device and method for industrial vertical mill
CN203980923U (en) The residual heat boiler of steel ball dedusting type ore heat furnace that keeps steel ball totebox balance

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Jing Yuanzhuo

Inventor after: Zhai Shihui

Inventor after: Yan Yongxiu

Inventor after: Meng Hui

Inventor after: Liu Guicai

Inventor before: Jing Yuanzhuo

Inventor before: Zhai Shihui

Inventor before: Yan Yongxiu

Inventor before: Meng Hui

Inventor before: Liu Guicai

C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Meng Hui

Inventor after: Jing Yuanzhuo

Inventor before: Jing Yuanzhuo

Inventor before: Zhai Shihui

Inventor before: Yan Yongxiu

Inventor before: Meng Hui

Inventor before: Liu Guicai

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160215

Address after: 250000 Shandong Province, Lixia District of Ji'nan city by Lushang Olympic city ten Road No. 9777 Building No. 3 room 2007

Patentee after: SHANDONG JINFU ENVIRONMENT ENGINEERING CO.,LTD.

Address before: 361000, Fujian, Xiamen province Jinshan District, Jinshan street, after the pit West pan Club No. 308 D009

Patentee before: ZKCH Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20140604

CX01 Expiry of patent term