CN203601582U - Plane loading simulator - Google Patents

Plane loading simulator Download PDF

Info

Publication number
CN203601582U
CN203601582U CN201320737196.3U CN201320737196U CN203601582U CN 203601582 U CN203601582 U CN 203601582U CN 201320737196 U CN201320737196 U CN 201320737196U CN 203601582 U CN203601582 U CN 203601582U
Authority
CN
China
Prior art keywords
joint
interface
switch
contactless switch
contact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320737196.3U
Other languages
Chinese (zh)
Inventor
陈怦
申永刚
龙青润
王成
李飞存
白强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinese Flight Test Establishment
Original Assignee
Chinese Flight Test Establishment
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinese Flight Test Establishment filed Critical Chinese Flight Test Establishment
Priority to CN201320737196.3U priority Critical patent/CN203601582U/en
Application granted granted Critical
Publication of CN203601582U publication Critical patent/CN203601582U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Keying Circuit Devices (AREA)

Abstract

The utility model provides a plane loading simulator which can conveniently output wheel load aerial or ground simulation control signals according to needs. According to the technical scheme, a first contactor J1 control end, a second contactor J2 control end and a third contactor J3 control end are connected between a power source and the ground in parallel, a change-over switch E1 is connected with among the power source and the first contactor J1 control end, the second contactor J2 control end and the third contactor J3 control end in series, a power good-state switch E2 and a power good-state indicator light K1 are sequentially connected between the power source and the ground in series, and contacts of a change-over light K2 and a third contactor J3 are sequentially connected between the power source and the ground in series.

Description

Aircraft carrying simulator
Technical field
The utility model belongs to change-over swith, relates to a kind of aircraft carrying simulator.
Background technology
Aircraft has very high security and reliability, thus the ground simulation of being everlasting when the state of the related systems such as flight control system, avionics system, Weapon Fire-Control-System after aircraft lift-off, thereby whether consistent with design while checking each system to fly aloft.
Utility model content
The purpose of this utility model is: a kind of aircraft carrying simulator is provided, can exports easily as required wheel load in the air or ground simulation control signal.
The technical solution of the utility model is: a kind of aircraft carrying simulator, comprising:
First interface, the second interface;
Described first interface is provided with A, B, C, D, E, F, G, eight joints of H; Described the second interface is provided with a, b, c, d, e, f, g, eight joints of h;
Described first interface A joint one end is connected with analog machine, and the A joint other end is connected with second interface a joint one end, and the second interface a joint other end is connected with the first jack of the first micro-switch plug of aircraft;
Described first interface B joint one end is connected with analog machine, and the B joint other end is connected with second interface b joint one end, and the second interface b joint other end is connected with the second jack of the first micro-switch plug of aircraft;
Described first interface C joint one end is connected with analog machine, and the C joint other end is connected with second interface c joint one end, and the second interface c joint other end is connected with the 3rd jack of the first micro-switch plug of aircraft;
Described first interface D joint one end is connected with analog machine, and the D joint other end is connected with second interface d joint one end, and the second interface d joint other end is connected with the 4th jack of the first micro-switch plug of aircraft;
Described first interface E joint one end is connected with analog machine, and the E joint other end is connected with second interface e joint one end, and the second interface e joint other end is connected with the first jack of the second micro-switch plug of aircraft;
Described first interface F joint one end is connected with analog machine, and the F joint other end is connected with second interface f joint one end, and the second interface f joint other end is connected with the second jack of the second micro-switch plug of aircraft;
Described first interface G joint one end is connected with analog machine, and the G joint other end is connected with second interface g joint one end, and the second interface g joint other end is connected with the 3rd jack of the second micro-switch plug of aircraft;
Described first interface H joint one end is connected with analog machine, and the H joint other end is connected with second interface h joint one end, and the second interface h joint other end is connected with the 4th jack of the second micro-switch plug of aircraft;
Between first interface A joint and the second interface a joint, be serially connected with the first contact of the first contactless switch;
Between first interface B joint and the second interface b joint, be serially connected with the second contact of the first contactless switch;
Between first interface C joint and the second interface c joint, be serially connected with the 3rd contact of the first contactless switch;
Between first interface D joint and the second interface d joint, be serially connected with the 4th contact of the first contactless switch;
Between first interface E joint and the second interface e joint, be serially connected with the first contact of the second contactless switch;
Between first interface F joint and the second interface f joint, be serially connected with the second contact of the second contactless switch;
Between first interface G joint and the second interface g joint, be serially connected with the 3rd contact of the second contactless switch;
Between first interface H joint and the second interface h joint, be serially connected with the 4th contact of the second contactless switch;
The first contactless switch J1 control end, the second contactless switch J2 control end, the 3rd contactless switch J3 control end are connected in parallel between power supply and ground; Change-over swith E1 is connected between power supply and the first contactless switch J1 control end, the second contactless switch J2 control end, the 3rd contactless switch J3 control end; The good switch E2 of power supply and the good indicator lamp K1 of power supply are connected between power supply and ground successively; The contact of conversion lamp K2 and the 3rd contactless switch J3 is connected between power supply and ground successively.
The advantage that the utility model is created is: can facilitate as required, export accurately aerial or ground wheel load analog control signal.XX type aircraft has increased a front-wheel carrying switch with the XX series aircraft of safeguarding not long ago, and the redundance management, particularly flight control system that have increased control signal require two remaining four-way control signals to have the conformability of height, otherwise just report fault.The simulator of the XX series aircraft of safeguarding not long ago can not meet XX type aircraft utilization requirement; Through using, electric correlation technique can facilitate as required this utility model aircraft carrying simulator from new design, output is accurately aerial or ground wheel load analog control signal.
Accompanying drawing explanation
Fig. 1 is the utility model electrical equipment connection diagram.
The specific embodiment
Below the utility model is described in further details.
A kind of aircraft carrying simulator, as shown in Figure 1, comprising:
First interface, the second interface;
Described first interface is provided with A, B, C, D, E, F, G, eight joints of H; Described the second interface is provided with a, b, c, d, e, f, g, eight joints of h;
Described first interface A joint one end is connected with analog machine, and the A joint other end is connected with second interface a joint one end, and the second interface a joint other end is connected with the first jack of the first micro-switch plug of aircraft;
Described first interface B joint one end is connected with analog machine, and the B joint other end is connected with second interface b joint one end, and the second interface b joint other end is connected with the second jack of the first micro-switch plug of aircraft;
Described first interface C joint one end is connected with analog machine, and the C joint other end is connected with second interface c joint one end, and the second interface c joint other end is connected with the 3rd jack of the first micro-switch plug of aircraft;
Described first interface D joint one end is connected with analog machine, and the D joint other end is connected with second interface d joint one end, and the second interface d joint other end is connected with the 4th jack of the first micro-switch plug of aircraft;
Described first interface E joint one end is connected with analog machine, and the E joint other end is connected with second interface e joint one end, and the second interface e joint other end is connected with the first jack of the second micro-switch plug of aircraft;
Described first interface F joint one end is connected with analog machine, and the F joint other end is connected with second interface f joint one end, and the second interface f joint other end is connected with the second jack of the second micro-switch plug of aircraft;
Described first interface G joint one end is connected with analog machine, and the G joint other end is connected with second interface g joint one end, and the second interface g joint other end is connected with the 3rd jack of the second micro-switch plug of aircraft;
Described first interface H joint one end is connected with analog machine, and the H joint other end is connected with second interface h joint one end, and the second interface h joint other end is connected with the 4th jack of the second micro-switch plug of aircraft;
Between first interface A joint and the second interface a joint, be serially connected with the first contact of the first contactless switch;
Between first interface B joint and the second interface b joint, be serially connected with the second contact of the first contactless switch;
Between first interface C joint and the second interface c joint, be serially connected with the 3rd contact of the first contactless switch;
Between first interface D joint and the second interface d joint, be serially connected with the 4th contact of the first contactless switch;
Between first interface E joint and the second interface e joint, be serially connected with the first contact of the second contactless switch;
Between first interface F joint and the second interface f joint, be serially connected with the second contact of the second contactless switch;
Between first interface G joint and the second interface g joint, be serially connected with the 3rd contact of the second contactless switch;
Between first interface H joint and the second interface h joint, be serially connected with the 4th contact of the second contactless switch;
The first contactless switch J1 control end, the second contactless switch J2 control end, the 3rd contactless switch J3 control end are connected in parallel between power supply and ground; Change-over swith E1 is connected between power supply and the first contactless switch J1 control end, the second contactless switch J2 control end, the 3rd contactless switch J3 control end; The good switch E2 of power supply and the good indicator lamp K1 of power supply are connected between power supply and ground successively; The contact of conversion lamp K2 and the 3rd contactless switch J3 is connected between power supply and ground successively.
Aircraft is aloft under state, change-over swith E1 disconnects, the first contactless switch J1, the second contactless switch J2, the 3rd contactless switch J3 are in off-position, the second contact of the first contactless switch J1, the 4th contact, the second contact of the second contactless switch J2, the 4th closing of contact, the first contact of the first contactless switch J1, the 3rd contact, the first contact of the second contactless switch J2, the 3rd contact open circuit.Conversion lamp K2 extinguishes.
Aircraft is under ground state, change-over swith E1 closure, the first contactless switch J1, the second contactless switch J2, the 3rd contactless switch J3 are in "on" position, the second contact of the first contactless switch J1, the 4th contact, the second contact of the second contactless switch J2, the 4th contact open circuit, the first contact of the first contactless switch J1, the 3rd contact, the first contact of the second contactless switch J2, the 3rd closing of contact.Conversion lamp K2 lights.
The closed K1 lamp of change-over swith E1 is bright, represents that external power source is normal; If the closed K1 of change-over swith E1 does not work, represent external power source mal.

Claims (1)

1. an aircraft carrying simulator, is characterized in that, comprising:
First interface, the second interface;
Described first interface is provided with A, B, C, D, E, F, G, eight joints of H; Described the second interface is provided with a, b, c, d, e, f, g, eight joints of h;
Described first interface A joint one end is connected with analog machine, and the A joint other end is connected with second interface a joint one end, and the second interface a joint other end is connected with the first jack of the first micro-switch plug of aircraft;
Described first interface B joint one end is connected with analog machine, and the B joint other end is connected with second interface b joint one end, and the second interface b joint other end is connected with the second jack of the first micro-switch plug of aircraft;
Described first interface C joint one end is connected with analog machine, and the C joint other end is connected with second interface c joint one end, and the second interface c joint other end is connected with the 3rd jack of the first micro-switch plug of aircraft;
Described first interface D joint one end is connected with analog machine, and the D joint other end is connected with second interface d joint one end, and the second interface d joint other end is connected with the 4th jack of the first micro-switch plug of aircraft;
Described first interface E joint one end is connected with analog machine, and the E joint other end is connected with second interface e joint one end, and the second interface e joint other end is connected with the first jack of the second micro-switch plug of aircraft;
Described first interface F joint one end is connected with analog machine, and the F joint other end is connected with second interface f joint one end, and the second interface f joint other end is connected with the second jack of the second micro-switch plug of aircraft;
Described first interface G joint one end is connected with analog machine, and the G joint other end is connected with second interface g joint one end, and the second interface g joint other end is connected with the 3rd jack of the second micro-switch plug of aircraft;
Described first interface H joint one end is connected with analog machine, and the H joint other end is connected with second interface h joint one end, and the second interface h joint other end is connected with the 4th jack of the second micro-switch plug of aircraft;
Between first interface A joint and the second interface a joint, be serially connected with the first contact of the first contactless switch;
Between first interface B joint and the second interface b joint, be serially connected with the second contact of the first contactless switch;
Between first interface C joint and the second interface c joint, be serially connected with the 3rd contact of the first contactless switch;
Between first interface D joint and the second interface d joint, be serially connected with the 4th contact of the first contactless switch;
Between first interface E joint and the second interface e joint, be serially connected with the first contact of the second contactless switch;
Between first interface F joint and the second interface f joint, be serially connected with the second contact of the second contactless switch;
Between first interface G joint and the second interface g joint, be serially connected with the 3rd contact of the second contactless switch;
Between first interface H joint and the second interface h joint, be serially connected with the 4th contact of the second contactless switch;
The first contactless switch J1 control end, the second contactless switch J2 control end, the 3rd contactless switch J3 control end are connected in parallel between power supply and ground; Change-over swith E1 is connected between power supply and the first contactless switch J1 control end, the second contactless switch J2 control end, the 3rd contactless switch J3 control end; The good switch E2 of power supply and the good indicator lamp K1 of power supply are connected between power supply and ground successively; The contact of conversion lamp K2 and the 3rd contactless switch J3 is connected between power supply and ground successively.
CN201320737196.3U 2013-11-19 2013-11-19 Plane loading simulator Expired - Fee Related CN203601582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320737196.3U CN203601582U (en) 2013-11-19 2013-11-19 Plane loading simulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320737196.3U CN203601582U (en) 2013-11-19 2013-11-19 Plane loading simulator

Publications (1)

Publication Number Publication Date
CN203601582U true CN203601582U (en) 2014-05-21

Family

ID=50714270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320737196.3U Expired - Fee Related CN203601582U (en) 2013-11-19 2013-11-19 Plane loading simulator

Country Status (1)

Country Link
CN (1) CN203601582U (en)

Similar Documents

Publication Publication Date Title
CN203283257U (en) Rapid back-switching device for urban mass transit computer interlocking system
CN206243509U (en) A kind of analogue means of aircraft test signal
CN204008821U (en) 500kv super-high voltage Micro Aerial Vehicle electrical verification system
CN203365563U (en) Intelligent simulated circuit breaker
CN202041620U (en) Simulation debugging device for high-voltage breaker
CN203950005U (en) Multi-functional overhead transmission line fault monitoring system
CN203601582U (en) Plane loading simulator
CN105471079A (en) Emergency control system and emergency control method for railway track car
CN104931809A (en) DSM test system
CN204615503U (en) A kind of prepared auto restart experiment simulator
CN203535154U (en) Device for detecting on-off of cable core
CN104319810A (en) Input safety protection circuit of photovoltaic inverter and photovoltaic inverter having safety protection function
CN102435943B (en) Testing arrangement of vacuum circuit breaker
CN103186102B (en) A kind of load simulating device of engineering machinery and emulator
CN203339793U (en) An apparatus for switching double DC power supplies in parallel
CN205157704U (en) A circuit mistake proofing meets alarm device for electrical haulage system
CN204719921U (en) In transformer station, charged interval is strayed into warning system
CN202710644U (en) Blower fan power off acousto-optic indicator
CN107290602A (en) A kind of vacant lot state simulation exerciser
CN204575789U (en) A kind of whole rocket separation connector patches monitoring reliability structure
CN204904553U (en) Middling pressure switching of power controller and power supply system
CN203276675U (en) Switch simulation teaching training device
CN202798135U (en) Double-T inner bridge substation spare power automatic switching device corresponding operation model self-adaptive device
CN204119590U (en) A kind of hydroelectric station accident forces illuminating lamp
CN203616622U (en) Mine explosion-proof and intrinsically-safe type intelligent alarm vacuum switch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140521

Termination date: 20161119