CN203533578U CN201320578316.XU CN201320578316U CN203533578U CN 203533578 U CN203533578 U CN 203533578U CN 201320578316 U CN201320578316 U CN 201320578316U CN 203533578 U CN203533578 U CN 203533578U
Authority
CN
China
Prior art keywords
fire grate
heater
inlet pipe
boiler
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320578316.XU
Other languages
Chinese (zh)
Inventor
林旭虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongqiao Shanghai business district new energy investment & Development Co., Ltd.
Original Assignee
林旭虹
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 林旭虹 filed Critical 林旭虹
Priority to CN201320578316.XU priority Critical patent/CN203533578U/en
Application granted granted Critical
Publication of CN203533578U publication Critical patent/CN203533578U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model relates to the technical field of boilers, in particular to a boiler grate dust removal and purging device. The dust removal and purging device comprises a boiler body, a fan, an air compressor and a gas storage tank. A grate is arranged in the boiler body. The fan, the air compressor and the gas storage tank are arranged outside the boiler body. An air inlet pipe is fixedly connected to the fan, and the other end of the air inlet pipe is located at the position, above the grate, in the boiler body. One end of the air compressor is communicated with one end of the gas storage tank through a pipeline, a gas inlet pipe is fixedly installed on the gas storage tank, and the other end of the gas inlet pipe is located at the position, above the grate, in the boiler body. The boiler grate dust removal and purging device is reasonable in structure and convenient to use. The air compressor and the fan are combined, dust deposited on the grate can be rapidly removed in time, and therefore working efficiency is improved.

Description

Boiler fire grate deashing blow device
Technical field
The utility model relates to boiler technology field, is a kind of boiler fire grate deashing blow device.
Background technology
Because boiler belongs to the equipment of long-term operation, therefore after fuel combustion, can on fire grate, produce dust stratification that particle is larger or because dust stratification too much forms dust stratification layer, be all generally to adopt labor cleaning, so just exist labour intensity large, clear up the inefficient problem that wastes time and energy.
Summary of the invention
The utility model provides a kind of boiler fire grate deashing blow device, has overcome the deficiency of above-mentioned prior art, and it can effectively solve the problem that the dust stratification labor cleaning on fire grate is wasted time and energy.
The technical solution of the utility model is achieved like this: a kind of boiler fire grate deashing blow device, comprise body of heater, blower fan, air compressor machine and air accumulator, in body of heater, there is fire grate, in body of heater outside, be provided with blower fan, air compressor machine and air accumulator, on blower fan, be fixedly connected with blast pipe, the other end of blast pipe is positioned at the body of heater of fire grate top, one end of air compressor machine is connected with one end of air accumulator by pipeline, on air accumulator, be installed with air inlet pipe, the other end of air inlet pipe is positioned at the body of heater of fire grate top.
The above-mentioned termination that is positioned at the blast pipe of body of heater is skewed towards fire grate.
The termination of above-mentioned blast pipe and the angle between fire grate are between 20 degree are spent to 45.
Above-mentionedly be positioned at the blast pipe of body of heater and the termination of air inlet pipe is all duckbill.
Distance between above-mentioned air inlet pipe and fire grate is between 2 centimetres to 5 centimetres.
Above-mentionedly be positioned at the blast pipe of body of heater and the outside of air inlet pipe is all fixed with high-temperature-resistant layer.
The utility model is rational in infrastructure, easy to use, by the combination of air compressor machine and blower fan is set, can clear up fast in time fire grate dust stratification, has therefore improved operating efficiency.
Accompanying drawing explanation
Fig. 1 is that master of the present utility model looks perspective structure schematic diagram.
Coding in figure is respectively: 1 is body of heater, and 2 is blower fan, and 3 is air compressor machine, and 4 is air accumulator, and 5 is fire grate, and 6 is blast pipe, and 7 is pipeline, and 8 is air inlet pipe.
The specific embodiment
As shown in Figure 1, this boiler fire grate deashing blow device, comprise body of heater 1, blower fan 2, air compressor machine 3 and air accumulator 4, in body of heater 1, there is fire grate 5, in body of heater 1 outside, be provided with blower fan 2, air compressor machine 3 and air accumulator 4, on blower fan 2, be fixedly connected with blast pipe 6, the other end of blast pipe 6 is positioned at the body of heater 1 of fire grate 5 tops, one end of air compressor machine 3 is connected with one end of air accumulator 4 by pipeline 7, on air accumulator 4, be installed with air inlet pipe 8, the other end of air inlet pipe 8 is positioned at the body of heater of fire grate 5 tops.Like this, while having accumulated certain dust stratification on fire grate 5, can start blower fan 2 or air compressor machine 3, the dust stratification on fire grate 5 is purged, can clear up fast in time fire grate dust stratification like this, therefore improve operating efficiency.
As shown in Figure 1, the termination that is positioned at the blast pipe 6 of body of heater 1 is skewed towards fire grate 5.Be convenient to like this wind except dust stratification.
As shown in Figure 1, as required, the angle between the termination of blast pipe 6 and fire grate 5 is between 20 degree are spent to 45.
As shown in Figure 1, in order to improve purging scope, be positioned at the blast pipe 6 of body of heater 1 and the termination of air inlet pipe 8 is all duckbill.
As shown in Figure 1, as required, the distance between air inlet pipe 8 and fire grate 5 is between 2 centimetres to 5 centimetres.
As required, be positioned at the blast pipe 6 of body of heater 1 and the outside of air inlet pipe 8 is all fixed with high-temperature-resistant layer.Can prevent that like this high temperature from causing pipe fitting to reduce service life.

Claims (10)

1. a boiler fire grate deashing blow device, it is characterized in that comprising body of heater (1), blower fan (2), air compressor machine (3) and air accumulator (4), in body of heater (1), there is fire grate (5), in body of heater (1) outside, be provided with blower fan (2), air compressor machine (3) and air accumulator (4), on blower fan (2), be fixedly connected with blast pipe (6), the other end of blast pipe (6) is positioned at the body of heater (1) of fire grate (5) top, one end of air compressor machine (3) is connected with one end of air accumulator (4) by pipeline (7), on air accumulator (4), be installed with air inlet pipe (8), the other end of air inlet pipe (8) is positioned at the body of heater (1) of fire grate (5) top.
2. boiler fire grate deashing blow device according to claim 1, the termination that it is characterized in that being positioned at the blast pipe (6) of body of heater (1) is skewed towards fire grate (5).
3. boiler fire grate deashing blow device according to claim 2, it is characterized in that the termination of blast pipe (6) and the angle between fire grate (5) at 20 degree between 45 degree.
4. according to the boiler fire grate deashing blow device described in claim 1 or 2 or 3, it is characterized in that being positioned at the blast pipe (6) of body of heater (1) and the termination of air inlet pipe (8) is all duckbill.
5. according to the boiler fire grate deashing blow device described in claim 1 or 2 or 3, it is characterized in that distance between air inlet pipe (8) and fire grate (5) is between 2 centimetres to 5 centimetres.
6. boiler fire grate deashing blow device according to claim 4, is characterized in that distance between air inlet pipe (8) and fire grate (5) is between 2 centimetres to 5 centimetres.
7. according to the boiler fire grate deashing blow device described in claim 1 or 2 or 3, it is characterized in that being positioned at the blast pipe (6) of body of heater (1) and the outside of air inlet pipe (8) is all fixed with high-temperature-resistant layer.
8. boiler fire grate deashing blow device according to claim 4, is characterized in that being positioned at the blast pipe (6) of body of heater (1) and the outside of air inlet pipe (8) is all fixed with high-temperature-resistant layer.
9. boiler fire grate deashing blow device according to claim 5, is characterized in that being positioned at the blast pipe (6) of body of heater (1) and the outside of air inlet pipe (8) is all fixed with high-temperature-resistant layer.
10. boiler fire grate deashing blow device according to claim 6, is characterized in that being positioned at the blast pipe (6) of body of heater (1) and the outside of air inlet pipe (8) is all fixed with high-temperature-resistant layer.
CN201320578316.XU 2013-09-11 2013-09-11 Boiler grate dust removal and purging device Expired - Fee Related CN203533578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320578316.XU CN203533578U (en) 2013-09-11 2013-09-11 Boiler grate dust removal and purging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320578316.XU CN203533578U (en) 2013-09-11 2013-09-11 Boiler grate dust removal and purging device

Publications (1)

Publication Number Publication Date
CN203533578U true CN203533578U (en) 2014-04-09

Family

ID=50419779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320578316.XU Expired - Fee Related CN203533578U (en) 2013-09-11 2013-09-11 Boiler grate dust removal and purging device

Country Status (1)

Country Link
CN (1) CN203533578U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105651929A (en) * 2016-03-02 2016-06-08 祝培明 Intelligent cupellation furnace for fire assaying

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105651929A (en) * 2016-03-02 2016-06-08 祝培明 Intelligent cupellation furnace for fire assaying
CN105651929B (en) * 2016-03-02 2017-07-18 祝培明 Intelligent Fire Assaying cupel(lation) furnace

Similar Documents

Publication Publication Date Title
CN202328178U (en) Energy-saving and emission-reducing combustion boiler device
CN202203970U (en) Secondary energy saving and utilizing device for furnace exhaust gas waste heat
CN203533578U (en) Boiler grate dust removal and purging device
CN105674314A (en) Dust-settling compartment of biomass hot blast heater
CN205299908U (en) Energy -saving heating furnace
CN204007180U (en) A kind of waste gas residual heat recycling and processing device
CN205002357U (en) Boiler with preheating water tank
CN202328332U (en) Air preheating device utilizing boiler smoke heat sufficiently
CN204593425U (en) The dedusting of flue gas efficient electric and fume afterheat utilize combination unit
CN204665238U (en) Waste heat recovery box
CN201811259U (en) Dry dust collector structure
CN104165349A (en) Boiler waste heat utilizing device
CN220097310U (en) Ash bucket heating system taking waste heat of boiler flue gas as heat source
CN203310267U (en) Environment-friendly energy-saving device for calcium carbide furnace
CN203161356U (en) Solar photothermal energy storage system
WO2017075969A1 (en) Cyclone coarse coal powder gasification combustion device
CN202024317U (en) Novel pulverized-coal fired boiler system
CN102679379A (en) Efficient energy-saving biomass burner system
CN202328209U (en) High-efficiency energy-saving combustion system
CN202484976U (en) Special boiler for biomass fuel
CN202692237U (en) Warm air furnace
CN202188474U (en) Fume recycling device of melting furnace
CN202494302U (en) Cotton-drying hot wind generating device
CN202253545U (en) Flue gas waste heat recovery device
CN201429334Y (en) Waste heat converting device of graphitizing furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI HONGQIAO BUSINESS DISTRICT NEW ENERGY INV

Free format text: FORMER OWNER: LIN XUHONG

Effective date: 20150702

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150702

Address after: 201105 room 2, building 8, No. 206, Lane 4022, Shanghai Qing Ping Road, Shanghai, Minhang District

Patentee after: Hongqiao Shanghai business district new energy investment & Development Co., Ltd.

Address before: 362804, 29, South Village Road, Po Po Town, Quangang District, Fujian, Quanzhou

Patentee before: Lin Xuhong

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140409

Termination date: 20160911