CN203571790U - High-temperature probe assembly - Google Patents

High-temperature probe assembly Download PDF

Info

Publication number
CN203571790U
CN203571790U CN201320688974.4U CN201320688974U CN203571790U CN 203571790 U CN203571790 U CN 203571790U CN 201320688974 U CN201320688974 U CN 201320688974U CN 203571790 U CN203571790 U CN 203571790U
Authority
CN
China
Prior art keywords
temperature probe
slag cover
sleeve pipe
gap
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320688974.4U
Other languages
Chinese (zh)
Inventor
蔡永厚
张启运
徐勇
宋修明
何建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINLONG COPPER CO Ltd
Hefei Gold Star M & E Technical Development Co Ltd
Original Assignee
JINLONG COPPER CO Ltd
Hefei Gold Star M & E Technical Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINLONG COPPER CO Ltd, Hefei Gold Star M & E Technical Development Co Ltd filed Critical JINLONG COPPER CO Ltd
Priority to CN201320688974.4U priority Critical patent/CN203571790U/en
Application granted granted Critical
Publication of CN203571790U publication Critical patent/CN203571790U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Abstract

The utility model relates to the technical field of high-temperature probes, in particular to a high-temperature probe assembly. A through hole is formed in a furnace wall. The high-temperature probe assembly comprises an anti-slag cover and a high-temperature probe. The anti-slag cover is inserted into the through hole and detachably fixed to the furnace wall. The anti-slag cover is in a hollow shape. The high-temperature probe is inserted into the anti-slag cover. A gap is formed in the end, located inside a furnace, of the anti-slag cover so that the high-temperature probe can monitor the interior of the furnace. The end, located outside the furnace, of the anti-slag cover is movably connected with the high-temperature probe. Due to the fact that the anti-slag cover is internally provided with the high-temperature probe and arranged in the through hole of the furnace wall, the phenomenon that slags are gathered on the high-temperature probe is avoided; meanwhile, when many slags are gathered on the anti-slag cover, the anti-slag cover can be directly pushed into the furnace, and a new anti-slag cover can be arranged; compared with replacement of the high-temperature probe, the cost of the anti-slag cover is quite low.

Description

High-temperature probe assembly
Technical field
The utility model relates to high-temperature probe technical field, particularly a kind of high-temperature probe assembly.
Background technology
In electric power, building materials, petrochemical industry and each related industries field such as metallurgical, all kinds of combustion processes are of paramount importance link in the whole technological process of production often.The real time monitoring of realization to combustion process, occurs, improves safe productivity and product quality, realizes the high-efficiency and economic operation that production technology is equipped Accident prevention, has important value.Common way is: high-temperature probe is stretched in stove and monitored, by thermometric camera lens, take in real time the image in combustion furnace, then captured image is processed, analyzed.In order to guarantee the reliability of processing, analysis result, thermometric camera lens must clearly photograph the combustion position in combustion furnace.
Burning furnace inner environment is severe, stretches the easy slagging scorification of high-temperature probe part in stove, and the light path of thermometric camera lens is obstructed, and the definition of the image that collects is inevitable influenced.Existing way is that high-temperature probe is taken out and manually cleaned from stove, and there is following deficiency in this scheme: the hole size of 1, offering on furnace wall and the external diameter of high-temperature probe match, when high-temperature probe is positioned at slagging scorification that furnace interior divides when more, from furnace wall, take out comparatively difficulty of high-temperature probe; 2, clean workload is large, and all high-temperature probe parts that are positioned at stove all need to clean; 3, some slagging scorification is difficult to remove, and these slagging scorification run up to when a certain amount of, need to change high-temperature probe, and this cost is very high.
Utility model content
The purpose of this utility model is to provide a kind of high-temperature probe assembly, can effectively process slagging scorification phenomenon, guarantees that light path is unobstructed, easy to maintenance and cost is low.
For realizing above object, the technical solution adopted in the utility model is: a kind of high-temperature probe assembly, on furnace wall, be provided with through hole, this assembly comprises anti-slag cover, high-temperature probe, described anti-slag cover is inserted in described through hole, anti-slag cover is detachable being fixed on furnace wall, anti-slag cover is hollow form, high-temperature probe is inserted in anti-slag cover, described anti-slag cover is positioned at one end of stove and offers breach so that high-temperature probe is monitored stove, and one end that anti-slag cover is positioned at outside stove is connected with high-temperature probe is movable.
Compared with prior art, there is following technique effect in the utility model: owing to being provided with anti-slag cover in the through hole of high-temperature probe and furnace wall, avoided assembling the generation of slag phenomenon on high-temperature probe; Meanwhile, anti-slag cover is movable connection with furnace wall, high-temperature probe, like this, when the slag on anti-slag cover is a lot, when inconvenience is cleared up, directly anti-slag cover is pushed in stove, rearrange an anti-slag cover, compared to changing high-temperature probe, the cost of anti-slag cover is very low.The problem that the design of anti-slag cover has effectively avoided background technology part to address.
Accompanying drawing explanation
Fig. 1 is that the utility model is arranged in the structural representation on furnace wall;
Fig. 2 is fixture and furnace wall structure schematic diagram;
Fig. 3 is that anti-slag cover is by fixture and furnace wall fit structure schematic diagram;
Fig. 4 is the structural representation of high-temperature probe;
Fig. 5 a is the A-A cutaway view of Fig. 1;
Fig. 5 b is the disassembly status schematic diagram of Fig. 5 a;
Fig. 6 is the sleeve pipe side view of fixture, by watching in the export-oriented stove of stove;
Fig. 7 is slagging scorification schematic diagram outside anti-slag cover;
Fig. 8 is high-temperature probe light path porch slagging scorification schematic diagram;
Fig. 9 is first, second and third current path schematic diagram.
The specific embodiment
Below in conjunction with Fig. 1 to Fig. 9, the utility model is described in further detail.
Consult Fig. 1 to Fig. 4, a kind of high-temperature probe assembly, on furnace wall 10, be provided with through hole 11, this assembly comprises anti-slag cover 20, high-temperature probe 30, described anti-slag cover 20 is inserted in described through hole 11, anti-slag cover 20 is detachable being fixed on furnace wall 10, anti-slag cover 20 is hollow tubular, high-temperature probe 30 is inserted in anti-slag cover 20, described anti-slag cover 20 is positioned at one end of stove and offers optical transmission window 21 so that high-temperature probe 30 is monitored stove, and one end that anti-slag cover 20 is positioned at outside stove is connected with high-temperature probe 30 is movable.Here, an anti-slag cover 20 is set, be set in high-temperature probe 30 and be positioned at the outside that furnace interior divides, only offer an optical transmission window 30, like this, the most of slag producing in stove is no longer tied and is attached on high-temperature probe 30, but knot is attached on anti-slag cover 20, when the slag on anti-slag cover 20 is less, can take out anti-slag cover 20 cleans, when the slag on anti-slag cover 20 is more, because the external diameter of anti-slag cover 20 and the aperture of through hole 11 match, now inconvenience is taken out, can directly anti-slag cover 20 be pushed in stove, insert new anti-slag cover 20, compared to changing high-temperature probe 30, the cost of changing anti-slag cover 20 is much lower.
Consult Fig. 4; described high-temperature probe 30 comprises thermometric camera lens 31, is arranged on protective sleeve 32 and first air inlet 33 in thermometric camera lens 31 outsides; the first current path consists of the first air inlet 33 being interconnected, the light path of thermometric camera lens 31, optical transmission window 21; on described protective sleeve 32, be provided with air-flow through hole 321; the setting of the first current path; can the dust, the impurity that enter into light path be taken away by the effect of air-flow; can in light path, form again malleation; avoid entering of dust, impurity, thereby kept light path clean.
Consult Fig. 1, Fig. 5 a, as preferred version of the present utility model, high-temperature probe assembly comprises connector 40, and connector 40 in a tubular form, its one end is connected with high-temperature probe 30 by mounting flange, and the other end and anti-slag cover 20 are positioned at after threaded one end outside stove is connected and are screwed; On described connector 40 tube walls, be provided with the second air inlet 41 and the 3rd air inlet 42, the second air inlets 41 are connected with described air-flow through hole 321; The second current path consists of the gap, the optical transmission window 21 that form between the second air inlet 41, protective sleeve 32 and the thermometric camera lens 31 that are interconnected, and the 3rd current path consists of the gap, the optical transmission window 21 that form between the 3rd air inlet 42, anti-slag cover 20 and the protective sleeve 32 that are interconnected.The second current path is to enter in the gap forming between protective sleeve 32 and thermometric camera lens 31 for fear of dust, impurity, and the 3rd current path is to enter in the gap forming between anti-slag cover 20 and protective sleeve 32 for fear of dust, impurity.As shown in Fig. 1, Fig. 9, the flow direction of first, second and third current path is all from right to left, by what flow in the export-oriented stove of stove, what E, D in Fig. 9, F referred to respectively is exactly a section near gas outlet of first, second and third current path, and arrow is the direction of air-flow.
Why connector 40 is set here, to be convenient to arrange second and third air inlet 41,42, if second and third air inlet 41,42 is arranged on anti-slag cover 20, the structure of anti-slag cover 20 will become complicated on the one hand, is not easy on the other hand anti-slag cover 20 to push in stove and change.Be provided with after connector 40, make a just simple tubulose of anti-slag cover 20, as shown in Figure 3.Second and third air inlet 41,42 is all arranged on connector 40, and connector 40 does not need to change.
Consult Fig. 2, Fig. 6, having mentioned anti-slag cover 20 is above detachable mounting means with furnace wall 10, this mounting means can have a variety of schemes to realize, one is provided here, and comparatively preferred embodiment is as a reference: high-temperature probe assembly also comprises fixture 50, described fixture 50 comprises the sleeve pipe 51 being plugged in through hole 11, the external diameter of sleeve pipe 51 and through hole 11 apertures match, and the internal diameter of sleeve pipe 51 is slightly larger than the external diameter of anti-slag cover 20; Described sleeve pipe 51 extends to furnace wall 10 outsides from furnace wall 10 inwall places, is positioned on sleeve pipe 51 tube walls in furnace wall 10 outsides, to offer the first gap 511 and form opening shape, and the first gap 511 connects tube wall in the outer end of sleeve pipe 51 along pipe range direction and offers.Between sleeve pipe 51 and furnace wall 10, fix, sleeve pipe 51 is positioned at outside stove one section, and to be arranged to opening shape be for the ease of inserting anti-slag cover 20, when anti-slag cover 20 is plugged in sleeve pipe 51, the position that ringent sleeve pipe 51 one section of body locking is about to anti-slag cover 20 is fixed.
Further, in order to guarantee that whole assembly is not offset in the axial direction, described fixture 50 also comprises that laminating is arranged on the steel plate 52 on furnace shell 12, described sleeve pipe 51 passes in the plate face of steel plate 52, the axle core of sleeve pipe 51, perpendicular to the plate face of steel plate 52, is fixed as one between steel plate 52 and sleeve pipe 51, because steel plate 52 laminatings are arranged on furnace shell 12, the fixed effect of whole like this fixture 50 is very good, can not produce skew.
More preferably, the first described gap 511 has been arranged symmetrically with two, inwardly postpones to steel plate 52 places from the pipe end of sleeve pipe 51 in the first gap 511; The first gap 511 is postponed crossing with the mid point in the second gap 512 to one end of steel plate 52, the postpone tube wall circumferential arrangement of sleeve pipe 51 and the length in the second gap 512 of the second described gap 512 is less than the tube wall girth of half sleeve pipe 51, guarantees that two the second gaps 512 are unlikely to oversize and crossing; The sleeve pipe 51 tube wall edges that form the first gap 511 outwards arrange flange 513, are provided with the hole of passing for screw on flange 513.The setting in the second gap 512, the deformability that raising sleeve pipe 51 opening is a section, makes sleeve pipe 51 be unlikely to rupture when locking anti-slag cover 20.In addition, the setting of flange 513, makes sleeve pipe 51 itself just possess the function of locking, does not need the part that other are set to lock.
Below in conjunction with structure of the present utility model, describe its duty, regular maintenance state, inspecting state in detail:
1, duty.Device assembles: the protective sleeve of high-temperature probe 30 32 is connected on high-temperature probe 30 by three bolts; Connector 40 connects by foregoing three bolts by mounting flange and high-temperature probe 30, locks three bolts; After anti-slag cover 20 is threaded with connector 40, be screwed, prevent from circumferentially rotating.On-the-spot installation: offer through hole 11 on furnace wall 10, fixture 50 is welded and fixed; In the sleeve pipe 51 of the anti-slag cover 20 fixing, high-temperature probe 30, the whole insertion fixture 50 of connector 40, to correct position, clamp.
2, regular maintenance state.This is mainly that it safeguards that step is as follows for the slagging scorification C phenomenon shown in Fig. 8: (A1) anti-slag cover unclamps the fishbolt on sleeve pipe 51 20 service times more in short-term, and entirety is extracted maintenance; Anti-slag cover when the slagging scorification in anti-slag cover 20 outsides has had influence on extracting of anti-slag cover 20, enters next step when longer 20 service times; (B1) unclamp being connected between high-temperature probe 30 and connector 40; up push away high-temperature probe 30, in the air-flow through hole 321 that the second air inlet 41 on connector 40 is offered from protective sleeve 32, separate, as shown in Figure 5 b; then outwards extract high-temperature probe 30, clear up.
3, inspecting state.This is mainly for the slagging scorification B phenomenon in Fig. 7, and the now slagging scorification outside anti-slag cover 20 is more, has had influence on light path; Or causing anti-slag cover 20 to be out of shape, impact is used; Or expire the service life of anti-slag cover 20.Now safeguard as follows: (A2) unclamp the screw between connector 40 and anti-slag cover 20, extract high-temperature probe 30 and connector 40 out; (B2) unclamp the fishbolt on sleeve pipe 51, anti-slag cover 20 is pushed in stove, the anti-slag cover 20 of scrapping and more renewing.

Claims (6)

1. a high-temperature probe assembly, on furnace wall (10), be provided with through hole (11), it is characterized in that: this assembly comprises anti-slag cover (20), high-temperature probe (30), described anti-slag cover (20) is inserted in described through hole (11), anti-slag cover (20) is detachable being fixed on furnace wall (10), anti-slag cover (20) is hollow tubular, high-temperature probe (30) is inserted in anti-slag cover (20), described anti-slag cover (20) is positioned at one end of stove and offers optical transmission window (21) so that high-temperature probe (30) is monitored stove, anti-slag cover (20) is positioned at the one end and movable connection of high-temperature probe (30) outside stove.
2. high-temperature probe assembly as claimed in claim 1; it is characterized in that: described high-temperature probe (30) comprises thermometric camera lens (31), is arranged on protective sleeve (32) and first air inlet (33) in thermometric camera lens (31) outside; the first current path consists of light path, the optical transmission window (21) of the first air inlet (33) being interconnected, thermometric camera lens (31), on described protective sleeve (32), is provided with air-flow through hole (321).
3. high-temperature probe assembly as claimed in claim 2, it is characterized in that: high-temperature probe assembly comprises connector (40), connector (40) in a tubular form, its one end is connected with high-temperature probe (30) by mounting flange, and the other end and anti-slag cover (20) are positioned at after threaded one end outside stove is connected and are screwed; On described connector (40) tube wall, be provided with the second air inlet (41) and the 3rd air inlet (42), the second air inlet (41) is connected with described air-flow through hole (321); The second current path consists of the gap forming between the second air inlet (41) being interconnected, protective sleeve (32) and thermometric camera lens (31), optical transmission window (21), and the 3rd current path consists of the gap forming between the 3rd air inlet (42), anti-slag cover (20) and the protective sleeve (32) that are interconnected, optical transmission window (21).
4. high-temperature probe assembly as claimed in claim 2, it is characterized in that: high-temperature probe assembly also comprises fixture (50), described fixture (50) comprises the sleeve pipe (51) being plugged in through hole (11), the external diameter of sleeve pipe (51) and through hole (11) aperture match, and the internal diameter of sleeve pipe (51) is slightly larger than the external diameter of anti-slag cover (20); Described sleeve pipe (51) extends to furnace wall (10) outside from furnace wall (10) inwall place, be positioned at and on sleeve pipe (51) tube wall in furnace wall (10) outside, offer the first gap (511) and form opening shape, the first gap (511) connect tube wall in the outer end of sleeve pipe (51) along pipe range direction and offer.
5. high-temperature probe assembly as claimed in claim 4, it is characterized in that: described fixture (50) also comprises that laminating is arranged on the steel plate (52) on furnace shell (12), described sleeve pipe (51) passes in the plate face of steel plate (52), and the axle core of sleeve pipe (51) is perpendicular to the plate face of steel plate (52).
6. high-temperature probe assembly as claimed in claim 5, is characterized in that: described the first gap (511) has been arranged symmetrically with two, and the first gap (511) are inwardly postponed to steel plate (52) and located from the pipe end of sleeve pipe (51); The first gap (511) the postpone tube wall circumferential arrangement of sleeve pipe (51) and length of the second gap (512) of crossing with the mid point of the second gap (512) to one end of steel plate (52), described the second gap (512) that postpones is less than the tube wall girth of half sleeve pipe (51); Sleeve pipe (51) the tube wall edge that forms the first gap (511) outwards arranges flange (513), is provided with the hole of passing for screw on flange (513).
CN201320688974.4U 2013-11-01 2013-11-01 High-temperature probe assembly Withdrawn - After Issue CN203571790U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320688974.4U CN203571790U (en) 2013-11-01 2013-11-01 High-temperature probe assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320688974.4U CN203571790U (en) 2013-11-01 2013-11-01 High-temperature probe assembly

Publications (1)

Publication Number Publication Date
CN203571790U true CN203571790U (en) 2014-04-30

Family

ID=50539521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320688974.4U Withdrawn - After Issue CN203571790U (en) 2013-11-01 2013-11-01 High-temperature probe assembly

Country Status (1)

Country Link
CN (1) CN203571790U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103542424A (en) * 2013-11-01 2014-01-29 合肥金星机电科技发展有限公司 High temperature probe assembly
CN109612595A (en) * 2017-09-29 2019-04-12 富满仪器与控制设备有限公司 Thermocouple set with expansion pipe

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103542424A (en) * 2013-11-01 2014-01-29 合肥金星机电科技发展有限公司 High temperature probe assembly
CN103542424B (en) * 2013-11-01 2015-09-09 合肥金星机电科技发展有限公司 High-temperature probe assembly
CN109612595A (en) * 2017-09-29 2019-04-12 富满仪器与控制设备有限公司 Thermocouple set with expansion pipe

Similar Documents

Publication Publication Date Title
CN103542424B (en) High-temperature probe assembly
JP4414915B2 (en) Gas analyzer
CN203571790U (en) High-temperature probe assembly
CN103234780B (en) Integrated gas sampling probe
CN210604062U (en) Multistage filter probe and sampling system
JP5859860B2 (en) Guide member and gas flow meter extraction method
CN110133187A (en) A kind of online high-precision denitrating flue gas the escaping of ammonia detection system
DE102007002895A1 (en) Wood gas producer has gas source with gas cooler and cleaner including centrifugal separator
KR101560498B1 (en) Method of disassembly Gear box unit for wind power generator and Gear box unit for wind power generator
CN210665205U (en) Probe for sampling flue gas in flue
CN210267290U (en) Discharging device convenient to boiler dirt clearance
US8418567B2 (en) Fluid visual inspection device
CN210045708U (en) Steam pipeline sweeps device of shooing
CN204601819U (en) Recirculated water on-line filtration device
CN206074495U (en) The acid dew point monitoring system bundle assembly of waste-heat recovery device
JP2009139044A (en) Boiler structure and inspection hole adding method
CN110082168A (en) A kind of multi-channel gas sampling probe and the sampler including the probe
CN103913545B (en) Novel CEMS (Continuous Emission Monitoring System) heating box system
CN109982537B (en) Explosion-proof gas intelligent monitoring terminal capable of being disassembled quickly
CN104455913A (en) Water scale removing device for water mixing valve
CN205898521U (en) Gas sampling pole and equipment
CN205580546U (en) Water gauge filter
CN204188532U (en) Flue gas on-line analysis device
CN217464752U (en) Smoke prevention and exhaust device
CN209914260U (en) Explosion-proof gas intelligent monitoring terminal capable of being disassembled quickly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140430

Effective date of abandoning: 20150909

AV01 Patent right actively abandoned

Granted publication date: 20140430

Effective date of abandoning: 20150909

RGAV Abandon patent right to avoid regrant