CN203550567U - Degreasing furnace with furnace cover and furnace body designed separately - Google Patents

Degreasing furnace with furnace cover and furnace body designed separately Download PDF

Info

Publication number
CN203550567U
CN203550567U CN201320642962.8U CN201320642962U CN203550567U CN 203550567 U CN203550567 U CN 203550567U CN 201320642962 U CN201320642962 U CN 201320642962U CN 203550567 U CN203550567 U CN 203550567U
Authority
CN
China
Prior art keywords
furnace
heater
bell
debinding furnace
split design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320642962.8U
Other languages
Chinese (zh)
Inventor
孙宗君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Jun Dao New Material Science And Technology Ltd
Original Assignee
Jinan Jun Dao New Material Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Jun Dao New Material Science And Technology Ltd filed Critical Jinan Jun Dao New Material Science And Technology Ltd
Priority to CN201320642962.8U priority Critical patent/CN203550567U/en
Application granted granted Critical
Publication of CN203550567U publication Critical patent/CN203550567U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a degreasing furnace with a furnace cover and a furnace body designed separately, and aims to solve the problem of low production efficiency of the conventional degreasing furnace due to long cooling time. The degreasing furnace comprises a furnace body, a furnace cover and a furnace pipe, wherein the furnace body is coated outside the furnace pipe, and comprises a heating layer and a heat preserving layer in sequence from inside to outside; the furnace cover is movably connected with the furnace body. The cooling efficiency of the furnace body can be increased greatly, and the cooling time is shortened by 8-10 hours, so that the production efficiency is increased, and the production cost is reduced.

Description

The debinding furnace of a kind of bell and body of heater split design
Technical field
The utility model relates to heat-treatment furnace technical field, particularly the debinding furnace of a kind of bell and body of heater split design.
Background technology
Debinding furnace is a kind of plant equipment that adopts grease volatilization that heating means make surface of the work or burning and remove, comprise flue, body of heater and material table, the debinding furnace body of heater that prior art is done is integrated design, because in use, furnace body temperature will be warmed up to 650 ℃~900 ℃ (the product calcined temperature of different materials is different); In program, move complete temperature-fall period, because body of heater is an airtight integral body, the cooling rate of body of heater is very slow, especially when 400 ℃ of following temperature, cooling rate is slower, temperature-fall period needs just can drop to below 80 ℃ for 24-28 hour, reuse, long because of temperature fall time, the production efficiency of debinding furnace is reduced greatly.
Utility model content
The utility model provides the debinding furnace of a kind of bell and body of heater split design, solves existing debinding furnace because of the long low problem of debinding furnace production efficiency causing of temperature fall time.
The technical solution of the utility model is achieved in that the debinding furnace of a kind of bell and body of heater split design, comprises body of heater, bell and flue, and body of heater is coated on outside flue, comprises successively from the inside to surface zone of heating and heat-insulation layer, and bell is flexibly connected with body of heater.
Wherein, preferably, debinding furnace also comprises for supporting the grate of body of heater.
Wherein, preferably, bell is hinged on the grate on body of heater top.
Wherein, preferably, debinding furnace also comprises the jack that makes furnace cover lifting for supporting bell, is fixed on grate, and jack and bell hinged place are separately positioned on the two ends of body of heater one diameter.
Wherein, preferably, between zone of heating and heat-insulation layer, leave the space of 10~20cm.
Wherein, preferably, debinding furnace also comprises and is arranged on flue bottom for the material table of place work piece, and material table and body of heater are bolted.
The beneficial effects of the utility model:
1. because body of heater of the present utility model and bell design for split, both one end are hinge arrangement, and the other end is connected with support bar, and bottom is jack, can lifting bell.In the debinding furnace operation phase, jack puts down, and bell is pressed on body of heater, and both are integrated; Device program end of run, while starting to lower the temperature, rises jack, and bell is risen, and body of heater top opens up, and air forms convection current in stove cylinder, thereby realizes the object of fast cooling.
2. the utility model can improve the cooling rate of body of heater greatly, makes temperature fall time shorten 8~10 hours, thereby has improved production efficiency, has reduced production cost.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the utility model example structure schematic diagram;
Fig. 2 is that Fig. 1 is along A to view.
In figure, 1. bell, 2. flue, 3. zone of heating, 4. heat-insulation layer, 5. space, 6. grate, 7. material table, 8. jack, the 9. hinged place of bell and grate.
The specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, rather than whole embodiment.Embodiment based in the utility model, those of ordinary skills are not making the every other embodiment obtaining under creative work prerequisite, all belong to the scope of the utility model protection.
As depicted in figs. 1 and 2, the present embodiment provides the debinding furnace of a kind of bell and body of heater split design, comprise body of heater, bell 1, flue 2 and grate 6, grate 6 is for supporting body of heater, body of heater is coated on outside flue 2, comprises successively from the inside to surface zone of heating 3 and heat-insulation layer 4, leaves the space 5 of 10~20cm between zone of heating 3 and heat-insulation layer 4, this space 5 is air heat insulating layer, has further improved the heat insulation effect of debinding furnace.
Wherein, bell 1 is hinged on the grate 6 on body of heater top, and bell 1 is not limited to the manner with the connected mode of body of heater, also can be other movable connection method.Also be provided with the jack 8 that makes furnace cover lifting for supporting bell 1, this jack 8 is fixed on grate 6, the two ends that the hinge knot place 9 of bell and grate and jack 8 are separately positioned on body of heater one diameter, in the debinding furnace operation phase, jack 8 puts down, and bell 1 is pressed on body of heater, and both are integrated; Device program end of run, while starting to lower the temperature, rises jack 8, and bell 1 is risen, and body of heater top opens up, and air forms convection current in stove cylinder, thereby realizes the object of fast cooling.The lowering or hoisting gear of bell is not limited to the present embodiment, also can be cylinder, silk cylinder etc. other can elevate a turnable ladder equipment.
Wherein, debinding furnace also comprises and is arranged on flue 2 bottoms for the material table of place work piece, and material table and body of heater are bolted.
Use procedure: in debinding furnace use procedure, first will body of heater be hung on vacant lot on one side by driving, then flue 2 be hung on the vacant lot of another side.The product of wanting degreasing being placed on material table 7 from level to level.After product placement is good, elder generation comes flue 2 to be placed on grate 6 by traveling crane, then body of heater is hung, good by bolted, then working procedure; Device program end of run, while starting to lower the temperature, rises jack 8, and bell 1 is risen, body of heater cooling, cools to 80 ℃ when following, covers bell 1, first with traveling crane, walk body of heater and bell 1, then with traveling crane, walk flue 2, finally the product that has taken off fat is taken out.Then load a stove product.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (6)

1. a debinding furnace for bell and body of heater split design, comprises body of heater, bell and flue, and described body of heater is coated on outside described flue, comprises successively from the inside to surface and it is characterized in that zone of heating and heat-insulation layer: described bell is flexibly connected with described body of heater.
2. the debinding furnace of a kind of bell according to claim 1 and body of heater split design, is characterized in that: also comprise for supporting the grate of described body of heater.
3. the debinding furnace of a kind of bell according to claim 2 and body of heater split design, is characterized in that: described bell is hinged on the grate on described body of heater top.
4. the debinding furnace that a kind of bell according to claim 3 and body of heater split design, it is characterized in that: also comprise the jack that makes furnace cover lifting for supporting bell, be fixed on described grate, described jack and described bell hinged place are separately positioned on the two ends of described body of heater one diameter.
5. the debinding furnace of a kind of bell according to claim 1 and body of heater split design, is characterized in that: the space of leaving 10~20cm between described zone of heating and described heat-insulation layer.
6. the debinding furnace of a kind of bell according to claim 1 and body of heater split design, is characterized in that: also comprise and be arranged on described flue bottom for the material table of place work piece, described material table and described body of heater are bolted.
CN201320642962.8U 2013-10-17 2013-10-17 Degreasing furnace with furnace cover and furnace body designed separately Expired - Fee Related CN203550567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320642962.8U CN203550567U (en) 2013-10-17 2013-10-17 Degreasing furnace with furnace cover and furnace body designed separately

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320642962.8U CN203550567U (en) 2013-10-17 2013-10-17 Degreasing furnace with furnace cover and furnace body designed separately

Publications (1)

Publication Number Publication Date
CN203550567U true CN203550567U (en) 2014-04-16

Family

ID=50468674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320642962.8U Expired - Fee Related CN203550567U (en) 2013-10-17 2013-10-17 Degreasing furnace with furnace cover and furnace body designed separately

Country Status (1)

Country Link
CN (1) CN203550567U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107335393A (en) * 2017-08-31 2017-11-10 江苏维尔炉业有限公司 A kind of split type reactor heating furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107335393A (en) * 2017-08-31 2017-11-10 江苏维尔炉业有限公司 A kind of split type reactor heating furnace

Similar Documents

Publication Publication Date Title
CN201733771U (en) Drum type hot cake stove
CN203550567U (en) Degreasing furnace with furnace cover and furnace body designed separately
CN203772001U (en) Degreasing furnace provided with lifting type material platform
CN203053232U (en) Furnace liner drying device
CN103063013A (en) Heat treatment hanging device for well-type heating furnace
CN202267355U (en) Heat treatment hanging device for well-type heating furnace
CN203550566U (en) Degreasing furnace
CN203550568U (en) Degreasing furnace
CN203550565U (en) Degreasing furnace with air vents
CN204299595U (en) A kind of shift-forward type hydraulic control crane canopy device
CN204730500U (en) A kind of lift solar thermal collector
CN204597735U (en) A kind of large directly driven permanent magnet wind generating rotor heating furnace
CN203971032U (en) A kind of Medical lift type infusion support
CN203513094U (en) Lifting appliance
CN204306682U (en) A kind of multi-function oven
CN203100380U (en) Novel drying device
CN203731853U (en) Double-slideway bell-jar-type electric heating furnace
CN202491020U (en) Welding wire baking oven
CN203401229U (en) Novel welding material baking oven
CN205180240U (en) Vegetable seed drying -machine with telescoping device
CN204325436U (en) A kind of upset stove temperature measuring equipment
CN206772033U (en) One kind drying sintering furnace vertical lifting device
CN203037090U (en) Heat maintaining furnace with outage safe control device
CN209583642U (en) A kind of inner string graphitization stove
CN202648379U (en) Improved tunnel kiln

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20161017