CN203586778U - Fuel gas heating mantle - Google Patents

Fuel gas heating mantle Download PDF

Info

Publication number
CN203586778U
CN203586778U CN201320606555.1U CN201320606555U CN203586778U CN 203586778 U CN203586778 U CN 203586778U CN 201320606555 U CN201320606555 U CN 201320606555U CN 203586778 U CN203586778 U CN 203586778U
Authority
CN
China
Prior art keywords
fuel gas
burner
hot air
furnace shell
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320606555.1U
Other languages
Chinese (zh)
Inventor
刘玉其
刘勇
申正龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU TAISHENG INDUSTRIAL FURNACE Co Ltd
Original Assignee
JIANGSU TAISHENG INDUSTRIAL FURNACE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU TAISHENG INDUSTRIAL FURNACE Co Ltd filed Critical JIANGSU TAISHENG INDUSTRIAL FURNACE Co Ltd
Priority to CN201320606555.1U priority Critical patent/CN203586778U/en
Application granted granted Critical
Publication of CN203586778U publication Critical patent/CN203586778U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Air Supply (AREA)

Abstract

The utility model relates to a fuel gas heating mantle. The heating mantle comprises a furnace cover, a furnace lining, a furnace shell, a hot air pipeline, an air connecting pipe, a combustion device, a conduit, a fuel gas connecting pipe, a fuel gas pipeline, a seal ring, a support, a quick coupling, a connecting hose, a waste gas pipeline, a combustion-supporting fan, a valve connecting pipe and a preheater, wherein the valve connecting pipe is provided with a plurality of valves, and the fuel gas connecting pipe is provided with a switch. According to the heating mantle, the combustion ratio of fuel gas can be increased by blasting due to the combustion-supporting fan, so that the combustion ratio of the combustion device can be improved; in addition, the losing of the heat quantity in a hot air transmitting process can be reduced by the reasonable layout of the hot air pipeline; and the fuel gas supply can be cut off due to the fact that the switch is arranged on the fuel gas connecting pipe, so that the heating can be conveniently stopped. The fuel gas heating mantle provided by the utility model is simple in structure and convenient to use.

Description

Gas heating cover
Technical field
The utility model relates to bell furnace field, specifically gas heating cover.
Background technology
Bell furnace refers to that body of heater is a cover, or furnace bottom is motionless, and bonnet moves, or bonnet is motionless, the heat-treatment furnace that furnace bottom moves.Bell furnace is used for the annealing in process of steel wire, steel pipe, copper strips, copper cash and the silicon steel sheet etc. of metallurgy industry.Wherein copper strips is mainly applicable to the heat treatment of the materials such as brass band, bronze band, section copper strip, copper belt.
The case of bell furnace is welded by steel plate and shaped steel, and inside is furnace lining, and heater (heating or fuel burner nozzle) is arranged in burner hearth around on wall.Table is provided with two guide upright posts, is convenient to case and installs, and according to Technology for Heating Processing, requires difference to protect by different atmosphere.General gas heating cover, cooling dome, table, inner cover and corresponding cooling, evacuation system composition.For improving the quality of products and annealing cycle shortening, inner cover is identical with table quantity, and heating mantles is generally many 1 of the half of table quantity, and cooling dome is table quantity half left and right.Bell furnace batch is large, and temperature uniformity requires high, and forced convertion fan is set, and carries out furnace atmosphere circulation.
Heating mantles on market is mostly electrothermal, seldom be designed to combustion type, because electric formula heating energy consumption is higher, more and more by client, do not accepted, but replace owing to there is no the gas bell-type furnace that reliability is higher, so client still uses old-fashioned electric heating bell furnace mostly, at present, energy consumption low, maintenance cost few, efficiency high combustion type heating mantles high less than reliability also.
Utility model content
The utility model, just for above technical problem, provides the combustion type that reliability is high, energy consumption is low, maintenance cost is few, efficiency is high heating mantles.
For achieving the above object, the technical solution adopted in the utility model is:
Gas heating cover, comprise bell, furnace lining, furnace shell, hot air duct, air tube connector, burner, penetration pipe, gas connection pipe, gas pipeline, sealing ring, bearing, snap joint, connecting hose, exhaust piping, combustion fan, valve tube connector, preheater, it is characterized in that furnace shell is arranged on bearing, furnace shell top is provided with bell, furnace shell lower seat inner side is provided with sealing ring, furnace shell inside is provided with furnace lining, preheater is arranged on furnace shell one side, preheater one side arranges exhaust piping, preheater opposite side is connected with hot air duct by valve tube connector, hot air duct below is connected with burner by air tube connector, between hot air duct and burner, penetration pipe is set, burner below arranges gas pipeline, between burner and gas pipeline, by gas connection pipe, be connected, connecting hose is set on gas pipeline, snap joint is set in connecting hose, furnace shell below burner isometry position arranges combustion fan.Multiple valves are set on valve tube connector.Switch is set on gas connection pipe.
Because the utility model is provided with combustion fan, can increase fuel gas buring rate by air blast, thereby improve burner efficiency of combustion, in addition, by the rational deployment to hot air duct, reduced the heat loss in hot blast transport process.And on gas connection pipe, be provided with switch, and can cut off gas supply, conveniently stop heating.
The utility model is simple in structure, easy to use.
Accompanying drawing explanation
In accompanying drawing, Fig. 1 is the utility model structural representation, wherein:
1-bell, 2-furnace lining, 3-furnace shell, 4-hot air duct, 5-air tube connector, 6-burner, 7-penetration pipe, 8-gas connection pipe, 9-gas pipeline, 10-sealing ring, 11-bearing, 12-snap joint, 13-connecting hose, 14-exhaust piping, 15-combustion fan, 16-valve tube connector, 17-preheater.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is further described:
Gas heating cover, comprises bell 1, furnace lining 2, furnace shell 3, hot air duct 4, air tube connector 5, burner 6, penetration pipe 7, gas connection pipe 8, gas pipeline 9, sealing ring 10, bearing 11, snap joint 12, connecting hose 13, exhaust piping 14, combustion fan 15, valve tube connector 16, preheater 17, it is characterized in that furnace shell 3 is arranged on bearing 11, furnace shell 3 lower seat 11 inner sides are provided with sealing ring 10, furnace shell 3 tops are provided with bell 1, furnace shell 3 inside are provided with furnace lining 2, preheater 17 is arranged on furnace shell 3 one sides, preheater 17 1 sides arrange exhaust piping 14, preheater 17 opposite sides are connected with hot air duct 4 by valve tube connector 16, hot air duct 4 belows are connected with burner 6 by air tube connector 5, between hot air duct 4 and burner 6, penetration pipe 7 is set, burner 6 belows arrange gas pipeline 9, between burner 6 and gas pipeline 9, by gas connection pipe 8, be connected, connecting hose 13 is set on gas pipeline 9, snap joint 12 is set in connecting hose 13, furnace shell 3 below burner isometry positions arrange combustion fan 15.Multiple valves are set on valve tube connector 16.On gas connection pipe 8, switch is set.
Because the utility model is provided with combustion fan 15, can increase fuel gas buring rate by air blast, thereby improve burner 6 efficiencies of combustion, in addition, by the rational deployment to hot air duct 4, reduced the heat loss in hot blast transport process.And be provided with switch on gas connection pipe 8, and can cut off gas supply, conveniently stop heating.
The utility model is simple in structure, easy to use.

Claims (3)

1. gas heating cover, comprise bell, furnace lining, furnace shell, hot air duct, air tube connector, burner, penetration pipe, gas connection pipe, gas pipeline, sealing ring, bearing, snap joint, connecting hose, exhaust piping, combustion fan, valve tube connector, preheater, it is characterized in that furnace shell is arranged on bearing, furnace shell top is provided with bell, furnace shell lower seat inner side is provided with sealing ring, furnace shell inside is provided with furnace lining, preheater is arranged on furnace shell one side, preheater one side arranges exhaust piping, preheater opposite side is connected with hot air duct by valve tube connector, hot air duct below is connected with burner by air tube connector, between hot air duct and burner, penetration pipe is set, burner below arranges gas pipeline, between burner and gas pipeline, by gas connection pipe, be connected, connecting hose is set on gas pipeline, snap joint is set in connecting hose, furnace shell below burner isometry position arranges combustion fan.
2. gas heating cover according to claim 1, is characterized in that, on described valve tube connector, multiple valves are set.
3. gas heating cover according to claim 1, is characterized in that, on described gas connection pipe, switch is set.
CN201320606555.1U 2013-09-29 2013-09-29 Fuel gas heating mantle Expired - Fee Related CN203586778U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320606555.1U CN203586778U (en) 2013-09-29 2013-09-29 Fuel gas heating mantle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320606555.1U CN203586778U (en) 2013-09-29 2013-09-29 Fuel gas heating mantle

Publications (1)

Publication Number Publication Date
CN203586778U true CN203586778U (en) 2014-05-07

Family

ID=50584686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320606555.1U Expired - Fee Related CN203586778U (en) 2013-09-29 2013-09-29 Fuel gas heating mantle

Country Status (1)

Country Link
CN (1) CN203586778U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112460593A (en) * 2020-11-25 2021-03-09 湖南华菱涟源钢铁有限公司 Gas system of heating cover of cover type furnace and operation method thereof
CN112460987A (en) * 2020-11-25 2021-03-09 湖南华菱涟源钢铁有限公司 Heating cover of bell-type furnace and operation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112460593A (en) * 2020-11-25 2021-03-09 湖南华菱涟源钢铁有限公司 Gas system of heating cover of cover type furnace and operation method thereof
CN112460987A (en) * 2020-11-25 2021-03-09 湖南华菱涟源钢铁有限公司 Heating cover of bell-type furnace and operation method
CN112460987B (en) * 2020-11-25 2023-11-07 湖南华菱涟源钢铁有限公司 Bell-type furnace heating mantle and operation method

Similar Documents

Publication Publication Date Title
CN103836788A (en) Surrounding blowing-in integrated gas hot blast stove
CN203586778U (en) Fuel gas heating mantle
CN202216562U (en) Tube furnace waste heat utilization device
CN202393252U (en) Hot air curtain seal device
CN205455624U (en) Automatic thermal compensation system of curing of solar energy
CN201751402U (en) Residual-heat utilization device of float glass annealing kiln
CN102401561A (en) Energy-saving chamber-type heating furnace
CN103697584A (en) Full-automatic direct gas-fired hot blast heating furnace
CN205102589U (en) Energy -concerving and environment -protective steel stove that pushes away of soft bao gaofeng of syllogic
CN201901688U (en) Thermal-storage efficient protective-atmosphere heat-treatment furnace
CN2816670Y (en) Water heater capable insulating high-temperature air
CN205641524U (en) Improve warm air oil furnace of structure
CN202024602U (en) Novel gas pipe type furnace
CN202329076U (en) Efficient batch type heating furnace
CN202329075U (en) Energy-saving chamber heating furnace
CN208458526U (en) Novel heat exchange formula holding furnace
CN202692045U (en) Novel combustion heating device
CN202648437U (en) Trolley-type air intake system of burning air heat treatment furnace
CN204039053U (en) A kind of ammonia destruction furnace
CN203857810U (en) Efficient heating furnace
CN202546808U (en) High-efficiency air preheater used for CO incinerator
CN105241235A (en) Three-segment soft package high-air energy-saving and environment-friendly pusher-type furnace
CN202182642U (en) Air cooling system of isothermal positive fire line air cooling chamber
CN104101085A (en) Ring and plate compound superconducting hot air generator
CN104634120A (en) Kiln head air-intake duct used for cement production waste heat power generation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140507

Termination date: 20160929