CN203564354U - Implant fixed bridge repairing abutment-metal bridge impression transferring device - Google Patents

Implant fixed bridge repairing abutment-metal bridge impression transferring device Download PDF

Info

Publication number
CN203564354U
CN203564354U CN201320660414.8U CN201320660414U CN203564354U CN 203564354 U CN203564354 U CN 203564354U CN 201320660414 U CN201320660414 U CN 201320660414U CN 203564354 U CN203564354 U CN 203564354U
Authority
CN
China
Prior art keywords
base station
crane span
span structure
metal crane
metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320660414.8U
Other languages
Chinese (zh)
Inventor
吕广辉
哈斯达来
陈乃麟
孟显赫
陶雷
杨振宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Affiliated Hospital of Chifeng University
Original Assignee
Affiliated Hospital of Chifeng University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Affiliated Hospital of Chifeng University filed Critical Affiliated Hospital of Chifeng University
Priority to CN201320660414.8U priority Critical patent/CN203564354U/en
Application granted granted Critical
Publication of CN203564354U publication Critical patent/CN203564354U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an implant fixed bridge repairing abutment-metal bridge impression transferring device. The device comprises abutments and a metal bridge, wherein the abutments are positioned in the metal base, and are parts connected with an implant and the metal bridge; the root side is connected with the implant through a central screw; the metal bridge covers the crown side of each abutment, basically fits with the abutments, and is used for connecting the abutments into a whole through an adhesive to form the implant fixed bridge repairing abutment-metal bridge impression transferring device. The abutments are obtained on an implant repairing plaster model by selecting according to an implant system, the implant diameter, the gum thickness and occlusogingival distance; the metal bridge is formed by manufacturing a wax model on the plaster model with the abutments and performing lost wax casting. According to the device, rigid connection between the abutments and the implant can be realized, the bending strength of the transferring device is improved, the influence brought by deformation of an impression material can be eliminated, deformation of model plaster can be resisted, loose displacement among connecting devices can be avoided, and the accuracy of the implant impression can be improved.

Description

A kind of plantation fixed bridge is repaired base station-metal crane span structure and is shifted Moulage device
Technical field
This utility model belongs to implant prostheses field, relates in particular to a kind of plantation fixed bridge and repairs base station-metal crane span structure transfer Moulage device.
Background technology
Implant denture passive emplacement is that successful essential condition is repaired in plantation, and particularly important for the reparation of plantation fixed bridge.Dummy accuracy is the prerequisite of passive emplacement.The raising of dummy accuracy relates to many aspects, wherein the most important thing is to improve the accuracy of model.Model accurately first depend on die accurately.It is one of accurate method for marking of plantation fixed bridge reparation of commonly using that acrylic resin clamping plate shift impression technique, but can this technology, because of contraction distortion and the low non-deformability of acrylic resin in polymerization process, make its accuracy that improve die have dispute.
Utility model content
The purpose of this utility model is to provide a kind of plantation fixed bridge to repair base station-metal crane span structure and shifts Moulage device, and the plantation fixed bridge that being intended to solve prior art provides is repaired the problem of Moulage device accuracy deficiency.
This utility model is achieved in that a kind of plantation fixed bridge reparation base station-metal crane span structure shifts Moulage device, and this plantation fixed bridge is repaired base station-metal crane span structure transfer Moulage device and comprised: base station, metal crane span structure;
Base station is positioned at the metallic substrates of metal crane span structure, is the part that connects implantation body and metal crane span structure, and root square tube is crossed center screw and is connected with implantation body; The coating of metal crane span structure is positioned at base station hat side, and reaches substantially closely sealed with base station, by bonding agent, each base station connection is in aggregates, forms plantation fixed bridge and repairs die transfer device.
Further, adopt on the plaster model of repairing in plantation according to implant system, stress, gingiva thickness and occlusogingival distance from apolegamy base station.
Further, metal crane span structure is by each base station after in place in bond layer connector.
Further, bond layer adopts cement or resin cement.
Further, adopt cochrome or the high metal crane span structure of billon casting accuracy.
Further, metal crane span structure also comprises: metallic substrates and pontic support; Metallic substrates is located on base station and is closely sealed with base station, and pontic support is between metallic substrates, and connection metal substrate is an integral body.Though metal crane span structure is comprised of metallic substrates and pontic support two parts, between metallic substrates and pontic support without obvious boundary, by one piece casting or be welded.
Further, device of the present invention has various ways, according to the metallic substrates of the number different metal crane span structure of adjacent implantation body and base station You Liang unit, three units, even more, between metallic substrates, by pontic support, connects.
Plantation fixed bridge that this utility model provides is repaired base station-metal crane span structure and is shifted Moulage device, and the mechanical constraint of metal crane span structure and the chemical of bonding agent be bonding has realized being rigidly connected between base station; Base station is connected with implantation body's (or alternative body) by center screw simultaneously, thereby realized being rigidly connected between implantation body's (or alternative body), improved transfer device bending strength, elimination has printed the impact that mold materials distortion brings, the distortion of resisting model plaster, avoid the loosening displacement between connecting device, improved the accuracy that plantation fixed bridge is repaired die.
Accompanying drawing explanation
Fig. 1 is that the plantation fixed bridge that this utility model provides is repaired the structural representation that base station-metal crane span structure shifts Moulage device;
In figure: 1, base station; 2, metal crane span structure; 2-1, pontic support; 2-2, metallic substrates.
The specific embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with embodiment, this utility model is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain this utility model, and be not used in restriction this utility model.
Below in conjunction with drawings and the specific embodiments, application principle of the present utility model is further described.
As shown in Figure 1, the plantation fixed bridge of this utility model embodiment is repaired base station-metal crane span structure and is shifted Moulage device, and this device comprises: base station 1, metal crane span structure 2; Base station 1 is arranged on implantation body's (or alternative body) upper end, and metal crane span structure 2 is arranged on base station 1 upper end, and base station 1 is connected with metal crane span structure 2 by bond layer; Metal crane span structure 2 also comprises: metallic substrates 2-2, pontic support 2-1;
Metallic substrates 2-2 is arranged on the both sides (or middle) of metal crane span structure 2, and pontic support 2-1 is arranged between metallic substrates 2-2, and it is an integral body that pontic support 2-1 connects each metallic substrates 2-2.
Apolegamy base station 1 of the present utility model: the front non-fenestration method for marking of apolegamy base station 1 is produced plantation and repaired die and pour into super hard gypsum model; The standard of apolegamy base station 1: on plaster model according to implant system, stress, occlusogingival distance from selecting the base station of suitable type, diameter, height with gingiva thickness, wear gum height and be advisable to guarantee that base station edge is positioned on gingiva cuff edge, so that the inspection of metal crane span structure 2 marginal fits;
The making of metal crane span structure 2: on the plaster model of having matched base station 1, make the fusible pattern of metal crane span structure 2, with cobalt chromium porcelain alloy cast metal crane span structure, polishing adjust and the base station 1 that makes it on model closely sealed; On this model, with direct restorative acrylic resin, make plastics corpusculum in place in addition.In place in plastics corpusculum guiding in place base station 1 Kou Nei implantation body, add torque 30Ncm, remove corpusculum in place;
In mouthful, try metal crane span structure 2 on: metal crane span structure 2 is located in to a mouthful interior base station 1, and reaches substantially closely sealed.Metal crane span structure 2 and base station 1 reach substantially closely sealed standard:
(1) detect metal crane span structure 2 edges and base station 1 junction without obviously outstanding protruding, depression and damaged;
(2) during in place in 2 mouthfuls of metal crane span structures and dislocation without obvious resistance;
(3) metal crane span structure 2 is located in rear the stablizing of base station 1 and spends without moving;
(4) metal crane span structure 2 is located in after mouthful interior base station 1, and lens examination base station 1 is with metal crane span structure 2 junction edges without clear gap, and maximum is connected gap≤200 μ m;
Through above standard inspection, if any do not meet in above-mentioned four inspections any one, illustrate that metal crane span structure 2 and base station 1 do not reach substantially closely sealed, need again produce plantation reparation die, making metal crane span structure 2.
Shift completing of Moulage device: metal crane span structure 2 base station 1 in mouth try on reach substantially closely sealed after, with 3M glass ion bonding agent, metal crane span structure 2 is adhered on mouthful interior base station 1, form base station-metal crane span structure aggregation, using this as the transfer device of planting fixed bridge die, produce plantation fixed bridge and repair accurate die.
Operation principle of the present utility model: base station 1 is finished product, obtains planting apolegamy on the plaster model of repairing; Metal crane span structure 2 is that make wax pattern on the plaster model of being furnished with base station 1 after, lost-wax casting forms, and keeps closely sealed with base station 1; In two kinds of structure Kou Nei implantation bodys, by the bonding formation aggregation of bonding agent, base station-metal crane span structure die transfer device, repairs die transfer device as plantation fixed bridge.
Base station 1 is located in implantation body's (or alternative body) hat side, by center screw and implantation body's (or alternative body), is and is rigidly connected; Upper end is positioned at the metallic substrates 2-2 of metal crane span structure 2, chemical by mechanical constraint and bonding agent is bonding to be and to be rigidly connected with it, metallic substrates 2-2 is the rigid unitary connecting into by pontic support 2-1, between Ji Duoke implantation body (or alternative body), by this transfer device, realized and being rigidly connected, to guarantee to plant in transfer operation process, kept the relative position between implantation body constant.
This utility model is transferred to the implantation body's position relationship in mouth outside mouth as conducting wire rigid-connecting device, the transfer device of high-flexural strength, impression material be can eliminate and the impact bringing, the distortion of opposing model plaster are out of shape, avoid the loosening displacement between connecting device, thereby improve the accuracy that plantation fixed bridge is repaired die;
The apolegamy of base station 1 and in place.Base station 1 is to realize rigidly connected important structure between metal crane span structure 2 and implantation body's (or plantation substitutes body).Base station 1 lower end is connected (or being connected with the alternative body of plantation outside mouth) by center screw in mouth with implantation body; Upper end is connected with the metallic substrates 2-2 of metal crane span structure 2 by the bonding force of mechanical constraint and bonding agent.The front non-fenestration method for marking of apolegamy base station 1 is produced plantation and is repaired die and pour into super hard gypsum model.The standard of apolegamy base station 1: on plaster model according to implant system, stress, occlusogingival distance from selecting the base station of suitable type, diameter, height with gingiva thickness, wear gum height and be advisable to guarantee that base station 1 edge is positioned on gingiva cuff edge, so that the inspection of metal crane span structure 2 marginal fits.When in place in 1 mouthful of base station for guarantee with mouthful external model on the concordance of base station 1 position, need make plastics corpusculum in place having matched on the mouth external model of base station, correctly in place in the mouth of guiding base station.
The making of metal crane span structure 2 and trying on.Metal crane span structure 2 is to be formed by the good alloy of casting character (cochrome, billon) casting, comprises metallic substrates 2-2, pontic support 2-1 in function; Metallic substrates 2-2 is positioned at base station 1 upper end, and there is mechanical constraint structure (being that base station rotates without horizontal direction in metallic substrates) in 1 of base station, that base station 1 and metal crane span structure 2 are realized rigidly connected important composition, the thickness of metallic substrates 2-2 is not less than 0.5mm, edge is connected part (mouth outside on plaster model) with base station 1 closely sealed, is connected and stitches gap≤50 μ m; Pontic support 2-1 is the part of connection metal substrate in metal crane span structure 2, cross-sectional area is the bigger the better in principle, but width is no more than substrate crown, thickness is not affect interlock and not oppress gingiva (and keeping 2mm gap between gingiva) and be advisable, and metal crane span structure 2 these structures of plantation the successive winning of the number on title are not obvious; Metallic substrates 2-2 and two kinds of structures of pontic support 2-1 seamlessly transit, without obvious boundary line;
Bond layer is between metal crane span structure 2 and base station 1, by the metal crane span structure 2 of having tried on base station 1 surface adhesion and obtaining in mouth, thereby realize base station 1 and metal crane span structure 2 is rigidly connected into aggregation, base station-metal crane span structure transfer device, repairs die transfer device as plantation fixed bridge; Bond layer thickness is less, and the adaptation of base station and metal crane span structure is better, is rigidly connected also better; For bonding cement and the resin cement of metal crown class, be all chosen as bonding agent.
The foregoing is only preferred embodiment of the present utility model; not in order to limit this utility model; all any modifications of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.

Claims (7)

1. plantation fixed bridge is repaired base station-metal crane span structure and is shifted a Moulage device, it is characterized in that, this plantation fixed bridge is repaired base station-metal crane span structure transfer Moulage device and comprised: base station, metal crane span structure;
Base station is positioned at the metallic substrates of metal crane span structure, is the part that connects implantation body and metal crane span structure, and root square tube is crossed center screw and is connected with implantation body; The coating of metal crane span structure is positioned at base station hat side, and reaches substantially closely sealed with base station, by bonding agent, each base station connection is in aggregates, forms plantation fixed bridge and repairs die transfer device.
2. plantation fixed bridge as claimed in claim 1 is repaired base station-metal crane span structure and is shifted Moulage device, it is characterized in that, adopts on the plaster model of repairing in plantation according to implant system, stress, gingiva thickness and occlusogingival distance from apolegamy base station.
3. plantation fixed bridge as claimed in claim 1 is repaired base station-metal crane span structure and is shifted Moulage device, it is characterized in that, metal crane span structure is by each base station after in place in bond layer connector.
4. plantation fixed bridge as claimed in claim 3 is repaired base station-metal crane span structure and is shifted Moulage device, it is characterized in that, bond layer adopts cement or resin cement.
5. plantation fixed bridge as claimed in claim 1 is repaired base station-metal crane span structure and is shifted Moulage device, it is characterized in that, adopts cochrome or billon cast metal crane span structure.
6. plantation fixed bridge as claimed in claim 1 is repaired base station-metal crane span structure and is shifted Moulage device, it is characterized in that, metal crane span structure also comprises: metallic substrates and pontic support; Metallic substrates is located on base station and is closely sealed with base station, and pontic support is between metallic substrates, and connection metal substrate is an integral body; Though metal crane span structure is comprised of metallic substrates and pontic support two parts, by one piece casting or be welded.
7. plantation fixed bridge as claimed in claim 1 is repaired base station-metal crane span structure and is shifted Moulage device, it is characterized in that, between the metallic substrates of this device, by pontic support, connects.
CN201320660414.8U 2013-10-24 2013-10-24 Implant fixed bridge repairing abutment-metal bridge impression transferring device Expired - Fee Related CN203564354U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320660414.8U CN203564354U (en) 2013-10-24 2013-10-24 Implant fixed bridge repairing abutment-metal bridge impression transferring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320660414.8U CN203564354U (en) 2013-10-24 2013-10-24 Implant fixed bridge repairing abutment-metal bridge impression transferring device

Publications (1)

Publication Number Publication Date
CN203564354U true CN203564354U (en) 2014-04-30

Family

ID=50532124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320660414.8U Expired - Fee Related CN203564354U (en) 2013-10-24 2013-10-24 Implant fixed bridge repairing abutment-metal bridge impression transferring device

Country Status (1)

Country Link
CN (1) CN203564354U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109009512A (en) * 2018-09-03 2018-12-18 苏州固锐德医疗器械有限公司 Artificial tooth bridge restorative procedure
CN111904634A (en) * 2020-07-27 2020-11-10 赤峰学院附属医院 Preparation method of sectional alloy splint impression for implantation repair

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109009512A (en) * 2018-09-03 2018-12-18 苏州固锐德医疗器械有限公司 Artificial tooth bridge restorative procedure
CN111904634A (en) * 2020-07-27 2020-11-10 赤峰学院附属医院 Preparation method of sectional alloy splint impression for implantation repair

Similar Documents

Publication Publication Date Title
US20190105135A1 (en) Denture As Well As Method Of Producing A Denture
CN203564354U (en) Implant fixed bridge repairing abutment-metal bridge impression transferring device
CN106510692B (en) A kind of extensible flexible electrode and preparation method thereof
CN102648875B (en) Method for manufacturing personalized tongue side corrector and tongue side corrector
CN107137150A (en) A kind of reinforcement type digitizes the forming method of appliance
CN101297770A (en) Method for producing individual bracket from preformed lingual bracket and products thereof
Liu et al. Numerical investigation of macro-and micro-mechanics of a ceramic veneer bonded with various cement thicknesses using the typical and submodeling finite element approaches
CN109998714A (en) A kind of 3 D-printing formula preparation method of tooth-implanting bridge
CN106031665B (en) A kind of Dental implantion repairs the designing and manufacturing method of individual tray
CN103550007B (en) A kind of preparation method of plantation fixed bridge precision impression
WO2011018196A3 (en) Production of a negative mould for use in producing a dental prosthesis, a temporary or permanent crown or bridge
CN207429199U (en) A kind of Abutment
CN201719397U (en) Jaw frame
CN111920532A (en) Embedded pile core for repairing tooth defect and preparation method and application thereof
CN201453384U (en) Oral parallel grinding guide instrument
CN106510875A (en) Detachable denture and preparation method thereof
CN107080600B (en) A kind of artificial tooth and forming method with retention pin
Ali et al. Posterior palatal seal area established in conventional and CAD/CAM fabricated complete denture techniques: Clinical Case Study
US20110177477A1 (en) Denture system kit and method
JP6580076B2 (en) Prosthetic base, method for substance-to-substance bonding of at least one artificial tooth to a prosthetic base, prosthesis, prosthesis manufacturing method and wax model
CN210204962U (en) Wax tooth engraving mold for human 3 times large right maxillary canine teeth
CN206630707U (en) A kind of NEW TYPE OF COMPOSITE artificial tooth
CN201453388U (en) Orthodontic bracket
CN208799343U (en) A kind of firm silicone rubber impression pallet
CN203634190U (en) Ear CT radiation template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140430

Termination date: 20151024

EXPY Termination of patent right or utility model