CN203534900U - Concentrated load application device used during steel beam stability test - Google Patents

Concentrated load application device used during steel beam stability test Download PDF

Info

Publication number
CN203534900U
CN203534900U CN201320712391.0U CN201320712391U CN203534900U CN 203534900 U CN203534900 U CN 203534900U CN 201320712391 U CN201320712391 U CN 201320712391U CN 203534900 U CN203534900 U CN 203534900U
Authority
CN
China
Prior art keywords
concentrated load
load application
application device
loading
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320712391.0U
Other languages
Chinese (zh)
Inventor
张壮南
赵欣
王春刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201320712391.0U priority Critical patent/CN203534900U/en
Application granted granted Critical
Publication of CN203534900U publication Critical patent/CN203534900U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a concentrated load application device used during a steel beam stability test, which comprises a loading ring, a loading box and a loading plate and is characterized in that a poriferous gusset plate arranged at the lower end of the loading ring is connected with the loading box through a steel strand; the loading ring is formed into a rhombic ring through connecting two gusset plates, one poriferous gusset plate, two fixed cone screw gusset plates and four slanting poles. The concentrated load application device has the following benefits: the problems that the concentrated load application device is away from an application point and the sense-preserving force cannot be provided when crankle buckling takes place are solved; the load action area can be reduced to the maximum; the ideal state of the concentrated load application function is approached; the concentrated load application device is convenient to manufacture and simple to operate, and can be recycled.

Description

Girder steel stability test load bringing device
Technical field
the utility model relates to steel construction technical field, and particularly a kind of girder steel stability test load applies and puts.
Background technology
steel construction is compared with xoncrete structure, and steel have the special advantages such as intensity is high, good toughness.Under same bearer power condition, steel sectional dimension of members is little more a lot of than concrete component, so its stable problem is just comparatively outstanding.As main bearing member in steel construction---the stable problem of girder steel is the emphasis that researchist and designer pay close attention to.On beam, having Concentrated load is situation common in member actual loading, so need to study the stability of girder steel under Concentrated load.
at present, less about the stable test of girder steel both at home and abroad, main cause is because charger is when girder steel has side direction bending distortion, is difficult to guarantee that loading Position and load direction are constant.And because the skew of charger may hinder the buckling deformation of beam, cause the test figure measured inaccurate.At present in existing minority stability test, conventional lifting jack applies load, but lifting jack loads and exists two kinds of significant shortcomings: when 1. traditional lifting jack applies load, during girder steel generation bending unstability, because load(ing) point can be displaced sideways and reverse, so lifting jack will depart from test specimen surface, cause continuing again loading, test also will stop.When 2. lifting jack applies load, an application point face normally, can not realize Concentrated load in the virtual condition of a bit, causes test findings and actual forced status not to be inconsistent.In addition,, for the less beam in cross section, the excessive active area of lifting jack seems extremely improper.
Summary of the invention
the purpose of this utility model is to provide a kind of cannot continuation while overcoming beam generation bending unstability and loads, and excessive cannot the realization of power active area a little applies load, can in girder steel stability test process, apply desirable load, and guarantee to continue to apply when girder steel unstability to protect to power, and the thick-and-thin girder steel stability test of loading Position load bringing device.
the present invention realizes like this, it comprises loaded ring, loads case and load plate, the gusset plate with holes that it is characterized in that loaded ring lower end is connected with loading case by steel strand wires, and loaded ring connects into rhombus ring by two gusset plates, a gusset plate with holes, two fixed cone nail gusset plates and four braces.
the utility model beneficial effect is: 1. can guarantee that, when torsional occurs, charger does not leave application point, to provide the guarantor of test needs to power; 2. can reduce to greatest extent load action area, realize the perfect condition that load only puts on a bit; 3. easy to make, can reuse, and simple to operate.
Accompanying drawing explanation
below in conjunction with accompanying drawing, the utility model is further described;
fig. 1 is the structural representation of girder steel stability test load bringing device,
fig. 2 is loaded ring schematic diagram,
fig. 3 is cone nail schematic diagram.
Embodiment
as shown in Fig. 1-3, this girder steel stability test load bringing device comprises loading bores nail 1, brace 2, gusset plate with holes 3, loading case 4, steel strand wires 5, load plate 6, fixed cone nail gusset plate 7, gusset plate 8 and loaded ring 9, the lower end of loaded ring 9 is connected with loading case 4 by steel strand wires 5, loaded ring 9 connects into rhombus ring by two gusset plates 8, one gusset plate with holes 3, two fixed cone nail gusset plates 7 and four braces 2, loading cone nail 1 use bolt is connected on fixed cone nail gusset plate 7, bolt replacing cone easy to connect nail, need not need to tackle; Steel strand wires 5 are through in the hole of gusset plate 3 with holes, connect and load case 4, make to load case and hang under loaded ring, add balancing weight therein and sand carrys out control load, load plate 6, be positioned over test specimen top flange, and by load plate 6 central aperture ideal load points, load plate 6 use fixtures are fixed, and loaded ring 9 is inserted in to test specimen, load cone nail 1 and aim at hole in load plate 6, can load.

Claims (2)

1. a girder steel stability test load bringing device, it comprises loaded ring, loads case and load plate, it is characterized in that the gusset plate with holes of loaded ring lower end is connected with loading case by steel strand wires.
2. Ju girder steel stability test claimed in claim 1 load bringing device, is characterized in that loaded ring connects into rhombus ring by two gusset plates, a gusset plate with holes, two fixed cone nail gusset plates and four braces.
CN201320712391.0U 2013-11-13 2013-11-13 Concentrated load application device used during steel beam stability test Expired - Fee Related CN203534900U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320712391.0U CN203534900U (en) 2013-11-13 2013-11-13 Concentrated load application device used during steel beam stability test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320712391.0U CN203534900U (en) 2013-11-13 2013-11-13 Concentrated load application device used during steel beam stability test

Publications (1)

Publication Number Publication Date
CN203534900U true CN203534900U (en) 2014-04-09

Family

ID=50421095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320712391.0U Expired - Fee Related CN203534900U (en) 2013-11-13 2013-11-13 Concentrated load application device used during steel beam stability test

Country Status (1)

Country Link
CN (1) CN203534900U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103558081A (en) * 2013-11-13 2014-02-05 沈阳建筑大学 Centralized load application device for stability test on steel beam
CN106840895A (en) * 2016-12-23 2017-06-13 南京工程学院 Apply the guarantor of load in a kind of hollow wing balsh beam stability test to power apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103558081A (en) * 2013-11-13 2014-02-05 沈阳建筑大学 Centralized load application device for stability test on steel beam
CN106840895A (en) * 2016-12-23 2017-06-13 南京工程学院 Apply the guarantor of load in a kind of hollow wing balsh beam stability test to power apparatus

Similar Documents

Publication Publication Date Title
CN203534900U (en) Concentrated load application device used during steel beam stability test
CN203095401U (en) Clasp type rolling-over hoisting tail lug fixture
CN201999655U (en) Conversion device connecting tower crane and self-jacking construction platform
CN103558081A (en) Centralized load application device for stability test on steel beam
CN202164813U (en) Anti-inclination device for scaffold lifting in construction
CN203889888U (en) Steel plate hoisting clamp
CN209820790U (en) Device for crane load test
CN204751918U (en) Light multi -functional lifting hook group
CN204823664U (en) Adjustable combination hoist
CN203821939U (en) Round tower foot plate for +/- 800kV ultra high voltage direct current line
CN206468623U (en) The magnetic connecting structure that a kind of beam splices with beam
CN204454225U (en) A kind of welded structure of solid drawn pipe is without moment of flexure support beam
CN203568661U (en) Built-in tail-sliding lifting lug
CN203307933U (en) Reinforcing connecting part of steel structure
CN204281077U (en) Steel structure on the case beam navigating car weight-lifting equipment
CN205294711U (en) Balanced specialized tool of high -efficient adjustment beam -pumping unit
CN103303815A (en) Tower crane standard knot
CN211341142U (en) Steel structure connecting device
CN204001817U (en) Combined support frame
CN204326122U (en) Foundation pile pressure-resistant static load test girder connector
CN104444797B (en) Boat bassinet structure
CN204588428U (en) A kind of stern tube shaft brush hoisting fixture
CN204847746U (en) But hoist displacement hoist
CN204198248U (en) A kind of box hanging beam
CN203656051U (en) Heavy type gravity loading block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140409

Termination date: 20181113

CF01 Termination of patent right due to non-payment of annual fee