CN203626381U - Sand-proof shed assembly - Google Patents

Sand-proof shed assembly Download PDF

Info

Publication number
CN203626381U
CN203626381U CN201320784661.9U CN201320784661U CN203626381U CN 203626381 U CN203626381 U CN 203626381U CN 201320784661 U CN201320784661 U CN 201320784661U CN 203626381 U CN203626381 U CN 203626381U
Authority
CN
China
Prior art keywords
arc
sand prevention
frameworks
interpolation frame
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320784661.9U
Other languages
Chinese (zh)
Inventor
刘攀
尹会军
许铭
田贵国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN DONG FANG XIAN KE PETROLEUM MACHINERY CO Ltd
Original Assignee
TIANJIN DONG FANG XIAN KE PETROLEUM MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN DONG FANG XIAN KE PETROLEUM MACHINERY CO Ltd filed Critical TIANJIN DONG FANG XIAN KE PETROLEUM MACHINERY CO Ltd
Priority to CN201320784661.9U priority Critical patent/CN203626381U/en
Application granted granted Critical
Publication of CN203626381U publication Critical patent/CN203626381U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a sand-proof shed assembly, which consists of four groups of sand-proof sheds. The four groups of sand-proof sheds respectively comprise two arc-shaped primary frameworks, two arc-shaped secondary frameworks and a square frame structure, wherein the square frame structure consists of the two arc-shaped primary frameworks and two long insertion frames; middle parts of each square frame are connected and reinforced through the arc-shaped secondary frameworks and short insertion frames; a lower pillar is connected with the bottom part of each arc-shaped primary framework in a foldable manner; the arc-shaped primary frameworks, the long insertion frames, the short insertion frames and the arc-shaped secondary frameworks are respectively connected through hinge pins; the arc-shaped primary frameworks and the arc-shaped secondary frameworks are all arc-shaped frameworks in structure. The sand-proof shed assembly provided by the utility model has the beneficial effects that only canvas needs to be hung, so that overall weight is reduced, and the cost is reduced; the weldable span of an arc-shaped house is large, and the overall cover area is larger; all components can be installed at a low level, and are lifted once so as to reduce high-altitude operations; a hinge pin and insertion-type structure is adopted between the components, so that installation is convenient.

Description

A kind of sand prevention canopy assembly
Technical field
The utility model belongs to sand prevention canopy technical field, especially relates to a kind of sand prevention canopy assembly.
Background technology
Out of doors in working environment, sometimes need to build interim sand prevention, keep out the wind and the shed of sunshade, be called sand prevention canopy.
In existing technology, there are some shortcomings in the sand prevention canopy generally using, for example, complexity is installed, and needs welding sheet iron to block, and cost is high, and weight is large is inconvenient to transport, the problems such as husky canopy limited space.
Summary of the invention
Problem to be solved in the utility model is to provide a kind of easy for installation, the sand prevention canopy assembly that cost is low.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
A kind of sand prevention canopy assembly, formed by four groups of sand prevention canopies, every group of sand prevention canopy comprises two arc main framings and two secondary skeletons of arc, between two arc main framings, connect by long interpolation frame, between the secondary skeleton of arc main framing and arc, connect by short interpolation frame, lower pillar stand is fixed on arc main framing, and by strut reinforcement by connection; Two arc main framings and two frame structures that long interpolation frame forms, square frame mid portion carries out reinforcement by connection by the secondary skeleton of arc and short interpolation frame again; The collapsible lower pillar stand that is connected with in bottom of arc main framing, the connection between described arc main framing, long interpolation frame, short interpolation frame, the secondary skeleton of arc is all to connect by bearing pin; The structure of the secondary skeleton of described arc main framing and arc is bent frame.
Preferably, described short interpolation frame is made up of stull, perpendicular support and diagonal brace, between the parallel stull of same perpendicular, is fixedly connected with by perpendicular support, and diagonal brace is located between parallel stull and plays reinforcement effect, stull two ends welding bearing pin; The secondary skeleton of described arc main framing and arc is provided with intubate, and the bearing pin of described stull end inserts in intubate.
Preferably, long lower short on described bearing pin.
Preferably, described two groups of sand prevention canopies connect by U-bolt.
Preferably, formed by four groups of sand prevention canopies.
Advantage and the good effect that the utlity model has are:
Sand prevention, keep out the wind and only need hang canvas in ceiling portion and surrounding when sunshade, blocking without welding sheet iron, not only reducing overall weight and also reduced the cost of product;
Arc room not only span attractive in appearance but also welding is large, and corresponding overall area coverage is larger;
All parts can be installed by low level, once hoist, and reduce work high above the ground;
Between every group of each parts of sand prevention canopy, all adopt bearing pin and plug-in mounting structure, non-bolted joint, easy for installation;
Interpolation frame is connected and fixed each arc link by bearing pin short under upper length, when installation, insert in the intubate of each arc link prior to lower end bearing pin because interpolation frame upper end bearing pin is long, only need two intubate of upper end to position, reduce the quantity of positioning jack, be more convenient to docking between each bearing pin and intubate.
Accompanying drawing explanation
Fig. 1 is the front elevation drawing of four groups of sand prevention canopies of the utility model;
Fig. 2 be four groups of sand prevention canopies of the utility model lateral view;
Fig. 3 is the utility model arc link and the lower pillar stand schematic diagram when folding;
Fig. 4 is the syndeton of interpolation frame of the present utility model and arc link.
In figure:
1, arc main framing 2, lower pillar stand 3, stull
4, perpendicular support 5, diagonal brace 6, bearing pin
7, intubate 8, short interpolation frame 9, the secondary skeleton of arc
10, strut 11, long interpolation frame
The specific embodiment
As shown in Figures 1 to 4:
A kind of sand prevention canopy of the utility model assembly, formed by four groups of sand prevention canopies, every group of sand prevention canopy comprises two arc main framings 1 and two secondary skeletons 9 of arc, between two arc main framings 1, connect by long interpolation frame 11, between the secondary skeleton 9 of arc main framing 1 and arc, connect by short interpolation frame 8, and by strut 10 reinforcement by connection; Two arc main framings 1 and two frame structures that long interpolation frame 11 forms, square frame mid portion carries out reinforcement by connection by the secondary skeleton 9 of arc and short interpolation frame 8 again; The collapsible lower pillar stand 2 that is connected with in bottom of arc main framing 1, the connection between described arc main framing 1, long interpolation frame 11, short interpolation frame 8, the secondary skeleton 9 of arc is all to connect by bearing pin 6; The structure of the secondary skeleton 9 of described arc main framing 1 and arc is bent frame;
Described short interpolation frame 8 comprises stull 3, perpendicular support 4 and diagonal brace 5, between the parallel stull 3 of same perpendicular, is fixedly connected with by perpendicular support 4, and diagonal brace 5 is located between parallel stull 3 and plays reinforcement effect, and stull 3 two ends welding bearing pins 6 are long lower short on described bearing pin 6; Described arc link 1 is provided with intubate 7, and the bearing pin 6 of described stull 3 ends inserts in the intubate 7 of arc main framing 1 and the secondary skeleton 9 of arc; Described two groups of sand prevention canopies connect by U-bolt.
The course of work of this example:
Whole sand prevention canopy assembly is formed by connecting by U-bolt by the sand prevention canopy on four groups of arc roofs, sand prevention, keep out the wind and when sunshade on roof and surrounding hang canvas; Every group of sand prevention canopy comprises two arc main framings 1 and two secondary skeletons 9 of arc, between the secondary skeleton 9 of arc main framing 1 and arc, be connected with long interpolation frame 11 by short interpolation frame 8, lower pillar stand is fixed on arc main framing 1, can be folding with arc main framing 1 after together with transportation; When every group of sand prevention canopy installed, first on assembling arc roof, ground, again each lower pillar stand 2 is lain in to ground, be connected with the roof after assembling by bearing pin 6, and one section of strut 10 is also arranged on roof, then by the equipment that hoists, roof is hoisted, then the other end of strut 10 is connected by bearing pin 6 with lower pillar stand 2, be finally placed in desired position.
Short interpolation frame 8 is connected and fixed each arc main framing 1 and the secondary skeleton 9 of arc by bearing pin short under upper length 6, when installation, insert in each intubate 7 prior to lower end bearing pin 6 because upper end bearing pin 6 is long, so only need two intubate 7 of upper end to position, reduce the quantity of positioning jack, be more convenient to docking between each bearing pin 6 and intubate 7; Tangent because of the blanking trimming of the welding hole of bearing pin 6 and the rectangular tube of interpolation frame stull 3, the corresponding increase of expanding slot after welding between the secondary skeleton 9 of short interpolation frame 8 two ends and arc main framing 1 and arc, is convenient to connect adjustment more.
Above an embodiment of the present utility model is had been described in detail, but described content is only preferred embodiment of the present utility model, can not be considered to for limiting practical range of the present utility model.All equalization variation and improvement etc. of doing according to the utility model application range, within all should still belonging to patent covering scope of the present utility model.

Claims (5)

1. a sand prevention canopy assembly, it is characterized in that: formed by four groups of sand prevention canopies, every group of sand prevention canopy comprises two arc main framings and two secondary skeletons of arc, between two arc main framings, connect by long interpolation frame, between the secondary skeleton of arc main framing and arc, connect by short interpolation frame, lower pillar stand is fixed on arc main framing, and by strut reinforcement by connection; Two arc main framings and two frame structures that long interpolation frame forms, square frame mid portion carries out reinforcement by connection by the secondary skeleton of arc and short interpolation frame again; The collapsible lower pillar stand that is connected with in bottom of arc main framing, the connection between described arc main framing, long interpolation frame, short interpolation frame, the secondary skeleton of arc is all to connect by bearing pin; The structure of the secondary skeleton of described arc main framing and arc is bent frame.
2. sand prevention canopy assembly according to claim 1, it is characterized in that: described short interpolation frame is made up of stull, perpendicular support and diagonal brace, between the parallel stull of same perpendicular, be fixedly connected with by perpendicular support, diagonal brace is located between parallel stull and plays reinforcement effect, stull two ends welding bearing pin; The secondary skeleton of described arc main framing and arc is provided with intubate, and the bearing pin of described stull end inserts in intubate.
3. sand prevention canopy assembly according to claim 1 and 2, is characterized in that: long lower short on described bearing pin.
4. sand prevention canopy assembly according to claim 1, is characterized in that: described two groups of sand prevention canopies connect by U-bolt.
5. sand prevention canopy assembly according to claim 1, is characterized in that: be made up of four groups of sand prevention canopies.
CN201320784661.9U 2013-11-30 2013-11-30 Sand-proof shed assembly Expired - Fee Related CN203626381U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320784661.9U CN203626381U (en) 2013-11-30 2013-11-30 Sand-proof shed assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320784661.9U CN203626381U (en) 2013-11-30 2013-11-30 Sand-proof shed assembly

Publications (1)

Publication Number Publication Date
CN203626381U true CN203626381U (en) 2014-06-04

Family

ID=50812872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320784661.9U Expired - Fee Related CN203626381U (en) 2013-11-30 2013-11-30 Sand-proof shed assembly

Country Status (1)

Country Link
CN (1) CN203626381U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653590A (en) * 2018-12-27 2019-04-19 宁波康玛投资有限公司 A kind of collapsible tent

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653590A (en) * 2018-12-27 2019-04-19 宁波康玛投资有限公司 A kind of collapsible tent

Similar Documents

Publication Publication Date Title
CN205918220U (en) Prevent ponding tent frame
CN206090840U (en) Room is folded to full position rail mounted
CN204139322U (en) A kind of glass sunlight house
CN203626381U (en) Sand-proof shed assembly
CN205063520U (en) Combined supporting frame with adjustable
CN203416676U (en) Single-body steel frame greenhouse
CN205747445U (en) The outer machine suspension strut structure of grid basket ceiling type air conditioner
CN205694620U (en) A kind of folding planting greenhouse ceiling props up support component
CN209277385U (en) Collapsible wallboard
CN207846810U (en) A kind of novel ceiling applied on steel construction ceiling framework
CN207890943U (en) The combined attachment device of tower crane
CN207646996U (en) A kind of square set
CN206158334U (en) Screw articulates formula push -and -pull covering or awning on a car, boat, etc. room
CN205955363U (en) Quick combination tent that expandes
CN210317346U (en) Supporting net convenient to assemble for coal mine supporting
CN205275070U (en) Wedge type adheres to frame bracing structure
CN211114818U (en) Concrete window opening reentrant corner prevents mould construction equipment that rises
CN204098605U (en) A kind of Novel tent cage construction
CN202969647U (en) Self balance point type curtain wall
CN205206036U (en) Machine room
CN206408809U (en) A kind of triangle joint structure for glass sunlight house
CN208950442U (en) A kind of tent waterproof skeleton
CN205330221U (en) Machine room
CN205564205U (en) Stand -type advertising light boxes
CN205677289U (en) A kind of Moveable assembled paulin room

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20161130

CF01 Termination of patent right due to non-payment of annual fee