CN203583741U - Combined main keel part - Google Patents

Combined main keel part Download PDF

Info

Publication number
CN203583741U
CN203583741U CN201320736711.6U CN201320736711U CN203583741U CN 203583741 U CN203583741 U CN 203583741U CN 201320736711 U CN201320736711 U CN 201320736711U CN 203583741 U CN203583741 U CN 203583741U
Authority
CN
China
Prior art keywords
keel
main joist
hoisting
main keel
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320736711.6U
Other languages
Chinese (zh)
Inventor
戚建权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Limited by Share Ltd building materials
Original Assignee
GUANGZHOU GOLDKINGS BUILDING MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU GOLDKINGS BUILDING MATERIAL Co Ltd filed Critical GUANGZHOU GOLDKINGS BUILDING MATERIAL Co Ltd
Priority to CN201320736711.6U priority Critical patent/CN203583741U/en
Application granted granted Critical
Publication of CN203583741U publication Critical patent/CN203583741U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model provides a combined main keel part. The combined main keel part is characterized by comprising two main keel mounting parts, a back plate and a hoisting keel. The upper portion of the back plate is connected with the hoisting keel, and the lower portion of the back plate is connected with the two main keel mounting parts. The two main keel mounting parts are symmetrically arranged side by side in a spaced mode. A hoisting sliding chute and a hoisting part corresponding to the hoisting sliding chute are arranged in the middle of the upper surface of the hoisting keel. Through the adoption of the structure, the combined main keel part is provided with a combined part formed by two side-by-side main keel mounting parts; in the operating process, the hoisting part on the hoisting keel is directly connected with a suspension bar, and consequently installation and location of two main keels in parallel can be achieved conveniently and easily; the combined main keel part is convenient and fast to install, improves installation work efficiency and is especially applicable to installation and location of the two overlong main keels in parallel. Electrostatic powder is arranged on the outer layer, so the combined main keel part is good in bearing capacity, can prevent static electricity and is especially applicable to ceilings in the places such as large squares, hospitals and factories.

Description

A kind of combination main joist part
Technical field
The novel one combination main joist part that relates to a kind of furred ceiling structure, particularly a kind of convenient construction operation, simplifies installation positioning process of this reality.
Background technology
Furred ceiling now, all adopt suspension rod to be connected with keel, ceiling is installed after connection again to be formed, the keel pattern of supplying on market is a lot, and suspension rod generally adopts hanging piece to connect with being connected of keel, during connection, by hanging piece one end, be connected with suspension rod, the other end is connected with keel, in some furred ceiling designs, have is much to adopt two main joist mounting structures arranged side by side, when furred ceiling implementation and operation, need to determine that one by one position just can complete integrated ceiling structure to keel arranged side by side, for the installation arranged side by side of two main joists of overlength degree, in actual installation process, construction intensity more strengthens, be unfavorable for implementation and operation.
Summary of the invention
For the ease of the installation of two main joist parallel constructions, improve implementation result is installed, the utility model provides a kind of combination main joist part, it is characterized in that: comprise two main joist installed parts, backboard, lifting keel, by connecing lifting keel on backboard, under connect two main joist installed parts, two described main joist installed parts are that symmetrical parallel is arranged and formed, and are provided with hanging piece chute and the hanging piece corresponding with chute in the middle of described lifting top of keel.
On described backboard, be also provided with two and consolidate bar, described two two ends of consolidating bar and being located at respectively hanging piece chute.
Described hanging piece is provided with hole for hoist.
Described main joist installed part be a kind of and main joist connect be medium altitude groove shape.
Described main joist installed part, backboard, lifting keel, consolidate bar surface and be respectively equipped with one deck electrostatic powder.
Adopt after said structure, there is the composite member that two main joists are side by side installed, when implementation and operation, hanging piece on lifting keel is directly connected with suspension rod, not only convenient but also simple realization two main keel installation and location arranged side by side, convenient and swift during installation, improved installation work efficiency, be specially adapted to installation arranged side by side and the location of two main joists of overlength degree.Skin is provided with electrostatic powder, and bearing capacity is good, prevents the generation of static simultaneously, is specially adapted to the local furred ceiling such as large-scale square, hospital, factory and uses.
This practical new construction is simple, has improved practicality, convenience and the validity of product.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
In figure, be denoted as: 1 main joist installed part, 2 backboards, 3 lifting keel, 4 are consolidated bar, 31 hanging piece chutes, 32 hanging pieces, 321 holes for hoist.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the utility model title is described in further detail, but does not form any restriction of the present utility model.
As shown in Figure 1:
A kind of combination main joist part, it is characterized in that: comprise two main joist installed parts 1, backboard 2, lifting keel 3, by connecing lifting keel 3 on backboard 2, under connect two main joist installed parts 1, described two know that main joist installed part 1 is that symmetrical parallel is arranged and formed, and described lifting keel 3 are provided with hanging piece chute 31 and the hanging piece 32 corresponding with chute 31 above.
As the further improvement of technology, on described backboard 2, be also provided with two and consolidate bar 4, described two two ends of consolidating bar 4 and being located at respectively hanging piece chute 31 when playing consolidation, prevent that hanging piece 32 from skidding off chute 31 simultaneously.
As the further improvement of technology, described hanging piece 32 is provided with hole for hoist 321, and directly convenient and hanger erection is fixed.
As the further improvement of technology, described main joist installed part 1 be a kind of and main joist connect be medium altitude groove shape so that joining to extending and installing of main joist is all generally to adopt screw to be fixedly connected with.
As the further improvement of technology, described main joist installed part 1, backboard 2, lifting keel 3, consolidate bar 4 surfaces and be respectively equipped with one deck electrostatic powder, to prevent the generation of static.
Adopt after said structure, there is the composite member that two main joists are side by side installed, when implementation and operation, hanging piece 32 on lifting keel 3 is directly connected with suspension rod, not only convenient but also simple realization two main keel installation and location arranged side by side, convenient and swift during installation, improved installation work efficiency, be specially adapted to installation arranged side by side and the location of two main joists of overlength degree.Skin is provided with electrostatic powder, and bearing capacity is good, prevents the generation of static simultaneously, is specially adapted to the local furred ceiling such as large-scale square, hospital, factory and uses.
This practical new construction is simple, has improved practicality, convenience and the validity of product.

Claims (5)

1. a combination main joist part, it is characterized in that: comprise two main joist installed parts (1), backboard (2), lifting keel (3), by connecing lifting keel (3) on backboard (2), under connect two main joist installed parts (1), described two main joist installed parts (1) are that symmetrical parallel arrangement forms, and described lifting keel (3) are provided with hanging piece chute (31) and the hanging piece (32) corresponding with hanging piece chute (31) above.
2. a kind of combination main joist part according to claim 1, is characterized in that: on described backboard (2), be also provided with two and consolidate bar (4), described two two ends of consolidating bar (4) and being located at respectively hanging piece chute (31).
3. one combines main joist part according to claim 1, it is characterized in that: described hanging piece (32) is provided with hole for hoist (321).
4. a kind of combination main joist part according to claim 1, is characterized in that: described main joist installed part (1) be a kind of and main joist connect be medium altitude groove shape.
5. a kind of combination main joist part according to claim 1, is characterized in that: described main joist installed part (1), backboard (2), lifting keel (3), consolidate bar (4) surface and be respectively equipped with one deck electrostatic powder.
CN201320736711.6U 2013-11-19 2013-11-19 Combined main keel part Expired - Fee Related CN203583741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320736711.6U CN203583741U (en) 2013-11-19 2013-11-19 Combined main keel part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320736711.6U CN203583741U (en) 2013-11-19 2013-11-19 Combined main keel part

Publications (1)

Publication Number Publication Date
CN203583741U true CN203583741U (en) 2014-05-07

Family

ID=50581681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320736711.6U Expired - Fee Related CN203583741U (en) 2013-11-19 2013-11-19 Combined main keel part

Country Status (1)

Country Link
CN (1) CN203583741U (en)

Similar Documents

Publication Publication Date Title
CN203583741U (en) Combined main keel part
CN203583745U (en) Main keel cross-shaped connecting piece
CN202390996U (en) Lifting hook for connecting integrated suspended ceiling with keel
CN202390988U (en) Detachable cross-shaped disc type keel structure
CN203583743U (en) Main keel L-shaped connecting piece
CN203583746U (en) Main keel T-shaped connecting piece
CN204590657U (en) Formwork bracing system
CN208501912U (en) A kind of modular cabinet bottom beam mounting structure
CN202017259U (en) Large-span steel structure aseismatic support
CN205297165U (en) Aerated concrete window wrap panel fixed establishment's lower structure
CN209339512U (en) It is a kind of to resist the strong high stability assembled floor-board main body of gravity performance
CN203462700U (en) Keel for outdoor floor
CN203684489U (en) Multi-point adjusting disc
CN202064594U (en) Novel floor pad
CN203441017U (en) Multifunctional passage
CN202500298U (en) Overhead pavement structure
CN202450655U (en) Integral precast-concrete outer wall board
CN203022202U (en) Keel lifting piece
CN203008293U (en) Wall-hung board
CN203742119U (en) Wallboard pendant
CN202227651U (en) Composite floor
CN202831205U (en) Supporting arranging mechanism
CN205604740U (en) Three -dimensional interfacing apparatus of shaped steel case roof beam
CN202706257U (en) Gypsum wall unit with light keels additionally with H-shaped steels
CN207419948U (en) A kind of solid wooden compound floor of easy care

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 510000 Guangdong city of Guangzhou province Liwan District Wenchang South Road No. 21 South Street underground Bauer

Patentee after: Guangzhou Limited by Share Ltd building materials

Address before: 510000 Guangdong city of Guangzhou province Liwan District Wenchang South Road No. 21 South Street underground Bauer

Patentee before: GUANGZHOU GOLDKINGS BUILDING MATERIAL CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140507

Termination date: 20161119

CF01 Termination of patent right due to non-payment of annual fee