CN203625759U - Clamping-plate connecting device of overpass support frame - Google Patents

Clamping-plate connecting device of overpass support frame Download PDF

Info

Publication number
CN203625759U
CN203625759U CN201320520445.3U CN201320520445U CN203625759U CN 203625759 U CN203625759 U CN 203625759U CN 201320520445 U CN201320520445 U CN 201320520445U CN 203625759 U CN203625759 U CN 203625759U
Authority
CN
China
Prior art keywords
clamping plate
top rail
bracing frame
overline bridge
lower transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320520445.3U
Other languages
Chinese (zh)
Inventor
王献红
姜福强
王刚
宗岩
王敬臣
范圣文
高伟
郭雪艳
郭学斌
李卫
刘家斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guanghan Electronic Technology Co ltd
Shandong Nollvetec Lightweight Equipment Co ltd
Original Assignee
SHANDONG GUANGHAN ELECTRONIC TECHNOLOGY Co Ltd
LONGKOU CONGLIN SINO-GERMANY CAR BODY SYSTEM ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG GUANGHAN ELECTRONIC TECHNOLOGY Co Ltd, LONGKOU CONGLIN SINO-GERMANY CAR BODY SYSTEM ENGINEERING Co Ltd filed Critical SHANDONG GUANGHAN ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN201320520445.3U priority Critical patent/CN203625759U/en
Application granted granted Critical
Publication of CN203625759U publication Critical patent/CN203625759U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a main bridge frame structure of an overpass, in particular to a clamping-plate connecting device of an overpass support frame. The clamping-plate connecting device comprises an upper crossbeam, a lower crossbeam, a vertical beam and oblique beams. Two ends of each of the upper crossbeam and the lower crossbeam are fixed on the support frame. The upper crossbeam and the lower crossbeam are in I-shaped connection through the vertical beam. One ends of the oblique beams are fixed at the joints of the upper crossbeam and vertical facade rods, and the other ends of the oblique beams are fixed at the joint of the vertical beam and the lower cross beam. The clamping-plate connecting device is reasonable in structure, high in stability, reliability and durability, uniform in overall effect and practical.

Description

Overline bridge bracing frame clamping plate linkage
Technical field
The utility model relates to the main portal structure of a kind of overline bridge, a kind of overline bridge bracing frame of special design clamping plate linkage.
Background technology
At present, " mouth " font aluminium alloys overline bridge is to adopt bracing frame and transition truss overlap joint truss form, and its main feature increases the bearing capacity of bridge, strengthens the stability of aluminium alloys overline bridge, guarantees not occur rocking after the installation of " mouth " font aluminium alloys overline bridge.
But in prior art, structure stress shakiness, easily occurs rocking, and adopts welding manner manufacture " mouth " font aluminium alloys overline bridge more mostly, and cost is higher, and the cycle is longer.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of overline bridge bracing frame clamping plate linkage that overcomes above-mentioned prior art defect.
The technical scheme that the utility model solves the problems of the technologies described above is as follows: a kind of overline bridge bracing frame clamping plate linkage, comprise top rail, lower transverse beam, vertical beam and cant beam, described top rail and the two ends of lower transverse beam are fixed in facade vertical rod, described top rail is " work " font and is connected with lower transverse beam by vertical beam, junction, the other end that described cant beam one end is fixed on top rail and facade vertical rod is fixed on the junction of vertical beam and lower transverse beam.
The beneficial effects of the utility model are: rational in infrastructure, stability, reliability and durability are high, and whole structure is neat and practical.
On the basis of technique scheme, the utility model can also do following improvement.
Further, between described vertical beam and top rail, be connected and connect by bolt.
Further, between described top rail, cant beam and facade vertical rod and lower transverse beam, vertical beam and cant beam, be connected by clamping plate.
Further, described overline bridge bracing frame clamping plate linkage is aluminum alloy material.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
In accompanying drawing, the list of parts of each label representative is as follows:
1, clamping plate, 2, top rail, 3, clamping plate, 4, vertical beam, 5, lower transverse beam, 6, clamping plate, 7, cant beam, 8, facade vertical rod.
The specific embodiment
Below in conjunction with accompanying drawing, principle of the present utility model and feature are described, example, only for explaining the utility model, is not intended to limit scope of the present utility model.
As shown in Figure 1, described overline bridge bracing frame clamping plate linkage comprises top rail 2, lower transverse beam 5, vertical beam 4 and cant beam 7, described top rail 2 and the two ends of lower transverse beam 5 are fixed in facade vertical rod 8, described top rail 2 is " work " font by vertical beam 4 and lower transverse beam 5 and is connected, and described cant beam 7 one end are fixed on top rail 2 and junction, the other end of facade vertical rod 8 and are fixed on the junction of vertical beam 4 and lower transverse beam 5.
Between described vertical beam 4 and top rail 2, be connected and connect by bolt, between described top rail 2, cant beam 4 and facade vertical rod 8 and lower transverse beam 5, vertical beam 4 and cant beam 7, be connected by clamping plate 1, clamping plate 3 and clamping plate 6.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (4)

1. overline bridge bracing frame clamping plate linkage, it is characterized in that, described overline bridge bracing frame clamping plate linkage comprises top rail, lower transverse beam, vertical beam and cant beam, described top rail and the two ends of lower transverse beam are fixed on bracing frame, described top rail is " work " font and is connected with lower transverse beam by vertical beam, junction, the other end that described cant beam one end is fixed on top rail and facade vertical rod is fixed on the junction of vertical beam and lower transverse beam.
2. overline bridge bracing frame clamping plate linkage according to claim 1, is characterized in that, between described vertical beam and top rail, is connected by bolt.
3. overline bridge bracing frame clamping plate linkage according to claim 1, is characterized in that, between described top rail, cant beam and facade vertical rod and lower transverse beam, vertical beam and cant beam, is connected by clamping plate.
4. according to the overline bridge bracing frame clamping plate linkage described in claim 1~3, it is characterized in that, described overline bridge bracing frame clamping plate linkage is aluminum alloy material.
CN201320520445.3U 2013-08-23 2013-08-23 Clamping-plate connecting device of overpass support frame Expired - Lifetime CN203625759U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320520445.3U CN203625759U (en) 2013-08-23 2013-08-23 Clamping-plate connecting device of overpass support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320520445.3U CN203625759U (en) 2013-08-23 2013-08-23 Clamping-plate connecting device of overpass support frame

Publications (1)

Publication Number Publication Date
CN203625759U true CN203625759U (en) 2014-06-04

Family

ID=50812251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320520445.3U Expired - Lifetime CN203625759U (en) 2013-08-23 2013-08-23 Clamping-plate connecting device of overpass support frame

Country Status (1)

Country Link
CN (1) CN203625759U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452037A (en) * 2013-08-23 2013-12-18 龙口丛林中德车体系统工程有限公司 Overpass support frame splint connecting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452037A (en) * 2013-08-23 2013-12-18 龙口丛林中德车体系统工程有限公司 Overpass support frame splint connecting device

Similar Documents

Publication Publication Date Title
CN203795829U (en) Hoop assembly
CN203487449U (en) Bridge bearing
CN203625759U (en) Clamping-plate connecting device of overpass support frame
CN203173749U (en) Assembled integral type vertical self-jacking device of hydraulic double-type crane tower
CN102966032B (en) A kind of structural member of aluminum alloy passenger foot-bridge
CN201334328Y (en) Lower support saddle component for ultra-large type tower crane
CN103452037A (en) Overpass support frame splint connecting device
CN202945540U (en) Aluminum alloy structural member for pedestrian overcrossing
CN203383138U (en) Aluminum alloy overbridge transition connection device
CN205046924U (en) Wind power generation tower with can flexible down tube of a stretch -draw
CN202881841U (en) Novel long-span pipe bridge structure
CN202790959U (en) Steel pipe truss structure based on aloft lateral support
CN103452038B (en) A kind of transition connection device for aluminum alloy pedestrian bridge
CN203293650U (en) Intelligent type full-automation printing aluminum profile structure device
CN208280708U (en) A kind of haywire bar for stablizing placement
CN201883728U (en) DC filter structural frame for converter station
CN205171347U (en) Purpose -built anti -wind pull rod frame of bridge
CN103680823A (en) Transformer rack
CN202466424U (en) Bridge support frame
CN203452182U (en) Continuous beam framed structure
CN203345974U (en) Upper supporting base of tower crane
CN203307994U (en) Cross section H-shaped steel stiff column
CN203160491U (en) Steel truss structure for floor plates
CN203553621U (en) Power transformation framework lattice beam sliding support
CN204530988U (en) A kind of large span lattice crane beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 265700 Longkou City Yantai Industrial Zone, Shandong

Co-patentee after: SHANDONG GUANGHAN ELECTRONIC TECHNOLOGY Co.,Ltd.

Patentee after: SHANDONG NOLLVETEC LIGHTWEIGHT EQUIPMENT CO.,LTD.

Address before: 264000 Longkou industrial zone, Yantai, Shandong

Co-patentee before: SHANDONG GUANGHAN ELECTRONIC TECHNOLOGY Co.,Ltd.

Patentee before: LONGKOU CONGLIN SINO-GERMAN VEHICLE SYSTEM ENGINEERING CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170418

Address after: 265705 Longkou City Yantai Industrial Zone, Shandong

Patentee after: SHANDONG NOLLVETEC LIGHTWEIGHT EQUIPMENT CO.,LTD.

Address before: 265700 Longkou City Yantai Industrial Zone, Shandong

Co-patentee before: SHANDONG GUANGHAN ELECTRONIC TECHNOLOGY Co.,Ltd.

Patentee before: SHANDONG NOLLVETEC LIGHTWEIGHT EQUIPMENT CO.,LTD.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140604