CN203595610U - Testing device and system for heat-pump hot-water unit - Google Patents

Testing device and system for heat-pump hot-water unit Download PDF

Info

Publication number
CN203595610U
CN203595610U CN201320513730.2U CN201320513730U CN203595610U CN 203595610 U CN203595610 U CN 203595610U CN 201320513730 U CN201320513730 U CN 201320513730U CN 203595610 U CN203595610 U CN 203595610U
Authority
CN
China
Prior art keywords
water
heat pump
heating machine
trap
machine unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320513730.2U
Other languages
Chinese (zh)
Inventor
吴静龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TCL Air Conditioner Zhongshan Co Ltd
Original Assignee
TCL Air Conditioner Zhongshan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TCL Air Conditioner Zhongshan Co Ltd filed Critical TCL Air Conditioner Zhongshan Co Ltd
Priority to CN201320513730.2U priority Critical patent/CN203595610U/en
Application granted granted Critical
Publication of CN203595610U publication Critical patent/CN203595610U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a testing device for a heat-pump hot-water unit, and the device comprises a water tank, a water pump, a first manifold, a second manifold, and a first solenoid valve. The water tank is connected with the water pump through a pipeline. One end of the first manifold is connected with the water inflow end of the water tank through a pipeline, and the other end of the first manifold is used for connecting the water outlet of the heat-pump hot-water unit. One end of the second manifold is connected with the water pump through a pipeline, and the other end of the second manifold is used for connecting the water inlet of circulation-mode water channel of the heat-pump hot-water unit and the water inlet of a water channel of a direct-heating mode. The first solenoid valve is disposed between the second manifold and the heat-pump hot-water unit, and is used for electrical connection with the main board of the heat-pump hot-water unit. The utility model also discloses a testing system for the heat-pump hot-water unit. The testing device provided by the utility model is simple in manufacture, occupies a small space, and can carry out automatic switching of water heating between the circulation mode and the direct-heating mode randomly during testing, thereby enables the verification of the heating capability of the heat-pump hot-water unit to be convenient.

Description

The proving installation of heat pump water-heating machine and system
Technical field
The utility model relates to hot water machine technical field, specially refers to a kind of proving installation and system of heat pump water-heating machine.
Background technology
In the time of the heating capacity of the circulating hot water machine of test directly-heated product, existing proving installation adopts structure as shown in Figure 1, the water trap 2 that comprises water tank 1, be connected with the water delivering orifice of hot water machine unit, the water trap 3 being connected with the water inlet in circulation pattern water route and the water trap 4 being connected with the water inlet in directly-heated pattern water route, be also connected a water pump 5 for the water pump of water tank 1 is gone out drawing together water tank 1 and water trap 3; This proving installation also comprises and is respectively used to control water route conducting and the angle valve 6 of cutting out and the angle valve 7 that water trap 3 is connected with water trap 4.In the time that the water heating ability under different water heating patterns is tested, need manually go to switch angle valve 6 and angle valve 7 could meet the test condition under circulation pattern, directly-heated pattern, concrete operations are as follows:
One, water heating aptitude tests under circulation pattern: close angle valve 7, open angle valve 6, water-in and water-out platinum resistance for testing water temperature is placed on respectively to water trap 3 and water trap 2, deduct the water temperature that the platinum resistance on water trap 3 detects by the water temperature that the platinum resistance on water trap 2 detects, be the temperature that every circulation primary water temperature raises;
Two, water heating aptitude tests under directly-heated pattern: close angle valve 6, open angle valve 7, water-in and water-out platinum resistance is placed on respectively water trap 4 and water trap 2 on, deduct the temperature that can raise when water temperature that the platinum resistance on water trap 4 detects is directly-heated pattern water heating by the water temperature that the platinum resistance on water trap 2 detects.
Adopt this proving installation, owing to not automatically switching, thereby be inconvenient to verify the heating capacity of heat pump water-heating machine unit between directly-heated pattern and circulation pattern, operate comparatively loaded down with trivial details.
Utility model content
Fundamental purpose of the present utility model is for providing a kind of proving installation and system of heat pump water-heating machine, can make simple to operate, effective, and the heating capacity of convenient checking heat pump water-heating machine unit.
The utility model provides a kind of proving installation of heat pump water-heating machine, comprising: water tank, water pump, the first water trap, the second water trap and the first solenoid valve; Wherein, described water tank is connected by pipeline with water pump,
One end of described the first water trap connects the water inlet end of water tank by pipeline, the other end is for connecting the water delivering orifice of heat pump water-heating machine unit;
One end of described the second water trap connects described water pump by pipeline, and the other end is for connecting the water inlet in heat pump water-heating machine unit circulation pattern water route and the water inlet in directly-heated pattern water route;
Described the first solenoid valve is arranged between described the second water trap and described heat pump water-heating machine unit, and for being electrically connected with the mainboard of described heat pump water-heating machine unit.
Preferably, described the first solenoid valve is arranged between described the second water trap and heat pump water-heating machine unit circulation pattern water route water inlet.
Preferably, the proving installation of heat pump water-heating machine also comprises that one is connected to the angle valve between described the second water trap and the water inlet in heat pump water-heating machine unit directly-heated pattern water route.
Preferably, the proving installation of heat pump water-heating machine also comprises and is separately positioned on the upper end of described the first water trap and the second water trap, the first temperature sensor and the second temperature sensor for detection of water temperature.
Preferably, described the first temperature sensor and the second temperature sensor are platinum resistance.
The utility model also provides a kind of test macro of heat pump water-heating machine, comprise heat pump water-heating machine unit, described heat pump water-heating machine unit comprises the water inlet in water delivering orifice, circulation pattern water route and water inlet and the mainboard in directly-heated pattern water route, and this test macro also comprises above-mentioned any one proving installation; Wherein, described water delivering orifice is connected by pipeline with the first water trap of proving installation, the water inlet in described circulation pattern water route is connected by pipeline with the water inlet in directly-heated pattern water route and the second water trap of proving installation, and described mainboard is electrically connected with the first solenoid valve of proving installation.
The utility model can be by being connected the first water trap with the water delivering orifice of heat pump water-heating machine unit, the second water trap is connected with the water inlet in heat pump water-heating machine unit circulation pattern water route and the water inlet in directly-heated pattern water route respectively by pipeline, and the first solenoid valve that setting is electrically connected with the mainboard of heat pump water-heating machine unit between the second water trap and the water route of heat pump water-heating machine unit circulation pattern, the conducting in the water route of the signal controlling heat pump water-heating machine unit circulation pattern sending according to the mainboard of heat pump water-heating machine unit and closing, the solenoid valve simultaneously carrying by heat pump water-heating machine unit inside control directly-heated pattern water route conducting and close.That this proving installation is made is simple, effectively, take up room little, and can be optionally in the time of test under circulation pattern and directly-heated pattern water heating automatically switch, thereby the heating capacity of convenient checking heat pump water-heating machine unit.
Accompanying drawing explanation
Fig. 1 is the structural representation of the proving installation of prior art heat pump water-heating machine;
Fig. 2 provides the structural representation of the proving installation of heat pump water-heating machine for the utility model.
Realization, functional characteristics and the advantage of the utility model object, in connection with embodiment, are described further with reference to accompanying drawing.
Embodiment
Should be appreciated that specific embodiment described herein is only in order to explain the utility model, and be not used in restriction the utility model.
The utility model provides a kind of proving installation of heat pump water-heating machine.Between the second water trap and heat pump water-heating machine unit, be connected the first solenoid valve; By this first solenoid valve according to the conducting in the mainboard control heat pump water-heating machine unit circulation pattern water route of heat pump water-heating machine unit with close, the conducting in the second solenoid control heat pump water-heating machine unit directly-heated pattern water route of the mainboard inside by heat pump water-heating machine unit simultaneously and closing, realizes increasingly automated to heat pump water-heating machine test.
With reference to Fig. 2, Fig. 2 provides the structural representation of the proving installation of heat pump water-heating machine for the utility model.
The proving installation of the heat pump water-heating machine that the present embodiment provides, for the water heating ability of heat pump water-heating machine is tested, it comprises water tank 101 and the water pump 108 being connected by pipeline with the water side of this water tank 101, the water pump in water tank 101 can be gone out by water pump 108; Also comprise be connected to water tank 101 and heat pump water-heating machine unit (scheming not shown) between the first water trap 102 and the second water trap 103, wherein, one end of the first water trap 102 is connected with the water inlet end of water tank 101 by pipeline, the other end, in the time testing the water heating ability of heat pump water-heating machine, is connected with the water delivering orifice of heat pump water-heating machine unit; One end of the second water trap 103 is connected to the water side of water tank 101 by pipeline and water pump 108, the other end, in the time testing the water heating ability of heat pump water-heating machine, is connected with the water inlet in heat pump water-heating machine unit circulation pattern water route and the water inlet in directly-heated pattern water route respectively by two pipelines.
When the water heating ability of heat pump water-heating machine test under circulation pattern, the water flowing out from water tank 101 enters the water inlet in heat pump water-heating machine unit circulation pattern water route through wherein pipeline of the second water trap 103, in heat pump water-heating machine unit, heat, flow into the first water trap 102 from the water delivering orifice of heat pump water-heating machine unit, get back to water tank 101 from the first water trap 102, complete circulating-heating one time; When the water heating ability of heat pump water-heating machine test under directly-heated pattern, the water flowing out from water tank 101 enters the water inlet in heat pump water-heating machine unit directly-heated pattern water route through another pipeline of the second water trap 103, in heat pump water-heating machine unit, heat, flow into the first water trap 102 from the water delivering orifice of heat pump water-heating machine unit, get back to water tank 101 from the first water trap 102, thereby complete directly-heated heating.
In the present embodiment, this proving installation also comprises the first solenoid valve 104 being arranged between the second water trap 103 and heat pump water-heating machine unit, particularly, this first solenoid valve 104 is arranged between the second water trap 103 and the water route of heat pump water-heating machine unit circulation pattern, and can be electrically connected with the mainboard of heat pump water-heating machine unit, for the conducting in the water route of the signal controlling heat pump water-heating machine unit circulation pattern that sends according to the mainboard of heat pump water-heating machine unit with close; The conducting in the water route of heat pump water-heating machine unit directly-heated pattern and close the solenoid valve (scheming not shown) carrying by hot water machine unit inside and control.While test under circulation pattern, the mainboard of heat pump water-heating machine unit switches on to the first solenoid valve 104, makes the conducting of circulation pattern water route, controls its inner closed electromagnetic valve simultaneously, and the water route of directly-heated pattern is closed; And while testing under directly-heated pattern, its inner solenoid valve of the mainboard control of heat pump water-heating machine unit is opened, and makes the water route conducting of directly-heated pattern, disconnects the energising of the first solenoid valve 104 simultaneously, and circulation pattern water route is closed.
Further, the proving installation of heat pump water-heating machine also comprises that one is connected to the angle valve 105 between the second water trap 103 and the water inlet in heat pump water-heating machine unit directly-heated pattern water route, in the time of test, angle valve 105 can be always in open mode, make the water route of heat pump water-heating machine unit directly-heated pattern always in connected state, so just without the opening and closing of manually removing to control angle valve.
Further, this proving installation also comprise be arranged in the upper end of the first water trap 102, for detection of the first temperature sensor 106 of the water temperature through the first water trap 102, be provided with the second temperature sensor 107 for detection of the water temperature through the second water trap 104 in the upper end of the second water trap 104, in the present embodiment, the first temperature sensor 106 and the second temperature sensor 107 can be platinum resistance.In the time that the water heating ability to heat pump water-heating machine is tested, the detected water temperature through the first water trap 102 of the first temperature sensor 106 deducts the detected water temperature through the second water trap 104 of the second temperature sensor 107, be the temperature that circulating-heating of circulation pattern raises, or heat the temperature raising for directly-heated pattern.
The present embodiment is by being connected the first water trap 102 with the water delivering orifice of heat pump water-heating machine unit, the second water trap 103 is connected with the water inlet in heat pump water-heating machine unit circulation pattern water route and the water inlet in directly-heated pattern water route respectively by two pipelines, and the first solenoid valve 104 that setting is electrically connected with the mainboard of heat pump water-heating machine unit between the second water trap 103 and the water route of heat pump water-heating machine unit circulation pattern, the conducting in the water route of the signal controlling heat pump water-heating machine unit circulation pattern sending according to the mainboard of heat pump water-heating machine unit and closing, the solenoid valve simultaneously carrying by heat pump water-heating machine unit inside control directly-heated pattern water route conducting and close.That this proving installation is made is simple, effectively, take up room little, and can be optionally in the time of test under circulation pattern and directly-heated pattern water heating automatically switch, thereby convenient checking heat pump water-heating machine unit heating capacity.
The utility model also provides a kind of test macro of heat pump water-heating machine.
The test macro of the heat pump water-heating machine that the present embodiment provides, comprise heat pump water-heating machine unit, this heat pump water-heating machine unit comprises the water inlet in water delivering orifice, circulation pattern water route and water inlet and the mainboard in directly-heated pattern water route, and this test macro also comprises arbitrary proving installation of above-described embodiment; Wherein, water delivering orifice is connected by pipeline with the first water trap of proving installation, and the water inlet in circulation pattern water route is connected by pipeline with the water inlet in directly-heated pattern water route and the second water trap of proving installation, and mainboard is electrically connected with the first solenoid valve of proving installation.
In the present embodiment, the test macro of heat pump water-heating machine also comprises the second solenoid valve in the mainboard that is arranged on heat pump water-heating machine unit, for controlling the water route conducting of heat pump water-heating machine unit directly-heated pattern and closing.While test under circulation pattern, the mainboard of heat pump water-heating machine unit is given the first solenoid valve energising, makes the conducting of circulation pattern water route, controls its inner closed electromagnetic valve simultaneously, and the water route of directly-heated pattern is closed; And while testing under directly-heated pattern, its inner solenoid valve of the mainboard control of heat pump water-heating machine unit is opened, and makes the water route conducting of directly-heated pattern, disconnects the energising of the first solenoid valve simultaneously, and circulation pattern water route is closed.
The test macro of this heat pump water-heating machine can be with reference to whole technical schemes of whole embodiment of above-mentioned proving installation, and its technique effect reaching is also identical, does not repeat at this.
The foregoing is only preferred embodiment of the present utility model; not thereby limit the scope of the claims of the present utility model; every equivalent structure transformation that utilizes the utility model instructions and accompanying drawing content to do; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present utility model.

Claims (6)

1. a proving installation for heat pump water-heating machine, is characterized in that, comprising: water tank, water pump, the first water trap, the second water trap and the first solenoid valve; Wherein, described water tank is connected by pipeline with water pump,
One end of described the first water trap connects the water inlet end of water tank by pipeline, the other end is for connecting the water delivering orifice of heat pump water-heating machine unit;
One end of described the second water trap connects described water pump by pipeline, and the other end is for connecting the water inlet in heat pump water-heating machine unit circulation pattern water route and the water inlet in directly-heated pattern water route;
Described the first solenoid valve is arranged between described the second water trap and described heat pump water-heating machine unit, and for being electrically connected with the mainboard of described heat pump water-heating machine unit.
2. the proving installation of heat pump water-heating machine according to claim 1, is characterized in that, described the first solenoid valve is arranged between described the second water trap and the water inlet in heat pump water-heating machine unit circulation pattern water route.
3. the proving installation of heat pump water-heating machine according to claim 2, is characterized in that, also comprises that one is connected to the angle valve between described the second water trap and the water inlet in heat pump water-heating machine unit directly-heated pattern water route.
4. according to the proving installation of the heat pump water-heating machine described in any one in claims 1 to 3, it is characterized in that, also comprise and be separately positioned on the upper end of described the first water trap and the second water trap, the first temperature sensor and the second temperature sensor for detection of water temperature.
5. the proving installation of heat pump water-heating machine according to claim 4, is characterized in that, described the first temperature sensor and the second temperature sensor are platinum resistance.
6. the test macro of a heat pump water-heating machine, comprise heat pump water-heating machine unit, described heat pump water-heating machine unit comprises the water inlet in water delivering orifice, circulation pattern water route, water inlet and the mainboard in directly-heated pattern water route, it is characterized in that, described test macro also comprises the proving installation as described in any one in claim 1 to 5; Wherein, described water delivering orifice is connected by pipeline with the first water trap of described proving installation, the water inlet in described circulation pattern water route is connected by pipeline with the water inlet in directly-heated pattern water route and the second water trap of described proving installation, and described mainboard is electrically connected with the first solenoid valve of described proving installation.
CN201320513730.2U 2013-08-21 2013-08-21 Testing device and system for heat-pump hot-water unit Expired - Fee Related CN203595610U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320513730.2U CN203595610U (en) 2013-08-21 2013-08-21 Testing device and system for heat-pump hot-water unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320513730.2U CN203595610U (en) 2013-08-21 2013-08-21 Testing device and system for heat-pump hot-water unit

Publications (1)

Publication Number Publication Date
CN203595610U true CN203595610U (en) 2014-05-14

Family

ID=50676480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320513730.2U Expired - Fee Related CN203595610U (en) 2013-08-21 2013-08-21 Testing device and system for heat-pump hot-water unit

Country Status (1)

Country Link
CN (1) CN203595610U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510070A (en) * 2015-12-11 2016-04-20 珠海格力电器股份有限公司 Directly-heated water heater test apparatus and test method
CN110763497A (en) * 2019-10-12 2020-02-07 青岛海信日立空调系统有限公司 Laboratory test system and method suitable for air source heat pump hot water system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510070A (en) * 2015-12-11 2016-04-20 珠海格力电器股份有限公司 Directly-heated water heater test apparatus and test method
CN110763497A (en) * 2019-10-12 2020-02-07 青岛海信日立空调系统有限公司 Laboratory test system and method suitable for air source heat pump hot water system
CN110763497B (en) * 2019-10-12 2021-08-03 青岛海信日立空调系统有限公司 Laboratory test system and method suitable for air source heat pump hot water system

Similar Documents

Publication Publication Date Title
CN103411314B (en) Hot water machine backwater control assembly, hot water machine and backwater control method thereof
CN101982756B (en) Cold and hot alternation impact test device
CN109506373B (en) Toilet and bathroom and heating synchronous operation wall-mounted furnace and control method thereof
CN105135579A (en) Base station air conditioner, humidifying system thereof and humidifying system control method
CN203595610U (en) Testing device and system for heat-pump hot-water unit
CN102997428B (en) Water heater with water saving system
CN106766227A (en) A kind of water heater intelligent constant-temperature circulating device
CN108489072A (en) Central hot-water system, central heater and water heater control method
CN201740205U (en) Pipeline back heating device of heater and heater
CN103591636B (en) Two water tank heat exchange water systems and control method thereof
CN204153956U (en) Hot water apparatus
CN103308331A (en) Pressure testing system for instant water heater
CN205860202U (en) A kind of underground heat water leakage monitoring controls device and geothermal system
US9027595B2 (en) Transparent fluid recirculation reservoir system
CN211424704U (en) Water heater system
WO2020233215A1 (en) Water heater, control method for water heater and storage medium
CN208186499U (en) Central hot-water system and central heater
CN103047766B (en) Water heater arrangement
CN208504511U (en) Geothermal heating system
CN208937216U (en) Improve the device of heat dissipating capacity of heating radiator measurement flow system flow measuring accuracy
CN206556265U (en) A kind of water heater intelligent constant-temperature circulating device
CN205919534U (en) Temperature regulation apparatus , electrical apparatus box and air of electrical apparatus box can water heaters
CN215077574U (en) Water dispenser with hot water leakage alarm device
CN205579942U (en) Water heater heating structure
CN105890039A (en) Intelligent heating control device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140514

Termination date: 20170821