CN203579094U - Support structure for inner aligning device of cement layer of pipeline inner wall - Google Patents
Support structure for inner aligning device of cement layer of pipeline inner wall Download PDFInfo
- Publication number
- CN203579094U CN203579094U CN201320365194.6U CN201320365194U CN203579094U CN 203579094 U CN203579094 U CN 203579094U CN 201320365194 U CN201320365194 U CN 201320365194U CN 203579094 U CN203579094 U CN 203579094U
- Authority
- CN
- China
- Prior art keywords
- support
- bearing
- internal clamp
- locking
- wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Clamps And Clips (AREA)
Abstract
The utility model discloses a support structure for an inner aligning device of a cement layer of pipeline inner wall, which relates to the technical field of generators. The support structure comprises an inner aligning device, having a front running gear and a rear running gear. A front support structure disposed at the front part of the front running gear is fixed to the head part of the inner aligning device, and a rear support structure disposed at the front part of the rear running gear is fixed to the tail part of the inner aligning device. The front support mechanism comprises a locking adjustment mechanism which adjusts the space with the rear support mechanism. The support structure for an inner aligning device of a cement layer of pipeline inner wall is advantageous in that the error of the thickness of a cement lining layer can be effectively removed; a front road wheel and a rear road wheel can be prevented from being stuck in the position of a welding joint, and thereby the front running gear and the rear running gear can be ensured to successfully pass the welding joint.
Description
Technical field
The utility model relates to technical field of generators, relates in particular to a kind of supporting construction of the internal clamp for the moisture mud layer of inner-walls of duct.
Background technology
At present, the docking welding of pipeline, be generally the port docking welding of two pipes, due to the pipeline with concrete lining not in pipeline, in weld bond position, there is a segment distance there is no lining, so after welding completes, during internal clamp walking, pre-walking mechanism and rear walking mechanism can be absorbed in does not have the port of concrete lining docking weld bond position.
Summary of the invention
In order to overcome the deficiency in background technology, the utility model provides a kind of supporting construction of the internal clamp for the moisture mud layer of inner-walls of duct.This supporting construction can make the front and back walking mechanism of internal clamp smoothly by weld bond position.
In order to realize foregoing invention object, the utility model adopts technical scheme as follows:
A kind of supporting construction of the internal clamp for the moisture mud layer of inner-walls of duct, comprise: internal clamp, two walking mechanisms on described internal clamp, comprise: pre-walking mechanism 4, rear walking mechanism 3, the front support mechanism 6 that the front of described pre-walking mechanism 4 arranges is fixed on the head of internal clamp, the rear support mechanism 1 that the front of rear walking mechanism 3 arranges is fixed on the afterbody of internal clamp, and wherein front support mechanism 6 has the locking guiding mechanism of adjusting with rear support mechanism 1 spacing.
A kind of supporting construction of the internal clamp for the moisture mud layer of inner-walls of duct, described front support mechanism 6, comprise: bracing frame 6.5, support wheel, support frame as described above upper end is fixedly connected on the gas tank 6.19 of internal clamp head by clamping screw 6.1, locking nut 6.2; Support frame as described above 6.5 lower ends are fixed by wheel shaft and support wheel; Support wheel by bearing 6.11, bearing outside 6.15, bearing holder (housing, cover) 6.16, bearing gland 6.8, bearing pin 6.9, bearing nut 6.10 and connect to form with foreign steamer 6.17.
A kind of supporting construction of the internal clamp for the moisture mud layer of inner-walls of duct, described rear support mechanism 1 comprises: bracing frame 1.5, support wheel, and support frame as described above upper end is fixedly connected on the gas tank 1.19 of internal clamp head by clamping screw 1.1, locking nut 1.2; Support frame as described above 1.5 lower ends are fixed by wheel shaft and support wheel; Support wheel by bearing 1.11, bearing outside 1.15, bearing holder (housing, cover) 1.16, bearing gland 1.8, bearing pin 1.9, bearing nut 1.10 and connect to form with foreign steamer 1.17.
A kind of supporting construction of the internal clamp for the moisture mud layer of inner-walls of duct, described locking guiding mechanism is comprised of support locking mechanism 7 and support guiding mechanism 8, described support locking mechanism 7 is connected and composed by clamping screw and bracing frame locking silk hole, and described support guiding mechanism 8 connects and composes by adjusting bolt and bracing frame adjustment silk hole.
Owing to adopting technical scheme as above, the utlity model has following superiority:
A kind of supporting construction of the internal clamp for the moisture mud layer of inner-walls of duct, to have increased after front support mechanism and rear support mechanism, when pre-walking mechanism moves to weld bond position, because the support of front support mechanism and rear walking mechanism has been avoided front walking wheel and is absorbed in position, Hankow; When rear walking mechanism moves to position, Hankow, because the support of pre-walking mechanism and rear support mechanism has been avoided equally rear walking wheel and is absorbed in position, Hankow, thereby make mouthpart smoothly by there is no the weld bond position of concrete lining.
[accompanying drawing explanation]
Fig. 1 is the supporting construction schematic diagram of internal clamp:
Fig. 2 is the structural representation of the front support mechanism of internal clamp;
Fig. 3 is the structural representation of the rear support mechanism of internal clamp;
In figure: 1. rear support mechanism, be 2. with concrete lining pipeline, 3. rear walking mechanism, 4. pre-walking mechanism, 5. position, pipeline Hankow, 6. front support mechanism, 7. support locking mechanism, 8. supports guiding mechanism.
1., clamping screw 2., locking nut 3., nut 1 4., spring shim 1 5., bracing frame
6., bearing hold-down bolt 7., bearing compress gasket 8., bearing gland 9., bearing pin 10., bearing nut (11), bearing (12) nut 2 (13) spring shim 2 (14) the pipeline with concrete lining (15) bearing holder (housing, cover) 1 (16) bearing holder (housing, cover) 2 (17) support wheel (18) adjust (19) forebay of bolt;
1., clamping screw 2., locking nut 3., nut 1 4., spring shim 1 5., bracing frame
6., bearing hold-down bolt 7., bearing compress gasket 8., bearing gland 9., bearing pin 10., bearing nut (11), bearing (12) nut 2 (13) spring shim 2 (14) the pipeline with concrete lining (15) bearing holder (housing, cover) 1 (16) bearing holder (housing, cover) 2 (17) support wheel (18) adjust (19) gas tank of bolt;
[specific embodiment]
As shown in Figure 1, 2, 3, a kind of supporting construction of the internal clamp that is adapted to the moisture mud layer of inner-walls of duct, comprise: internal clamp, two walking mechanisms on described internal clamp, comprise: pre-walking mechanism 4, rear walking mechanism 3, the front support mechanism 6 that the front of described pre-walking mechanism 4 arranges is fixed on the head of internal clamp, the rear support mechanism 1 that the front of rear walking mechanism 3 arranges is fixed on the afterbody of internal clamp, and wherein front support mechanism 6 has the locking guiding mechanism of adjusting with rear support mechanism 1 spacing.
Described front support mechanism 6, comprising: bracing frame 6.5, support wheel, and support frame as described above upper end is fixedly connected on the gas tank 6.19 of internal clamp head by clamping screw 6.1, locking nut 6.2; Support frame as described above 6.5 lower ends are fixed by wheel shaft and support wheel; Support wheel by bearing 6.11, bearing outside 6.15, bearing holder (housing, cover) 6.16, bearing gland 6.8, bearing pin 6.9, bearing nut 6.10 and connect to form with foreign steamer 6.17.
Described rear support mechanism 1 comprises: bracing frame 1.5, support wheel, and support frame as described above upper end is fixedly connected on the gas tank 1.19 of internal clamp head by clamping screw 1.1, locking nut 1.2; Support frame as described above 1.5 lower ends are fixed by wheel shaft and support wheel; Support wheel by bearing 1.11, bearing outside 1.15, bearing holder (housing, cover) 1.16, bearing gland 1.8, bearing pin 1.9, bearing nut 1.10 and connect to form with foreign steamer 1.17.
Described locking guiding mechanism is comprised of support locking mechanism 7 and support guiding mechanism 8, and described support locking mechanism 7 is connected and composed by clamping screw and a bracing frame locking silk hole, and described support guiding mechanism 8 connects and composes by adjusting bolt and bracing frame adjustment silk hole.
For a method for supporting for inner-walls of duct lining internal clamp, its step is as follows:
1, when the docking welding of two pipe ports is complete, in the time of need to carrying out the docking welding of next two pipe ports, start pre-walking mechanism 4 and the rear walking mechanism 3 of the internal clamp of the moisture mud layer of inner-walls of duct, internal clamp moves ahead;
2, when the pre-walking mechanism 4 of internal clamp runs into while there is no the port of concrete lining docking weld bond position, the front support mechanism 6 of internal clamp head, has been supported on inner-walls of duct lining, and the rear walking mechanism 3 of internal clamp drives internal clamp to move ahead;
3, when the rear walking mechanism 3 of internal clamp runs into while there is no the port of concrete lining docking weld bond position, the rear support mechanism 1 at internal clamp rear portion, is still supported on inner-walls of duct lining, and the pre-walking mechanism 4 of internal clamp drives internal clamp to move ahead;
4, final, rear support mechanism 1 crosses over does not have the port of concrete lining docking weld bond position, thereby makes internal clamp smoothly by there is no the weld bond position of concrete lining.
Due in pipeline or not with concrete lining in weld bond position, have a segment distance there is no lining, so after welding completes internal clamp when walking, pre-walking mechanism and rear walking mechanism can be absorbed in the position that there is no concrete lining.The present invention has increased to support and has adjusted and retaining mechanism, increases after front support mechanism and rear support mechanism, when pre-walking mechanism moves to weld bond position, because the support of front support mechanism and rear walking mechanism has been avoided front walking wheel and is absorbed in position, Hankow; When rear walking mechanism moves to position, Hankow, because the support of pre-walking mechanism and rear support mechanism has been avoided equally rear walking wheel and is absorbed in position, Hankow, thereby make mouthpart smoothly by there is no the weld bond position of concrete lining.Before and after can guaranteeing, walking mechanism, smoothly by weld bond position, has effectively been eliminated the error that concrete lining thickness exists.
Claims (4)
1. the supporting construction for the internal clamp of the moisture mud layer of inner-walls of duct, comprise: internal clamp, two walking mechanisms on described internal clamp, comprise: pre-walking mechanism (4), rear walking mechanism (3), it is characterized in that: the front support mechanism (6) that the front of described pre-walking mechanism (4) arranges is fixed on the head of internal clamp, the rear support mechanism (1) that the front of rear walking mechanism (3) arranges is fixed on the afterbody of internal clamp, and wherein front support mechanism (6) has the locking guiding mechanism of adjusting with rear support mechanism (1) spacing.
2. the supporting construction of a kind of internal clamp for the moisture mud layer of inner-walls of duct according to claim 1, it is characterized in that: described front support mechanism (6), comprise: bracing frame (6.5), support wheel, support frame as described above upper end is fixedly connected on the gas tank (6.19) of internal clamp head by clamping screw (6.1), locking nut (6.2); Support frame as described above (6.5) lower end is fixed by wheel shaft and support wheel; Support wheel is by (6.16), bearing gland (6.8), bearing pin (6.9), bearing nut (6.10) in bearing (6.11), bearing outside (6.15), bearing holder (housing, cover) and connect to form with foreign steamer (6.17).
3. the supporting construction of a kind of internal clamp for the moisture mud layer of inner-walls of duct according to claim 1, it is characterized in that: described rear support mechanism (1) comprising: bracing frame (1.5), support wheel, support frame as described above upper end is fixedly connected on the gas tank (1.19) of internal clamp head by clamping screw (1.1), locking nut (1.2); Support frame as described above (1.5) lower end is fixed by wheel shaft and support wheel; Support wheel is by (1.16), bearing gland (1.8), bearing pin (1.9), bearing nut (1.10) in bearing (1.11), bearing outside (1.15), bearing holder (housing, cover) and connect to form with foreign steamer (1.17).
4. the supporting construction of a kind of internal clamp for the moisture mud layer of inner-walls of duct according to claim 1, it is characterized in that: described locking guiding mechanism is comprised of support locking mechanism (7) and support guiding mechanism (8), described support locking mechanism (7) is connected and composed by clamping screw and bracing frame locking silk hole, and described support guiding mechanism (8) connects and composes by adjusting bolt and bracing frame adjustment silk hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320365194.6U CN203579094U (en) | 2013-06-25 | 2013-06-25 | Support structure for inner aligning device of cement layer of pipeline inner wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320365194.6U CN203579094U (en) | 2013-06-25 | 2013-06-25 | Support structure for inner aligning device of cement layer of pipeline inner wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203579094U true CN203579094U (en) | 2014-05-07 |
Family
ID=50577066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320365194.6U Expired - Fee Related CN203579094U (en) | 2013-06-25 | 2013-06-25 | Support structure for inner aligning device of cement layer of pipeline inner wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203579094U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103350307A (en) * | 2013-06-25 | 2013-10-16 | 洛阳德平机械设备有限公司 | Support method and support structure of internal aligning device for pipeline with inner wall comprising concrete lining |
-
2013
- 2013-06-25 CN CN201320365194.6U patent/CN203579094U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103350307A (en) * | 2013-06-25 | 2013-10-16 | 洛阳德平机械设备有限公司 | Support method and support structure of internal aligning device for pipeline with inner wall comprising concrete lining |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203062190U (en) | Butt joint regulation device for thick-wall boiler tube | |
CN103991391A (en) | Insulation supporting device for installing power supply rail | |
CN105499878A (en) | Directional deformation prevention low-residual stress welding fixture | |
CN203579094U (en) | Support structure for inner aligning device of cement layer of pipeline inner wall | |
CN103350307A (en) | Support method and support structure of internal aligning device for pipeline with inner wall comprising concrete lining | |
CN105065005B (en) | Curve tube coupling clamps propulsion plant | |
CN104727930A (en) | Inter-cooling pipe fixing device | |
CN201568732U (en) | Hoop bracket for installing tank body | |
CN203062189U (en) | Adjusting device for butting installation of oxygen pipeline | |
CN203092060U (en) | Oil pipe welding device | |
CN204221292U (en) | A kind of pressure lever type pipeline jig | |
CN204572182U (en) | A kind of middle cooling pipe fixing device | |
CN203471249U (en) | Tool special for steel tube butt joint alignment | |
CN204124265U (en) | Chain stay and motor bike thereof | |
CN203527074U (en) | Automobile torsion beam brake disc mounting end face milling tool | |
CN204025933U (en) | A kind of pipeline assembly based under small space state | |
CN204077997U (en) | Stern pipe is installed and is regulated support | |
CN202639699U (en) | Sea floor pipeline half-tile aligning device | |
CN201988890U (en) | Large butt welding flange installing device for piping system processing | |
CN203426297U (en) | Clamp used for bending pipe | |
CN203636291U (en) | Pipeline opening aligning device | |
CN206929431U (en) | Pipeline support, pipeline arranging structure and bow member chassis | |
CN203463799U (en) | Welding cable and pipeline fixing device | |
CN205382700U (en) | Embedded nut formula is wall spare even | |
CN103418962B (en) | Locating mechanism for inclined support when support is welded to flange of exhaust manifold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140507 Termination date: 20140625 |
|
EXPY | Termination of patent right or utility model |