CN203549155U - PCCP in intelligentized management system - Google Patents

PCCP in intelligentized management system Download PDF

Info

Publication number
CN203549155U
CN203549155U CN201320691009.2U CN201320691009U CN203549155U CN 203549155 U CN203549155 U CN 203549155U CN 201320691009 U CN201320691009 U CN 201320691009U CN 203549155 U CN203549155 U CN 203549155U
Authority
CN
China
Prior art keywords
steel ring
pccp
steel cylinder
steel
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320691009.2U
Other languages
Chinese (zh)
Inventor
李世龙
李贵永
郑杏平
邹锦荣
袁本阔
何志平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG HAIYUAN PIPELINE CO., LTD.
Original Assignee
Middle Mountain Milky Way Pipeline Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Mountain Milky Way Pipeline Co Ltd filed Critical Middle Mountain Milky Way Pipeline Co Ltd
Priority to CN201320691009.2U priority Critical patent/CN203549155U/en
Application granted granted Critical
Publication of CN203549155U publication Critical patent/CN203549155U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a PCCP in an intelligentized management system. The PCCP comprises a pipe body, a mouthing steel ring and a socket steel ring, wherein the mouthing steel ring and the socket steel ring are arranged at the two ends of the pipe body. A steel cylinder inner wall concrete layer, a steel cylinder and a steel cylinder outer wall cement mortar protective layer are arranged on the pipe body from inside to outside in sequence. Prestressed wires are wound on the outer surface of the steel cylinder. The outer surface of the socket steel ring of the pipe body is matched with the inner surface of the mouthing steel ring of the pipe body in a sealed mode. The steel cylinder in the pipe body extends to form the socket steel ring integrally. An annular groove is formed in the position, over the mouthing steel ring, of the steel cylinder outer wall cement mortar protective layer in a sunken mode. A plurality of accommodating grooves used for placing monitoring devices or sensors are formed in the annular groove of the steel cylinder outer wall cement mortar protective layer. A locking and fixing steel ring is arranged on the outer surface of the annular groove and is arranged above the accommodating grooves in a covering mode and is flush with the end face of the steel cylinder outer wall cement mortar protective layer.

Description

PCCP pipe in a kind of intellectualized management system
Technical field
The utility model relates to building material field technology, and the pipe of the PCCP in a kind of intellectualized management system is particularly provided.
Background technique
PCCP pipe is in application process, and its distribution distance is long, and region span is large, and pipe inspection is manually patrolled in simple dependence, judges that by rule of thumb whether pipeline is normal, and its information transmission cycle is long, error is large.Once occur that aqueduct is damaged, reveal, artificial theft destroys, when equipment failure along the line, damage and the abnormal condition such as stolen, if can not find in time and take measures, can cause the adverse consequencess such as pipe leakage, even water delivery interruption, national economy property suffer heavy losses.Therefore in prior art, the monitoring of PCCP pipeline adopts remotely intelligently monitoring means to realize, this monitoring means just require us to carry out larger improvement to PCCP pipe itself, so that corresponding sensor or monitoring device are installed in the future in intelligent monitoring process, sensor is device or the device that can experience specified measuring range and convert available signal according to certain rule to, conventionally sensing element and conversion element, consists of ".Sensor is a kind of detection device, can experience measured information, and the information that detection can be experienced, be for conversion into according to certain rules the information output of electrical signal or other desired forms, to meet the requirements such as transmission, processing, storage, demonstration, record and control of information.Sensor technology is to realize the primary link that automatically detects and automatically control.If Sensor section can not obtain good protection; thereby frequently break down, cause data monitoring inaccurate; not only can not reach the object of real-time monitoring water transport pipeline operating mode; but also by wasting huge man power and material on examination and maintenance monitoring equipment, improved the cost in production process.Therefore mounting point and the protective measures of sensor on PCCP pipe seem particularly important.
At present to various enviromental parameters, aqueduct internal pressure for example, flow velocity, tube wall microseismic activity, body reinforcement stresses, homogeneous tube uneven settlement, body temperature, the monitoring of the multiple physical quantity such as water quality is all by various sensor probes are installed at pipe interior, the working medium in pipe to be measured.Generally, in a measuring point, often need to measure many kinds of parameters, therefore need to use a plurality of or multiple sensors; Arranging of existing sensor is to be arranged on separately respectively under pipe interior or other environment that need to measure mostly, limited installing space has not only been wasted in scattered setting, and need to dig a plurality of mounting points, this body structure of equipment has been caused to destruction, brought uncertain potential safety hazard; The monitoring equipment of sensor is directly exposed in working medium, has also cut down to a certain extent the working life of sensor; Arranging so is also unfavorable for the management such as maintenance, inspect and change simultaneously; How to make the sensor in water transport pipeline reach installation simply, maintenance, inspect and change be effect easily, is a problem demanding prompt solution.
Summary of the invention
In view of this, the utility model is for the disappearance of prior art existence, its main purpose is to provide the PCCP pipe in a kind of intellectualized management system, this PCCP pipe not only has good mechanical property, various kinds of sensors or monitoring device can be installed safely and effectively in the above simultaneously, so that when the intelligent management of pipeline, improve the working life of sensor, make that installation of sensors is simple, maintenance, inspect and change be convenient simultaneously.
For achieving the above object, the utility model adopts following technological scheme: the PCCP pipe in a kind of intellectualized management system, include body and the bellmouth steel ring and the socket steel ring that are installed on body two ends, body portion is followed successively by steel cylinder internal-wall concrete layer, steel cylinder and steel cylinder outer wall cement mortar protective course from inside to outside, on steel cylinder outer surface, be wound with reinforcement wire, the socket steel ring outer surface of described body and bellmouth steel ring inner surface are sealed and matched; Described socket steel ring is that in body, the extension of steel cylinder one forms; outer wall cement mortar protective course depression directly over described bellmouth steel ring is provided with annular groove; this outer wall cement mortar protective course be positioned on annular groove, offer a plurality of for placing the containing groove of monitoring device or sensor; this annular groove outer surface is provided with a locking steel ring, and this locking steel ring is covered on containing groove top and concordant with the end face of outer wall cement mortar protective course.
As a kind of preferred version, on described socket steel ring, be provided with probe, this probe is provided with waterproof sealing structure.
As a kind of preferred version; the bellmouth steel ring of described PCCP pipe and and the steel cylinder outer wall cement mortar protective course that covers of the socket steel ring outer surface of its another PCCP pipe of mutually pegging graft between there is span and form an annular space; described probe be positioned at this annular space under, this probe is connected by wire with monitoring device or sensor in containing groove.
As a kind of preferred version, described annular space is provided with the limiting stopper of the mutual extrusion-deformation of steel cylinder outer surface protective coating that prevents two PCCP pipes.
As a kind of preferred version, the degree of depth that described annular groove caves in equal the to lock thickness of steel ring.
As a kind of preferred version, described locking steel ring is provided with for untiing or lock the locking structure of steel ring.
As a kind of preferred version, described containing groove is provided with quakeproof rubber pad around.
The utility model compared with prior art has obvious advantage and beneficial effect, the beneficial effects of the utility model: the body portion of this PCCP pipe is followed successively by steel cylinder internal-wall concrete layer, steel cylinder and steel cylinder outer wall cement mortar protective course from inside to outside, on steel cylinder outer surface, be wound with reinforcement wire, the socket steel ring outer surface of this body and bellmouth steel ring inner surface are sealed and matched, make this PCCP pipe there is good mechanical property, at the close end of outer wall cement mortar protective course concave end, be provided with annular groove simultaneously, this outer wall cement mortar protective course be positioned on annular groove, offer a plurality of for placing the containing groove of monitoring device or sensor, this annular groove outer surface is provided with a locking steel ring, this locking steel ring is covered on containing groove top, this containing groove also can be provided with quakeproof rubber pad around, various kinds of sensors or monitoring device can be installed safely and effectively in the above, so that when the intelligent management of pipeline, improve the working life of sensor, under the effect of dismountable locking steel ring, by dismantling and the steel ring that locks makes installation of sensors simple, safeguard, inspect and change is convenient.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the preferred embodiment of the utility model;
Fig. 2 is the schematic diagram of the preferred embodiment of the utility model.
Accompanying drawing identifier declaration:
10, body
11, steel cylinder internal-wall concrete layer 12, steel cylinder
13, steel cylinder outer wall cement mortar protective course 14, reinforcement wire
15, annular groove 16, containing groove
17, locking steel ring
20, bellmouth steel ring
30, socket steel ring
31, probe 32, waterproof sealing structure
40, annular space
41, limiting stopper.
Embodiment
Please refer to shown in Fig. 1 and Fig. 2, it has shown the concrete structure of the preferred embodiment of the utility model, and the PCCP pipe in a kind of intellectualized management system, includes body 10 and the bellmouth steel ring 20 and the socket steel ring 30 that are installed on body two ends.
Wherein, these body 10 parts are followed successively by steel cylinder internal-wall concrete layer 11 from inside to outside, steel cylinder 12 and steel cylinder outer wall cement mortar protective course 13, on steel cylinder 12 outer surfaces, be wound with reinforcement wire 14, socket steel ring 30 between described two PCCP pipes matches with bellmouth steel ring 20, described socket steel ring 30 extends and forms for 12 one of steel cylinder in body 10, outer wall cement mortar protective course 13 depressions directly over described bellmouth steel ring 20 are provided with annular groove 15, this outer wall cement mortar protective course 13 be positioned on annular groove 15, offer a plurality of for placing the containing groove 16 of monitoring device or sensor, these annular groove 15 outer surfaces are provided with a locking steel ring 17, this locking steel ring 17 is covered on containing groove 16 tops and concordant with the end face of outer wall cement mortar protective course 13.The degree of depth that this annular groove 15 caves in equal the to lock thickness of steel ring 17.This locking steel ring 17 is provided with for untiing or lock the locking structure of steel ring.
On this socket steel ring 30, be provided with probe 31, this probe 31 is provided with waterproof sealing structure 32.
The bellmouth steel ring 20 of this PCCP pipe and and the steel cylinder outer wall cement mortar protective course 13 that covers of socket steel ring 30 outer surfaces of its another PCCP pipe of mutually pegging graft between there is span and form an annular space 40; described probe 31 be positioned at this annular space 40 under, this probe 31 is connected by wire with monitoring device or sensor in containing groove 16.
This annular space 40 is provided with the limiting stopper 41 of the mutual extrusion-deformation of steel cylinder outer surface protective coating that prevents two PCCP pipes.
The utility model design focal point is: the body portion of this PCCP pipe is followed successively by steel cylinder internal-wall concrete layer, steel cylinder and steel cylinder outer wall cement mortar protective course from inside to outside, on steel cylinder outer surface, be wound with reinforcement wire, the socket steel ring outer surface of this body and bellmouth steel ring inner surface are sealed and matched, make this PCCP pipe there is good mechanical property, at the close end of outer wall cement mortar protective course concave end, be provided with annular groove simultaneously, this outer wall cement mortar protective course be positioned on annular groove, offer a plurality of for placing the containing groove of monitoring device or sensor, this annular groove outer surface is provided with a locking steel ring, this locking steel ring is covered on containing groove top, this containing groove also can be provided with quakeproof rubber pad around, various kinds of sensors or monitoring device can be installed safely and effectively in the above, so that when the intelligent management of pipeline, improve the working life of sensor, under the effect of dismountable locking steel ring, by dismantling and the steel ring that locks makes installation of sensors simple, safeguard, inspect and change is convenient.
The above, it is only preferred embodiment of the present utility model, not technical scope of the present utility model is imposed any restrictions, therefore every foundation technical spirit of the present utility model, to any trickle modification made for any of the above embodiments, equivalent variations and modification, all still belongs in the scope of technical solutions of the utility model.

Claims (7)

1. the PCCP in an intellectualized management system manages, it is characterized in that: include body and the bellmouth steel ring and the socket steel ring that are installed on body two ends, body portion is followed successively by steel cylinder internal-wall concrete layer, steel cylinder and steel cylinder outer wall cement mortar protective course from inside to outside, on steel cylinder outer surface, be wound with reinforcement wire, the socket steel ring outer surface of described body and being sealed and matched with the bellmouth steel ring inner surface of its another body of mutually pegging graft; Described socket steel ring is that in body, the extension of steel cylinder one forms; outer wall cement mortar protective course depression directly over described bellmouth steel ring is provided with annular groove; this outer wall cement mortar protective course be positioned on annular groove, offer a plurality of for placing the containing groove of monitoring device or sensor; this annular groove outer surface is provided with a locking steel ring, and this locking steel ring is covered on containing groove top and concordant with the end face of outer wall cement mortar protective course.
2. the pipe of the PCCP in a kind of intellectualized management system according to claim 1, is characterized in that: on described socket steel ring, be provided with probe, this probe is provided with waterproof sealing structure.
3. the pipe of the PCCP in a kind of intellectualized management system according to claim 2; it is characterized in that: the bellmouth steel ring of described PCCP pipe and and the steel cylinder outer wall cement mortar protective course that covers of the socket steel ring outer surface of its another PCCP pipe of mutually pegging graft between there is span and form an annular space; described probe be positioned at this annular space under, this probe is connected by wire with monitoring device or sensor in containing groove.
4. the pipe of the PCCP in a kind of intellectualized management system according to claim 3, is characterized in that: described annular space is provided with the limiting stopper of the mutual extrusion-deformation of steel cylinder outer surface protective coating that prevents two PCCP pipes.
5. the pipe of the PCCP in a kind of intellectualized management system according to claim 1, is characterized in that: the degree of depth that described annular groove caves in equal the to lock thickness of steel ring.
6. the pipe of the PCCP in a kind of intellectualized management system according to claim 1, is characterized in that: described locking steel ring is provided with for untiing or lock the locking structure of steel ring.
7. the pipe of the PCCP in a kind of intellectualized management system according to claim 1, is characterized in that: described containing groove is provided with quakeproof rubber pad around.
CN201320691009.2U 2013-11-04 2013-11-04 PCCP in intelligentized management system Expired - Fee Related CN203549155U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320691009.2U CN203549155U (en) 2013-11-04 2013-11-04 PCCP in intelligentized management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320691009.2U CN203549155U (en) 2013-11-04 2013-11-04 PCCP in intelligentized management system

Publications (1)

Publication Number Publication Date
CN203549155U true CN203549155U (en) 2014-04-16

Family

ID=50467271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320691009.2U Expired - Fee Related CN203549155U (en) 2013-11-04 2013-11-04 PCCP in intelligentized management system

Country Status (1)

Country Link
CN (1) CN203549155U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104633461A (en) * 2014-12-31 2015-05-20 天津大学 PCCP pipe failure forewarning and monitoring signal processing method based on sound signals
CN109027436A (en) * 2018-09-13 2018-12-18 上海万朗水务科技有限公司 Intelligent pipeline and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104633461A (en) * 2014-12-31 2015-05-20 天津大学 PCCP pipe failure forewarning and monitoring signal processing method based on sound signals
CN109027436A (en) * 2018-09-13 2018-12-18 上海万朗水务科技有限公司 Intelligent pipeline and preparation method thereof

Similar Documents

Publication Publication Date Title
CN202082625U (en) Water transport monitoring system based on intelligent PCCP
KR101098528B1 (en) System and method for watching pipeline
CN207728372U (en) A kind of duct pieces of shield tunnel interannular device for pressure measurement
CN203011415U (en) Monitoring device suitable for using underground or under water
CN203549155U (en) PCCP in intelligentized management system
CN103591982B (en) A kind of monitoring method of electric power tunnel structure problem
CN205001865U (en) Oil gas pipeline monitored control system based on optic fibre
CN206496792U (en) A kind of water supply network operational parameter detection site device
CN203705072U (en) Temperature measuring apparatus
CN203703628U (en) Oil and gas storage and transportation pipeline with leakage alarm function
CN207962119U (en) A kind of building water supply and drainage pipeline and pepe monitoring system
CN112697301A (en) Fully-distributed pipeline erosion monitoring system and method based on optical fiber sensing
CN204401592U (en) Bracing of foundation pit displacement body is out of shape real-time measurement and control system
CN203571437U (en) Intelligent pipeline safety monitoring and early warning system
CN110185936A (en) A kind of gas transmission pipeline detection device
CN206419680U (en) A kind of natural-gas transfer pipeline monitoring device
CN104848779A (en) Embedded type deformation gauge with ultralow elastic modulus and method for assembling the embedded type deformation gauge with ultralow elastic modulus
CN205001869U (en) Underground heat supply pipeline expansion joint equipment
CN213208932U (en) Spiral winding distributed optical fiber pipeline monitoring system
CN205388231U (en) Wireless power supply formula pipeline stress monitored control system
CN204241029U (en) Integrated pressure temperature measurement system
CN112524496A (en) Experimental device for improve system alarm precision is revealed to optic fibre temperature detection water pipe
CN214738310U (en) Device for detecting displacement of underground load box
CN104238525A (en) Monitoring device of passive drainage system
CN201716036U (en) Instrument case

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUANGDONG HAIYUAN PIPELINE CO., LTD.

Free format text: FORMER NAME: ZHONGSHAN YINHE PIPELINE CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 528445, Guangdong, Zhongshan Province town of golden carp Industrial Park

Patentee after: GUANGDONG HAIYUAN PIPELINE CO., LTD.

Address before: 528445, Guangdong, Zhongshan Province town of golden carp Industrial Park

Patentee before: Middle mountain milky way pipeline Co., Ltd

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20161104

CF01 Termination of patent right due to non-payment of annual fee