CN203522065U - Vertical-section phase-isolated bus conductor temporary supporting structure - Google Patents

Vertical-section phase-isolated bus conductor temporary supporting structure Download PDF

Info

Publication number
CN203522065U
CN203522065U CN201320698350.0U CN201320698350U CN203522065U CN 203522065 U CN203522065 U CN 203522065U CN 201320698350 U CN201320698350 U CN 201320698350U CN 203522065 U CN203522065 U CN 203522065U
Authority
CN
China
Prior art keywords
conductor
vertical
shell
connector
horizontal connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320698350.0U
Other languages
Chinese (zh)
Inventor
刘火军
郑睿
范明波
陈文刚
张建兵
康健
毕东辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG ALFADACHI ELECTRIC CO Ltd
Shandong Electric Power Engineering Consulting Institute Corp Ltd
Original Assignee
SHANDONG ALFADACHI ELECTRIC CO Ltd
Shandong Electric Power Engineering Consulting Institute Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG ALFADACHI ELECTRIC CO Ltd, Shandong Electric Power Engineering Consulting Institute Corp Ltd filed Critical SHANDONG ALFADACHI ELECTRIC CO Ltd
Priority to CN201320698350.0U priority Critical patent/CN203522065U/en
Application granted granted Critical
Publication of CN203522065U publication Critical patent/CN203522065U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Installation Of Bus-Bars (AREA)

Abstract

The utility model provides a vertical-section phase-isolated bus conductor temporary supporting structure. The problem that a conductor drops or falls off because of gravity in the installation process of a vertical-section phase-isolated bus can be solved. The vertical-section phase-isolated bus conductor temporary supporting structure comprises two transverse conductor connecting bodies and two transverse shell connecting bodies. The two transverse conductor connecting bodies are arranged on a conductor, are respectively arranged above and below a conductor expansion joint and are connected as a whole through a vertical conductor connecting body. The two transverse shell connecting bodies are arranged on a shell, are respectively arranged above and below a shell expansion joint and are connected as a whole through a vertical shell connecting body. Each transverse conductor connecting body and the corresponding transverse shell connecting body which are located in the same horizontal plane are connected as a whole through a connecting assembly.

Description

Vertical section phaseisolated bus conductor temporary support structure
Technical field
The utility model relates to a kind of vertical section phaseisolated bus conductor temporary support structure, belongs to isolated-phase enclosed bus manufacturing technology field.
Background technology
Phaseisolated bus generally has level to install and at right angle setting, between phaseisolated bus shell and conductor, by insulator, supports, and level is installed comparatively simple, but at right angle setting is because tenesmus or obscission easily appear in the Action of Gravity Field of conductor.Although can reduce the length of vertical section when phaseisolated bus tendency designs as far as possible, but the particularity due to some Power Plants, it is unavoidable designing longer vertical section, for example some large hydropower station generator floors and main transformer layer have the drop of tens meters, therefore also need to set about from enclosed busbar structure.
Tradition phaseisolated bus vertical section installation method is usually with wood, to fix between shell conductor, due to moving of scene, likely occurs that wood is loosening on-the-spot, has certain unreliability.
Utility model content
The utility model object is to provide a kind of vertical section phaseisolated bus conductor temporary support structure, can solve the situation that in vertical phaseisolated bus section installation process, conductor drops or comes off due to Action of Gravity Field.
To achieve these goals, the utility model is by the following technical solutions:
A vertical section phaseisolated bus conductor temporary support structure, is characterized in that: comprise the horizontal connector of two conductors and the horizontal connector of two shells; The horizontal connector of two conductors is arranged on conductor, and is separately positioned on conductor expansion joint top and below, and connects as one by the vertical connector of conductor; The horizontal connector of two shells is arranged on shell, and is separately positioned on shell expansion joint top and below, and connects as one by the vertical connector of shell; The horizontal connector of conductor and the horizontal connector of shell in same level connect as one by coupling assembling.
Preferably, the vertical connector of conductor is arranged between the horizontal connector of two conductors, and two ends are welded as a whole with the horizontal connector of two conductors respectively.
Preferably, the vertical connector of shell is arranged between the horizontal connector of two shells, and two ends are welded as a whole with the horizontal connector of two shells respectively.
Preferably, coupling assembling is screw-nut assembly.
Preferably, the horizontal connector of conductor and the horizontal connector of shell are groove aluminium.
Preferably, the vertical connector of conductor and the vertical connector of shell are aluminium sheet.
The beneficial effects of the utility model:
The utility model is by arranging the horizontal connector of conductor and the horizontal connector of two shells, reinforcing prevents the falling phenomenon of vertical phaseisolated bus section conductor, greatly convenience site operation, also improved on-the-spot construction safety simultaneously, can in some hydroelectric stations and the longer power plant of other vertical sections, be widely used; Compact overall structure, reasonable in design, it is convenient to implement.
Accompanying drawing explanation
Fig. 1 is that the master of the utility model embodiment looks schematic diagram.
Fig. 2 is the schematic side view of the utility model embodiment.
In figure 1, shell, 2, conductor, 3, screw-nut assembly, 4, the horizontal connector of conductor, 5, the horizontal connector of shell, 6, the vertical connector of conductor, 7, the vertical connector of shell, 101, shell expansion joint, 201, conductor expansion joint.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is done further in detail, so that those skilled in the art better understand the utility model.
With reference to accompanying drawing 1,2, a kind of vertical section phaseisolated bus conductor temporary support structure, comprises the horizontal connector 4 of two conductors and the horizontal connector 5 of two shells; The horizontal connector 4 of two conductors is arranged on conductor 2, and is separately positioned on conductor expansion joint 201 tops and below, and connects as one by the vertical connector 6 of conductor; The horizontal connector 5 of two shells is arranged on shell 1, and is separately positioned on shell expansion joint 101 tops and below, and connects as one by the vertical connector 7 of shell; The horizontal connector 4 of conductor and the horizontal connector 5 of shell in same level connect as one by coupling assembling.
In the present embodiment, the vertical connector 6 of conductor is arranged between the horizontal connector 4 of two conductors, and two ends are welded as a whole with the horizontal connector 4 of two conductors respectively.
In the present embodiment, the vertical connector 7 of shell is arranged between the horizontal connector 5 of two shells, and two ends are welded as a whole with the horizontal connector 5 of two shells respectively.
In the present embodiment, coupling assembling is screw-nut assembly 3.
In the present embodiment, the horizontal connector 5 of the horizontal connector 4 of conductor and shell is groove aluminium; The vertical connector 7 of the vertical connector 6 of conductor and shell is aluminium sheet.
The utility model using method is as follows:
The difference horizontal connector 4 of fixed conductor and the horizontal connector 5 of shell on conductor 2 and shell 1, with screw-nut assembly 3, the horizontal connector 4 of conductor is connected with the horizontal connector 5 of shell respectively, alignment, fixing, the horizontal connector 4 of conductor and 5 of the horizontal connectors of shell are welded on conductor 2 and shell 1, and will be fixed on the horizontal connector 4 of upper and lower conductor and the horizontal connector 5 of shell welds together with the vertical connector 6 of conductor and the vertical connector 7 of shell, so just conductor 2 and shell 1 are connected together, while constructing at the scene, with scaffold, fixed shell 1, conductor 2 just there will not be falling phenomenon.In site operation, after treating conductor 2 welding, now whole phaseisolated bus conductor is practiced into one and is carried, can be by the horizontal connector 4 of welding conductors and horizontal connector 5 removals of shell.
Basic principle of the present utility model and advantage have more than been described.The utility model is not restricted to the described embodiments, and in the prerequisite that does not depart from the utility model scope, those skilled in the art can do many changes and improvements as required.The utility model protection range should be defined by appending claims and equivalent thereof.

Claims (6)

1. a vertical section phaseisolated bus conductor temporary support structure, is characterized in that: comprise the horizontal connector of two conductors and the horizontal connector of two shells; The horizontal connector of two conductors is arranged on conductor, and is separately positioned on conductor expansion joint top and below, and connects as one by the vertical connector of conductor; The horizontal connector of two shells is arranged on shell, and is separately positioned on shell expansion joint top and below, and connects as one by the vertical connector of shell; The horizontal connector of conductor and the horizontal connector of shell in same level connect as one by coupling assembling.
2. vertical section phaseisolated bus conductor temporary support structure according to claim 1, it is characterized in that: the vertical connector of conductor is arranged between the horizontal connector of two conductors, and two ends is welded as a whole with the horizontal connector of two conductors respectively.
3. vertical section phaseisolated bus conductor temporary support structure according to claim 1, it is characterized in that: the vertical connector of shell is arranged between the horizontal connector of two shells, and two ends is welded as a whole with the horizontal connector of two shells respectively.
4. vertical section phaseisolated bus conductor temporary support structure according to claim 1, is characterized in that: coupling assembling is screw-nut assembly.
5. according to vertical section phaseisolated bus conductor temporary support structure described in claim 1 to 4 any one, it is characterized in that: the horizontal connector of conductor and the horizontal connector of shell are groove aluminium.
6. according to vertical section phaseisolated bus conductor temporary support structure described in claim 1 to 4 any one, it is characterized in that: the vertical connector of conductor and the vertical connector of shell are aluminium sheet.
CN201320698350.0U 2013-11-07 2013-11-07 Vertical-section phase-isolated bus conductor temporary supporting structure Expired - Fee Related CN203522065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320698350.0U CN203522065U (en) 2013-11-07 2013-11-07 Vertical-section phase-isolated bus conductor temporary supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320698350.0U CN203522065U (en) 2013-11-07 2013-11-07 Vertical-section phase-isolated bus conductor temporary supporting structure

Publications (1)

Publication Number Publication Date
CN203522065U true CN203522065U (en) 2014-04-02

Family

ID=50380940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320698350.0U Expired - Fee Related CN203522065U (en) 2013-11-07 2013-11-07 Vertical-section phase-isolated bus conductor temporary supporting structure

Country Status (1)

Country Link
CN (1) CN203522065U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113808798A (en) * 2021-09-14 2021-12-17 西安交通大学 Ultra/extra-high voltage GIS/GIL bus
CN114725862A (en) * 2022-05-06 2022-07-08 江苏大全封闭母线有限公司 Fixing tool for flexible connection of phase isolated bus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113808798A (en) * 2021-09-14 2021-12-17 西安交通大学 Ultra/extra-high voltage GIS/GIL bus
CN114725862A (en) * 2022-05-06 2022-07-08 江苏大全封闭母线有限公司 Fixing tool for flexible connection of phase isolated bus
CN114725862B (en) * 2022-05-06 2024-05-14 大全集团有限公司 Fixing tool for soft connection of phase separation bus

Similar Documents

Publication Publication Date Title
CN203522065U (en) Vertical-section phase-isolated bus conductor temporary supporting structure
CN202049201U (en) Photovoltaic test system and shielding support thereof
CN104295147B (en) A kind of framework being applicable to transformer station's outlet
CN108963948A (en) A kind of lightning protection device for super large formed steel construction radar
CN112234367A (en) Vertical grounding device in tower footing range of power transmission line tower
CN207283484U (en) A kind of photovoltaic module
CN203983518U (en) Substation equipment ground structure
CN202282609U (en) Comprehensive lightning protection system for railway station signal tower
CN102891439A (en) Medium-voltage side hybrid gas insulated switchgear (HGIS) distribution device for ultrahigh voltage intelligent substation
CN204590410U (en) A kind of outdoor power transformation framework cantilever steel girder
CN201883728U (en) DC filter structural frame for converter station
CN205637794U (en) Overhead line commutation steel pipe pole
CN203491951U (en) Solar power generation system of power transmission line tower
CN203300475U (en) Insulation pull rod
CN204967709U (en) A modularization photovoltaic support for flat roof deck
CN211342030U (en) Four-column double-oblique-beam layered framework of terminal station
CN206034991U (en) 330kV sail union type three -phase goes out line knot perpendicularly to be constructed
CN210957754U (en) Mounting structure of outdoor cable terminal
CN204046304U (en) A kind of generator set frame
CN209461365U (en) A kind of three-position switch
CN204835327U (en) Integrated transformer substation of half open -type of 110kV
CN205039496U (en) Whole prefabricated cable support
CN203230203U (en) 500kV multi-direction multi-level lattice type angle steel full-combined framework
CN204794821U (en) Fixed solar energy ground mounting system
CN211018713U (en) Large-scale photovoltaic module's installation pylon

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

Termination date: 20181107

CF01 Termination of patent right due to non-payment of annual fee