CN203587368U - Air-conditioner simulation equipment - Google Patents

Air-conditioner simulation equipment Download PDF

Info

Publication number
CN203587368U
CN203587368U CN201320744784.XU CN201320744784U CN203587368U CN 203587368 U CN203587368 U CN 203587368U CN 201320744784 U CN201320744784 U CN 201320744784U CN 203587368 U CN203587368 U CN 203587368U
Authority
CN
China
Prior art keywords
fault
parts
components
air
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320744784.XU
Other languages
Chinese (zh)
Inventor
许晨
王维国
徐永恩
陈志刚
杨冬祥
黄学理
颜滔滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201320744784.XU priority Critical patent/CN203587368U/en
Application granted granted Critical
Publication of CN203587368U publication Critical patent/CN203587368U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The utility model discloses air-conditioner simulation equipment. The air-conditioner simulation equipment comprises fault simulation components and fault switches, wherein the fault simulation components are used for simulating faults of corresponding components of an air-conditioner, fault switches are respectively connected with the fault simulation components, and each fault switch includes a first operation state in which the fault simulation component is in a normal state and a second operation state in which the fault simulation component is in a fault state. According to the air-conditioner simulation equipment, corresponding fault points in the air-conditioner can be timely and accurately found out.

Description

Air conditioning simulation equipment
Technical field
The utility model relates to field of air conditioning, in particular to a kind of air conditioning simulation equipment.
Background technology
At present, convertible frequency air-conditioner has good comfortableness and superior energy saving because of it, and by masses, is accepted gradually, day by day universal in life, has come into huge numbers of families.But convertible frequency air-conditioner is compared with fixed frequency air conditioner, system, automatically controlled and structure be relative complex all, once break down, detects maintenance difficulty large, and maintenance efficiency is low, has brought certain difficulty to after-sales service personnel, and after sale service is difficult to be protected.Because convertible frequency air-conditioner function increases gradually, maintenance personal is not when detecting air-conditioning, usually cannot know the failure condition of components and parts in air-conditioning, cause being difficult to finding exactly trouble spot to keep in repair, the difficulty that has therefore affected the efficiency of maintenance and increased maintenance.
For in prior art when air-conditioning not being detected, cannot know the problem of the fault of components and parts in air-conditioning, effective solution is not yet proposed at present.
Utility model content
Fundamental purpose of the present utility model is to provide a kind of air conditioning simulation equipment, to solve when air-conditioning not being detected, cannot know the problem of the fault of components and parts in air-conditioning.
To achieve these goals, according to an aspect of the present utility model, provide a kind of air conditioning simulation equipment.According to air conditioning simulation equipment of the present utility model, comprise: fault simulation components and parts, for simulating the fault of the corresponding components and parts of air-conditioning; Breakdown switch, is connected with fault simulation components and parts, and breakdown switch has to be made first mode of operation of fault simulation components and parts in normal condition and makes fault simulation components and parts in malfunction the second mode of operation.
Further, fault simulation components and parts comprise Fisrt fault analog component and the second fault simulation components and parts, breakdown switch comprise for simulate air-conditioning the first components and parts fault Fisrt fault switch and for simulating fault second breakdown switch of the second components and parts of air-conditioning, wherein: Fisrt fault switch is connected with Fisrt fault analog component, the second breakdown switch is connected with Fisrt fault analog component.
Further, air conditioning simulation equipment also comprises: mainboard; Wherein, fault simulation components and parts and breakdown switch are all arranged on mainboard, and mainboard, fault simulation components and parts and breakdown switch adopt distributed arrangement.
Further, air conditioning simulation equipment also comprises: adjustable resistance, is connected with mainboard, for coming analog temperature to change by adjusting resistance; And governor motion, be connected with adjustable resistance, for regulating the resistance of adjustable resistance.
Further, air conditioning simulation equipment also comprises: on mainboard, be provided with slot, wherein, fault simulation components and parts and breakdown switch are arranged on mainboard by slot.
Further, air conditioning simulation equipment also comprises: testing agency, is connected with slot, for detecting inserting the fault simulation components and parts of slot.
Further, testing agency is frequency conversion detector, and frequency conversion detector is for detecting in real time service data and the fault of air conditioning simulation equipment.
Further, air conditioning simulation equipment also comprises: output interface, is arranged on mainboard, for connecting the load of air-conditioning.
Further, load comprises compressor, inner blower, outer blower fan, four-way valve and expansion valve, and wherein, output interface comprises compressor output interface, inner blower output interface, outer blower fan output interface, four-way valve output interface and expansion valve output interface.
Further, air conditioning simulation equipment also comprises: pilot lamp, be connected with fault simulation components and parts, pilot lamp comprises and is used to indicate first show state of fault simulation components and parts in normal condition and be used to indicate fault simulation components and parts in malfunction the second show state.
By the utility model, adopt a kind of air conditioning simulation equipment to comprise: fault simulation components and parts, for simulating the fault of the corresponding components and parts of air-conditioning; Breakdown switch, be connected with fault simulation components and parts, breakdown switch has to be made first mode of operation of fault simulation components and parts in normal condition and makes fault simulation components and parts in malfunction the second mode of operation, solved the problem that cannot know the failure condition of components and parts in air-conditioning, thereby can know the failure condition of corresponding components and parts in air-conditioning, do not need air-conditioning to detect, and then can find timely and accurately corresponding trouble spot in air-conditioning.
Accompanying drawing explanation
The accompanying drawing that forms the application's a part is used to provide further understanding of the present utility model, and schematic description and description of the present utility model is used for explaining the utility model, does not form improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is according to the structural representation of the air conditioning simulation equipment of the utility model embodiment.
Embodiment
It should be noted that, in the situation that not conflicting, embodiment and the feature in embodiment in the application can combine mutually.Describe below with reference to the accompanying drawings and in conjunction with the embodiments the utility model in detail.
The utility model embodiment provides a kind of air conditioning simulation equipment, the fault that this air conditioning simulation equipment can be adjusted for analog space.
Fig. 1 is according to the structural representation of the air conditioning simulation equipment of the utility model embodiment.As shown in Figure 1, this air conditioning simulation equipment comprises fault simulation components and parts 10 and breakdown switch 20.
Fault simulation components and parts 10 are for simulating the fault of the corresponding components and parts of air-conditioning.Fault simulation components and parts 10 can be the original electronic devices and components of air-conditioning, can also be not have out of order components and parts.Fault simulation components and parts 10 can be components and parts, also can be a plurality of components and parts, fault simulation components and parts 10 are for simulating the fault of the corresponding components and parts of air-conditioning, and a plurality of fault simulation components and parts 10 are respectively used to simulate the fault of corresponding a plurality of components and parts.By fault simulation components and parts 10, simulate the fault of the corresponding components and parts in air-conditioning, can make air-conditioning maintenance personnel can understand the fault of corresponding components and parts in air-conditioning.
Breakdown switch 20 is connected with fault simulation components and parts 10, this breakdown switch 20 has the first mode of operation and the second mode of operation, wherein, when breakdown switch 20 is during in the first mode of operation, fault simulation components and parts 10 are in normal condition, when breakdown switch 20 is during in the second mode of operation, fault simulation components and parts 10 are in malfunction.The first mode of operation of breakdown switch 20 can be that the closure state of this breakdown switch 20 can be also off-state, when the first mode of operation of breakdown switch 20 is closure state, the second mode of operation of breakdown switch 20 is off-state; Otherwise when the first mode of operation of breakdown switch 20 is off-state, the second mode of operation of breakdown switch 20 is closure state.When breakdown switch 20 is during in the first mode of operation, fault simulation components and parts 10 are in normal condition, and can simulate corresponding components and parts in air-conditioning is normal condition; When breakdown switch 20 is during in the second mode of operation, fault simulation components and parts 10, in malfunction, can be simulated the fault of corresponding components and parts in air-conditioning.
According to the utility model embodiment; by the state of breakdown switch 20; make fault simulation components and parts 10 in normal or malfunction; fault with corresponding components and parts in simulation air-conditioning; thereby can know the failure condition of corresponding components and parts in air-conditioning; do not need air-conditioning to detect, and then can find timely and accurately corresponding trouble spot in air-conditioning.
Preferably, fault simulation components and parts 10 comprise Fisrt fault analog component 101 and the second fault simulation components and parts 102, breakdown switch 20 comprises Fisrt fault switch 201 and the second breakdown switch 202, and wherein, Fisrt fault analog component 101 is for simulating the fault of the first components and parts of air-conditioning; The second fault simulation components and parts 102 are for simulating the fault of the second components and parts of air-conditioning.Fisrt fault analog component 101 is corresponding with the first components and parts in air-conditioning, and the second fault simulation components and parts 102 are corresponding with the second components and parts in air-conditioning.
Fisrt fault switch 201 is connected with Fisrt fault analog component 101, and the second breakdown switch 202 is connected with the second fault simulation components and parts 102.When Fisrt fault switch 201 is during in the first mode of operation, Fisrt fault analog component 101 is in normal condition, and when Fisrt fault switch 201 is during in the second mode of operation, Fisrt fault analog component 101 is in malfunction.When the second breakdown switch 202 is during in the first mode of operation, the second fault simulation components and parts 102 are in normal condition, and when the second breakdown switch 202 is during in the second mode of operation, the second fault simulation components and parts 102 are in malfunction.For example, when the first mode of operation of Fisrt fault switch 201 is for disconnecting, the second mode of operation is when disconnecting.When Fisrt fault switch 201 is closed, show that Fisrt fault analog component 101 is in normal condition; When Fisrt fault switch 201 disconnects, show that Fisrt fault analog component 101 is in malfunction.When Fisrt fault switch 201 disconnects, staff can be known the failure condition of this Fisrt fault analog component 101, thereby knows the failure condition of corresponding components and parts in air-conditioning.
Certainly, in the utility model embodiment, fault simulation components and parts 10 can also comprise the 3rd fault simulation components and parts 103 etc., breakdown switch 20 can also comprise the 3rd breakdown switch 203 etc.,, fault simulation components and parts 10 in the utility model embodiment and breakdown switch 20 all can be for a plurality of, by a plurality of fault simulation components and parts 10, cooperatively interact with a plurality of breakdown switches 20, can simulate the failure condition of a plurality of components and parts in air-conditioning, thereby help breakdown maintenance personnel to know the failure condition of components and parts in air-conditioning.
It should be noted that, the term " first " in instructions of the present utility model and claims and above-mentioned accompanying drawing, " second " etc. are for distinguishing similar object, and needn't be for describing specific order or precedence.Should be appreciated that the data of such use are suitably exchanging in situation, so that embodiment of the present utility model described herein.
Preferably, the air conditioning simulation equipment of the utility model embodiment also comprises mainboard 30, and as shown in Figure 1, fault simulation components and parts 10 and breakdown switch 20 are all arranged on mainboard 30, and mainboard 30, fault simulation components and parts 10 and breakdown switch adopt distributed arrangement.Wherein, breakdown switch 20 can be also external gauge tap, is connected on mainboard 30.Adopt the air conditioning simulation equipment of distributed arrangement, be convenient to the components and parts on this equipment to carry out detachable maintaining, can carry out simulated failure maintenance whenever and wherever possible, help after-sales service personnel to improve rapidly maintenance skills.
Preferably, the air conditioning simulation equipment of the utility model embodiment also comprises adjustable resistance 40 and governor motion.
As shown in Figure 1, adjustable resistance 40 is connected with mainboard 30, for coming analog temperature to change by adjusting resistance.Adjustable resistance 40 is equivalent to the temperature-sensitive bag of the indoor and outdoor blower fan in air-conditioning, and this adjustable resistance 40 can be accurate adjustable resistance, by regulating the resistance of adjustable resistance 40 to reach analog temperature, by regulating resistance to carry out the variation of analog temperature.Governor motion is connected with adjustable resistance 40, for regulating the resistance of adjustable resistance 40.Can to the resistance of adjustable resistance 40, regulate by governor motion, thereby reach the resistance of setting, and then simulate corresponding temperature.By adjustable resistance 40 and governor motion are set on air conditioning simulation equipment, and regulate the resistance of adjustable resistance 40 to simulate corresponding temperature by governor motion, make under the identical environment of air conditioning simulation equipment in the air-conditioning with simulateding, meet and enter all kinds of running statuses, thereby avoid the impact of environmental factor on air-condition faults simulation.
Preferably, the air conditioning simulation equipment of the utility model embodiment also comprises slot, and this slot is arranged on mainboard 30, and wherein, fault simulation components and parts 10 and breakdown switch 20 are arranged on mainboard 30 by slot.By being arranged on the slot on mainboard 30, can on air conditioning simulation equipment, increase or change fault simulation components and parts 10 and breakdown switch 20 etc., such as, can carry out on-line testing by having problem or uncertain problematic original paper to replace original original paper on mainboard 30, to determine quality, also can some faults be set by replacing some problematic components and parts, for staff, carry out trouble hunting.According to the utility model embodiment, the simulation that realizes all kinds of faults by switch and the slot of setting, convenient and safe.By the slot arranging on mainboard 30, can carry out online testing to the higher components and parts of failure rate, convenient and reliable.
It should be noted that, the air conditioning simulation equipment of the utility model embodiment can also detect the fault of the components and parts in air-conditioning, on mainboard 30, slot is set, and the components and parts in air-conditioning can be plugged on this slot these components and parts are detected.
Preferably, the air conditioning simulation equipment of the utility model embodiment also comprises testing agency, and this testing agency is connected with slot, for detecting inserting the fault simulation components and parts 10 of slot.Testing agency can detect the service data of the fault simulation components and parts 10 that insert slot and insert the fault of the fault simulation components and parts 10 of slot.When insert the components and parts of air-conditioning on slot, can detect the failure condition of these components and parts.
Further, testing agency 50 is frequency conversion detector, and this frequency conversion detector is for detecting in real time service data and the fault of air conditioning simulation equipment.Frequency conversion detector can also, for detecting in real time the service data of air conditioning simulation equipment, by operational factor and the state of real-time monitoring air conditioning simulation equipment, can improve efficiency and the accuracy of fault detect.
Preferably, the air conditioning simulation equipment of the utility model embodiment also comprises output interface.This output interface is arranged on mainboard 30, for connecting the load of air-conditioning.This output interface can be for connecting compressor, inner blower, outer blower fan, four-way valve, the expansion valve even load of air-conditioning.Output interface can be an interface, can be also a plurality of interfaces, and each output interface is for connecting the load of corresponding air-conditioning.According to the utility model embodiment, by being provided with output interface, make air conditioning simulation equipment can connect by this output interface the corresponding load of air-conditioning, thereby for detection of the failure condition of this load.
Further, load in above-mentioned comprises compressor, inner blower, outer blower fan, four-way valve and expansion valve, wherein, output interface comprises compressor output interface 601, inner blower output interface 602, outer blower fan output interface 603, four-way valve output interface 604 and expansion valve output interface 605.Compressor output interface 601, inner blower output interface 602, outer blower fan output interface 603, four-way valve output interface 604 and expansion valve output interface 605 are successively for being connected compressor, inner blower, outer blower fan, four-way valve and the expansion valve of air-conditioning
Preferably, air conditioning simulation equipment also comprises pilot lamp 70, this pilot lamp 70 is connected with fault simulation components and parts 10, this pilot lamp 70 comprises the first show state and the second show state, wherein, when fault simulation components and parts 10 are during in normal condition, pilot lamp 70 is in the first show state, when fault simulation components and parts 10 are during in malfunction, pilot lamp 70 is in the second show state.Pilot lamp 70 is for the duty of the load of the air-conditioning that shows each device of air conditioning simulation equipment or be connected with air conditioning simulation equipment.The first show state of pilot lamp 70 and the second show state are different states, for example, the bright and lamp of the lamp state such as go out, or time different colours state.When fault simulation components and parts 10 are normal condition or malfunction, pilot lamp 70 shows different states.When pilot lamp 70 can be one, also can be for a plurality of, a pilot lamp 70 can be for showing the duty (comprising malfunction and normal condition) of fault simulation components and parts 10, and a plurality of pilot lamp 70 can be for showing respectively the duty of a plurality of fault simulation components and parts 10.
Certainly, because the air conditioning simulation equipment of the utility model embodiment can also be for the fault of each load of testing air conditioner, therefore, pilot lamp 70 can also be for showing the duty of the load of the air-conditioning being connected with the output interface of air conditioning simulation equipment, so that detect the fault of the load of air-conditioning.
According to the utility model embodiment, by using pilot lamp 70 the demonstration such as the running status of air conditioning simulation equipment and fault are reported to the police to, make staff very clear to the failure condition of the components and parts on air conditioning simulation equipment.
The air conditioning simulation equipment of the utility model embodiment also comprises indication mechanism 80 and power-on mechanism 90, and wherein indication mechanism 80 is arranged on mainboard 30, can be for showing the operational factor of air conditioning simulation equipment; Power-on mechanism 90 is for by being connected to provide power supply to air conditioning simulation equipment with external power supply.This power-on mechanism 90 also has filtering and leakage protection.Power-on mechanism 90 can be for access civil power 220V, to provide power supply to air conditioning simulation equipment.
The air conditioning simulation equipment of the utility model embodiment can, for to the fault simulation of air-conditioning components and parts and detection, to facilitate after-sales service personnel Fast Learning to understand the situation of the fault of air-conditioning lattice part, thereby improve maintenance efficiency.And the use of this air conditioning simulation equipment is not subject to the restriction of the factors such as place, only need to provide a power supply architecture to air conditioning simulation equipment.
In addition, each several part in the air conditioning simulation equipment of the utility model above-described embodiment adopts distributed arrangement, power-on mechanism 90, mainboard 30, drive part and load are carried out separated, to allow student distinguish principle and the function of each several part.Simple in structure directly perceived, be convenient to detachable maintaining, can carry out simulated failure maintenance whenever and wherever possible and the modules of convertible frequency air-conditioner and parts are tested, help after-sales service personnel to improve rapidly maintenance skills.
For example, by the accurate adjustable resistance 40 of simulated environment temperature be transferred to suitable resistance by air conditioning simulation equipment in refrigeration or heat state, press corresponding breakdown switch 20, phenomenon and pilot lamp 70 states while observing fault, by the content in conjunction with servicing manual, parameter to each test point under malfunction is measured, and holds the related law of pilot lamp 70 warnings under each fault and the data of each check point, and the maintenance personal trouble spot of finding is promptly and accurately keeped in repair.
Because the air conditioning simulation equipment of the utility model embodiment is also provided with for connecting output interface and the slot of the load of air-conditioning, can carry out replacement test to corresponding components and parts on air-conditioning, to detect the quality of components and parts.The components and parts of suspecting fault are directly inserted in the corresponding slot of teaching appliance, get final product real-time testing components and parts quality, help to determine whether components and parts exist fault, also can improve the efficiency of maintenance.
Because the present function of convertible frequency air-conditioner is more and more, brought more facility to our life.But whenever new function is out time, after sale all suffer from and do not have a kind of simple approach directly perceived to remove to obtain running status and the method for maintaining of this new function.Air conditioning simulation equipment by the utility model embodiment can easily simulate various running statuses, and convenient personnel are after sale to the assurance of new function and debugging, and the parameters of new function.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (10)

1. an air conditioning simulation equipment, is characterized in that, comprising:
Fault simulation components and parts, for simulating the fault of the corresponding components and parts of air-conditioning; And
Breakdown switch, is connected with described fault simulation components and parts, and described breakdown switch has to be made first mode of operation of described fault simulation components and parts in normal condition and makes described fault simulation components and parts in malfunction the second mode of operation.
2. air conditioning simulation equipment according to claim 1, it is characterized in that, described fault simulation components and parts comprise Fisrt fault analog component and the second fault simulation components and parts, described breakdown switch comprise for simulate described air-conditioning the first components and parts fault Fisrt fault switch and for simulating fault second breakdown switch of the second components and parts of described air-conditioning, wherein:
Described Fisrt fault switch is connected with described Fisrt fault analog component,
Described the second breakdown switch is connected with described Fisrt fault analog component.
3. air conditioning simulation equipment according to claim 1, is characterized in that, also comprises:
Mainboard;
Wherein, described fault simulation components and parts and described breakdown switch are all arranged on described mainboard, and described mainboard, described fault simulation components and parts and described breakdown switch adopt distributed arrangement.
4. air conditioning simulation equipment according to claim 3, is characterized in that, also comprises:
Adjustable resistance, is connected with described mainboard, for coming analog temperature to change by adjusting resistance; And
Governor motion, is connected with described adjustable resistance, for regulating the resistance of described adjustable resistance.
5. air conditioning simulation equipment according to claim 3, is characterized in that, also comprises:
On described mainboard, be provided with slot,
Wherein, described fault simulation components and parts and described breakdown switch are arranged on described mainboard by described slot.
6. air conditioning simulation equipment according to claim 5, is characterized in that, also comprises:
Testing agency, is connected with described slot, for detecting inserting the fault simulation components and parts of described slot.
7. air conditioning simulation equipment according to claim 6, is characterized in that, described testing agency is frequency conversion detector, and described frequency conversion detector is for detecting in real time service data and the fault of described air conditioning simulation equipment.
8. air conditioning simulation equipment according to claim 3, is characterized in that, also comprises:
Output interface, is arranged on described mainboard, for connecting the load of described air-conditioning.
9. air conditioning simulation equipment according to claim 8, is characterized in that, described load comprises compressor, inner blower, outer blower fan, four-way valve and expansion valve,
Wherein, described output interface comprises compressor output interface, inner blower output interface, outer blower fan output interface, four-way valve output interface and expansion valve output interface.
10. air conditioning simulation equipment according to claim 1 and 2, is characterized in that, also comprises:
Pilot lamp, is connected with described fault simulation components and parts, and described pilot lamp comprises and is used to indicate first show state of described fault simulation components and parts in normal condition and be used to indicate described fault simulation components and parts in malfunction the second show state.
CN201320744784.XU 2013-11-21 2013-11-21 Air-conditioner simulation equipment Expired - Fee Related CN203587368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320744784.XU CN203587368U (en) 2013-11-21 2013-11-21 Air-conditioner simulation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320744784.XU CN203587368U (en) 2013-11-21 2013-11-21 Air-conditioner simulation equipment

Publications (1)

Publication Number Publication Date
CN203587368U true CN203587368U (en) 2014-05-07

Family

ID=50585271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320744784.XU Expired - Fee Related CN203587368U (en) 2013-11-21 2013-11-21 Air-conditioner simulation equipment

Country Status (1)

Country Link
CN (1) CN203587368U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104655437A (en) * 2013-11-21 2015-05-27 珠海格力电器股份有限公司 Air conditioner simulation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104655437A (en) * 2013-11-21 2015-05-27 珠海格力电器股份有限公司 Air conditioner simulation device

Similar Documents

Publication Publication Date Title
CN102692066B (en) Fault diagnosis control system for variable-frequency air conditioner and control method of fault diagnosis control system
CN105845002B (en) A kind of low-voltage distribution transformer platform district failure simulation device
CN102809967A (en) Automatic detection method for control panel of air-conditioning indoor unit
CN101986371B (en) Computer-aided overhaul simulation system for large and medium refrigeration and air-conditioning engineering
CN102194364B (en) Teaching training table for alternating-current variable-frequency multi-unit air conditioning unit
CN207198255U (en) A kind of power supply changeover device batch aging test device
CN203587368U (en) Air-conditioner simulation equipment
CN104655437A (en) Air conditioner simulation device
CN102184672B (en) Digital vortex multi-connected air conditioner refrigerating system teaching training station
CN202075911U (en) Alternating-current variable-frequency multi-connected air conditioning unit teaching training platform
CN201667145U (en) Automobile air conditioner system teaching and practical training platform
CN103473979A (en) Teaching practical training platform for air conditioner comprehensive performance test
Chen et al. Using weather and schedule based pattern matching and feature based PCA for whole building fault detection—Part II field evaluation
CN102331069A (en) Machine room air conditioner control system with simulation instrument
CN112906180B (en) Electrical performance simulation equipment
CN1330973C (en) Experimental installation for failure diagnosis of air conditioner control circuit
CN103915004A (en) Aircraft station simulation training practical operation system
CN203746272U (en) Radio station simulated training system architecture
CN203503231U (en) Teaching and practical training platform for air conditioner comprehensive performance test
CN209070084U (en) A kind of electrical part test macro
CN207249938U (en) A kind of air-conditioning installs teaching demonstration platform
CN201221828Y (en) Air conditioner fault alarming circuit
CN219531131U (en) Personnel checking device for air conditioner electrical cabinet faults
CN104567927B (en) A kind of airborne laser inertial navigation equipment failure is collected and reliability estimation method
CN104091510B (en) A kind of domestic air conditioning microcomputerized control technological synthesis exercise equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140507

Termination date: 20211121