CN203559680U - Buffer installation structure of shower room - Google Patents
Buffer installation structure of shower room Download PDFInfo
- Publication number
- CN203559680U CN203559680U CN201320657098.9U CN201320657098U CN203559680U CN 203559680 U CN203559680 U CN 203559680U CN 201320657098 U CN201320657098 U CN 201320657098U CN 203559680 U CN203559680 U CN 203559680U
- Authority
- CN
- China
- Prior art keywords
- snubber
- guide rail
- upper cover
- holding screw
- mounting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Residential Or Office Buildings (AREA)
Abstract
The utility model provides a buffer installation structure of a shower room. The buffer installation structure of the shower room comprises an upper cover, fastening screws, buffers and a guide rail, wherein the fastening screws are installed on the upper cover; an opening smaller than the upper cover is formed in the top end of the guide rail; cavities used for accommodating the buffers are formed inside the guide rail; during installation, the buffers are placed into the cavities inside the guide rail from the opening in the top end of the guide rail, then the upper cover covers the guide rail, and the fastening screws are used for adjusting and fixing positions of the buffers. Compared with the prior art, the buffer installation structure has the characteristics that the buffers are convenient to assemble and disassemble, installation and later maintenance are simpler and more convenient and the like.
Description
Technical field
The utility model relates to a kind of mounting structure, relates in particular to a kind of snubber mounting structure of shower house.
Background technology
In order to reduce fault rate, improve degree of safety and the comfort level used, existing shower house is provided with snubber more, it is that snubber is put into guide rail from the two ends of door guide rail, guide rail after it is all wrapped again by guide rail and column screw locking, thereby snubber has been placed in to the space of a base closed, recycling screw is fixed snubber, and snubber coordinates to reach a buffering effect with the boss on trolley.Existing snubber mounting structure mainly contains following shortcoming:
1, snubber entirety is enclosed in guide rail, in later stage use procedure, snubber breaks down, need a whole set of room body to pull down and open, snubber is adjusted or changed, again a whole set of products is reinstalled, cause inefficiency, maintenance cost is high, is unfavorable for later maintenance and the popularization of product.
After shower house installs, need to adjust the distance between snubber and wheel, guarantee that the boss on wheel can drive snubber work; Snubber is in use because wearing and tearing also need the distance between adjustment and wheel; Former mounting method needs professional to pull down product to readjust snubber.
Summary of the invention
The snubber mounting structure that the utility model proposes a kind of shower house, the feature such as it has snubber easy accessibility, and the installation of product and later maintenance are more easy.
For reaching this object, the utility model by the following technical solutions: a kind of snubber mounting structure of shower house, it comprises:
Upper cover;
Be arranged on the holding screw covering;
Snubber;
Guide rail, described guide rail top has the opening that is less than described upper cover, and in it, has the chamber for placing above-mentioned snubber;
During installation, snubber is placed in by the opening part on guide rail top in the chamber of guide rail inside, then covers upper cover, with holding screw, adjust buffer positions also fixing.
The snubber mounting structure of the shower house that this programme provides, change the structure that existing installation rear rail wraps up snubber completely, by have the opening of placing snubber in order to install at guide rail top, from opening part, put into and install snubber, cover upper cover, then with holding screw, snubber is adjusted to distance fixing, complete installation.
In this programme, described upper cover or screw mode chimeric by including but not limited to, bonding with described guide rail is combined.
In this programme, preferably, described snubber has two, accordingly, for placing the chamber of above-mentioned snubber, is two in described guide rail, and the holding screw covering on described is 2N, the positive integer that N is >=1.
Further preferably, on snubber, have the screw of corresponding holding screw.Upper cover and snubber first can be assembled like this to more convenient installation by holding screw.
Existing mounting means is to be wrapped in guide rail whole snubber, once breaking down, snubber needs a whole set of room body to take apart, adjust again or change, new construction is directly from guide rail top open part, snubber to be taken out and adjusts replacing, maintenance time and maintenance cost be can save, popularization and the later maintenance of product are conducive to.With existing mounting means, compare, new construction is installed simpler and easy, hommization.Simultaneous buffering device has a service life, exceed its service life aging after, adopt new construction mode to be also more conducive in time it be changed.
Accompanying drawing explanation
The snubber mounting structure decomposing schematic representation of the shower house that Fig. 1 provides for the utility model.
Fig. 2 is placed in the structural representation after corresponding chamber in guide rail hamper upper cover by snubber.
Fig. 3 adjusts distance fixing structural representation by holding screw by snubber.
Wherein: 1-holding screw; 2-upper cover; 3-snubber; 4-guide rail; 5-screwdriver; 41-for placing the chamber of above-mentioned snubber.
The specific embodiment
Below in conjunction with accompanying drawing and by the specific embodiment, further illustrate the technical solution of the utility model.Should illustrate, accompanying drawing only, for explanation the technical program, is not drawn according to strict mechanical drawing, and wherein for those skilled in the art known part have necessarily default.
With reference to accompanying drawing 1, the snubber mounting structure decomposing schematic representation of its shower house providing for the utility model.The utility model provides a kind of snubber mounting structure of shower house, and it comprises:
Be arranged on the holding screw 1 on upper cover 2;
Snubber 3;
During installation, snubber 3 is placed in to 41 li of the chambers of guide rail 4 inside by the opening part on guide rail 4 tops, then covers upper cover 2, adjust snubber 3 positions fixing with holding screw 1.
Snubber 3 can be installed so easily, meanwhile, also maintain and replace easily when breaking down.
In this programme, the modes such as upper cover 2 is chimeric by including but not limited to, bonding with described guide rail 4, screw are combined.
Preferably, described snubber 3 has two, accordingly, in described guide rail 4, for the chamber 41 of placing above-mentioned snubber 3, is two, and the holding screw 1 on described upper cover 2 is 2N, the positive integer that N is >=1.
Further preferably, on snubber 3, have the screw of corresponding holding screw 1.Upper cover 2 and snubber 3 first can be assembled like this to more convenient installation by holding screw 1.
Know-why of the present utility model has below been described in conjunction with specific embodiments.These are described is in order to explain principle of the present utility model, and can not be interpreted as by any way the restriction to the utility model protection domain.Based on explanation herein, those skilled in the art does not need to pay performing creative labour can associate other specific embodiment of the present utility model, within these modes all will fall into protection domain of the present utility model.
Claims (4)
1. a snubber mounting structure for shower house, it comprises:
Upper cover;
Be arranged on the holding screw covering;
Snubber;
Guide rail, described guide rail top has the opening that is less than described upper cover, and in it, has the chamber for placing above-mentioned snubber;
During installation, snubber is placed in by the opening part on guide rail top in the chamber of guide rail inside, then hamper upper cover, adjusts buffer positions with holding screw also fixing.
2. the snubber mounting structure of shower house as claimed in claim 1, is characterized in that, described upper cover is combined by chimeric, bonding or screw mode with described guide rail.
3. the snubber mounting structure of shower house as claimed in claim 1, is characterized in that, described snubber has two, accordingly, for placing the chamber of above-mentioned snubber, be two in described guide rail, the holding screw covering on described is 2N, the positive integer that N is >=1.
4. the snubber mounting structure of the shower house as described in any one in claim 1~3, is characterized in that, has the screw of corresponding described holding screw on described snubber.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320657098.9U CN203559680U (en) | 2013-10-23 | 2013-10-23 | Buffer installation structure of shower room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320657098.9U CN203559680U (en) | 2013-10-23 | 2013-10-23 | Buffer installation structure of shower room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203559680U true CN203559680U (en) | 2014-04-23 |
Family
ID=50509409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320657098.9U Expired - Fee Related CN203559680U (en) | 2013-10-23 | 2013-10-23 | Buffer installation structure of shower room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203559680U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103498610A (en) * | 2013-10-23 | 2014-01-08 | 佛山市浪鲸洁具有限公司 | Buffer installation structure of shower room |
-
2013
- 2013-10-23 CN CN201320657098.9U patent/CN203559680U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103498610A (en) * | 2013-10-23 | 2014-01-08 | 佛山市浪鲸洁具有限公司 | Buffer installation structure of shower room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103498610A (en) | Buffer installation structure of shower room | |
CN203559680U (en) | Buffer installation structure of shower room | |
CN103510777B (en) | A kind of buffer installation structure of shower house | |
CN203499415U (en) | Buffer installation structure of shower room | |
CN204299396U (en) | A kind of electric double-open door door | |
MX2012008648A (en) | Apparatus for the control and/or distribution of electric power comprising a protective anti-dust device. | |
CN203429450U (en) | Washing machine with damping hinges | |
CN202361737U (en) | Refrigerator door body adjusting structure | |
CN204274380U (en) | Door balanced structure and dish-washing machine | |
CN203553801U (en) | Built-in cable arrangement frame | |
CN211033459U (en) | Can assembled intelligent reactive power compensator | |
CN204438659U (en) | A kind of pronunciation receiver being applied to intelligent refrigerator | |
CN202406399U (en) | Combined electric box | |
CN202229512U (en) | Auxiliary device of refrigerator door body and refrigerator | |
CN202017353U (en) | Bus station shelter installed with LED display screen on frame thereof | |
CN204441128U (en) | A kind of switch | |
CN201515154U (en) | Switch cabinet door anti-dropping bracket | |
CN204858297U (en) | Integral low -voltage cabinet top cap that can open | |
CN202142784U (en) | Inner support of column of cabinet body | |
CN201975700U (en) | Waterproof sealing structure | |
CN205071526U (en) | Cabinet display screen fixing device | |
CN211044573U (en) | Chinese culture testing arrangement who leaves a book student in a mood | |
CN203605110U (en) | LED ceiling lamp | |
CN201887350U (en) | Door plate mounting structure for ventilating chamber of low-voltage power distribution cabinet | |
CN205406616U (en) | Fixed and power line connecting device of MSD |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140423 Termination date: 20211023 |
|
CF01 | Termination of patent right due to non-payment of annual fee |