CN203526868U CN201320384104.8U CN201320384104U CN203526868U CN 203526868 U CN203526868 U CN 203526868U CN 201320384104 U CN201320384104 U CN 201320384104U CN 203526868 U CN203526868 U CN 203526868U
Authority
CN
China
Prior art keywords
groove
pipeline
pipe
prefabricated
prefabrication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320384104.8U
Other languages
Chinese (zh)
Inventor
王泳文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Third Construction Co Ltd
Original Assignee
China National Chemical Engineering Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Third Construction Co Ltd filed Critical China National Chemical Engineering Third Construction Co Ltd
Priority to CN201320384104.8U priority Critical patent/CN203526868U/en
Application granted granted Critical
Publication of CN203526868U publication Critical patent/CN203526868U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Arc Welding In General (AREA)

Abstract

The utility model relates to a pipe welded junction prefabrication grouping device comprising a prefabrication platform used for placing pipes. Support feet are arranged under the platform. The pipes to be welded are placed in a first groove or a second groove simultaneously and group welding of pipe welded junctions are performed through location by groove sides of the first groove and the second groove. Therefore, the work can be finished by only one pipe worker and one welder, the working efficiency is increased and the quality of butt joint of the welded junctions is guaranteed.

Description

Prefabricated group of pipe welding port is to device
Technical field
The utility model relates to a kind of pipeline, relates to specifically prefabricated group of a kind of pipe welding port to device.
Background technology
The current job site in installing engineering project, conventional pipe prefabrication group butt welding mouth method generally adopt ground group to or the right mode of platform group carry out, group is to being plumber of needs, a welder, an auxiliary work cooperation, the counterpart time is long, and the bad control of weld bond unfitness of butt joint, efficiency is lower.
Utility model content
The purpose of this utility model is to provide prefabricated group of a kind of pipe welding port to device, and this device can guarantee the joint quality of weld bond, can also save the counterpart time simultaneously, and production efficiency is high.
For achieving the above object, the utility model has adopted following technical scheme: comprise for placing the prefabricated platform of pipeline, described platform below is provided with feet, prefabricated platform comprises for placing first, second groove of large-diameter pipeline and small diameter pipeline, first, second described groove is set up in parallel, and the top of both mutually close cell walls of first, second groove is connected, and the cross section of the first groove is square, and the cross section of the second described groove is V-type.
On the second groove of the present utility model, be also provided with the fastener for clamping pipe.
Fastener of the present utility model comprises the support bar being fixed on the second groove, and described support bar is provided with the adjusting bolt of fastening pipeline.
As shown from the above technical solution, the utility model is put into the first groove or the second groove by pipeline to be welded simultaneously, the welding of pipe welding port is carried out in location by the first groove or the second groove trough rim, only need a plumber, a welder can finish the work, improved operating efficiency, the quality of weld bond docking simultaneously is also guaranteed.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described further:
Prefabricated group of a kind of pipe welding port as shown in Figure 1, to device, comprises that prefabricated platform 1 below is provided with feet 2 for placing the prefabricated platform 1 of pipeline.
Further, prefabricated platform 1 comprises that first, second groove 11,12 is set up in parallel for placing first, second groove 11,12 of large-diameter pipeline and small diameter pipeline, and the top of first, second groove 11,12 both mutually close cell walls is connected.
Further, the cross section of the first groove 11 is square, is used for placing the pipeline of Large Diameter Pipeline, and the cross section of the second groove 12 is V-type, is used for placing the pipeline of pipe with small pipe diameter.The first groove can directly adopt channel-section steel to make, and the second groove can directly adopt angle steel to make.
Further, on the second groove 12, be also provided with the fastener 3 for clamping pipe.Be that small diameter pipeline can also further clamp by fastener 3.
Further, fastener 3 comprises the support bar 31 being fixed on the second groove 12, and support bar 31 is provided with the adjusting bolt 32 of fastening pipeline.
Using method of the present utility model is as follows:
Pipeline to be welded is put into the first groove or the second groove simultaneously, and the cell wall by the first groove or the second groove positions pipeline, then welds, and the small diameter pipeline of putting into the second groove also can carry out fastening location by the adjusting bolt of fastener simultaneously.
In sum, the beneficial effects of the utility model are: 1) effectively saved the counterpart time of pipeline enclosure, guaranteed the quality of weld bond; 2) can reduce human input, improve operating efficiency, reduce cost; 3) turnover utilization rate of the present utility model is high, practical.
Above-described embodiment is described preferred embodiment of the present utility model; not scope of the present utility model is limited; do not departing under the prerequisite of the utility model design spirit; various distortion and improvement that those of ordinary skills make the technical solution of the utility model, all should fall in the definite protection domain of the utility model claims.

Claims (3)

1. prefabricated group an of pipe welding port is to device, it is characterized in that: comprise the prefabricated platform (1) for placing pipeline, described prefabricated platform (1) below is provided with feet (2), described prefabricated platform (1) comprises first, second groove (11,12) for placing large-diameter pipeline and small diameter pipeline, first, second described groove (11,12) is set up in parallel, and the top of both mutually close cell walls of first, second groove (11,12) is connected, the cross section of described the first groove (11) is square, and the cross section of described the second groove (12) is V-type.
2. prefabricated group of pipe welding port according to claim 1, to device, is characterized in that: on described the second groove (12), be also provided with the fastener (3) for clamping pipe.
3. prefabricated group of pipe welding port according to claim 2 is to device, it is characterized in that: described fastener (3) comprises the support bar (31) being fixed on the second groove (12), described support bar (31) is provided with the adjusting bolt (32) of fastening pipeline.
CN201320384104.8U 2013-06-28 2013-06-28 Pipe welded junction prefabrication grouping device Expired - Lifetime CN203526868U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320384104.8U CN203526868U (en) 2013-06-28 2013-06-28 Pipe welded junction prefabrication grouping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320384104.8U CN203526868U (en) 2013-06-28 2013-06-28 Pipe welded junction prefabrication grouping device

Publications (1)

Publication Number Publication Date
CN203526868U true CN203526868U (en) 2014-04-09

Family

ID=50413130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320384104.8U Expired - Lifetime CN203526868U (en) 2013-06-28 2013-06-28 Pipe welded junction prefabrication grouping device

Country Status (1)

Country Link
CN (1) CN203526868U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103921132A (en) * 2014-04-30 2014-07-16 中冶天工上海十三冶建设有限公司 Quick prefabrication device for slab continuous caster pipeline
CN103949827A (en) * 2014-05-07 2014-07-30 中国十九冶集团有限公司 Welding fast assembly rack

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103921132A (en) * 2014-04-30 2014-07-16 中冶天工上海十三冶建设有限公司 Quick prefabrication device for slab continuous caster pipeline
CN103921132B (en) * 2014-04-30 2018-10-16 中冶天工上海十三冶建设有限公司 Quick prefabricated device for slab caster pipeline
CN103949827A (en) * 2014-05-07 2014-07-30 中国十九冶集团有限公司 Welding fast assembly rack
CN103949827B (en) * 2014-05-07 2015-09-16 中国十九冶集团有限公司 Welding fast assembly rack

Similar Documents

Publication Publication Date Title
CN203062190U (en) Butt joint regulation device for thick-wall boiler tube
CN201740703U (en) Pipeline pressure testing device
CN205271305U (en) Group of ocean module drilling machine high pressure line is to using special fixture
CN202291925U (en) Gas bottle device of electric welder
CN203526868U (en) Pipe welded junction prefabrication grouping device
MX2008014547A (en) Apparatus and method for repairing a core spray line elbow weld joint.
CN203471166U (en) Nitrogen charging platform for welding of water collector
CN204195165U (en) A kind of pipeline quick-assembling positioning tool alignment device
CN202047367U (en) Integral cable clamp for stayed cables
CN201704801U (en) Steel pipe truss and H-shaped steel column connecting member
CN203062189U (en) Adjusting device for butting installation of oxygen pipeline
CN206263522U (en) A kind of pipe fitting spot welding fixture (SWFX)
CN203343689U (en) Special clamp and welding system applied to pipeline assembly welding
CN202607119U (en) Automatically charging device of mast section auto-welding line
CN204221222U (en) For the back filled argon protection device of large diameter steel pipe welding
CN203956307U (en) A kind of pipeline welding gas shield device
CN202831658U (en) Butt joint positioning device of aerial hoisting steel beams
CN202716020U (en) Jacket for butt-welding stainless steel tubes
CN202037430U (en) Rotatable T-shaped welding pipe support
CN202185707U (en) Tooling fixture for framework structure
CN203330611U (en) Adjustable pipeline assembly welding bracket
CN203526845U (en) Fixing and supporting device for flat-bulb steel butt joint
CN203804480U (en) Round pipe welding tool
CN203018898U (en) Anti-reversion device for nut welding in automobile industry
CN203485014U (en) Pipe buffing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140409