CN203518560U - Rotary steel kiln pipeline piece circulation air system - Google Patents

Rotary steel kiln pipeline piece circulation air system Download PDF

Info

Publication number
CN203518560U
CN203518560U CN201320457015.1U CN201320457015U CN203518560U CN 203518560 U CN203518560 U CN 203518560U CN 201320457015 U CN201320457015 U CN 201320457015U CN 203518560 U CN203518560 U CN 203518560U
Authority
CN
China
Prior art keywords
pipeline
air
wind
air inlet
kiln
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320457015.1U
Other languages
Chinese (zh)
Inventor
燕江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Pinxin Machinery Co., Ltd.
Original Assignee
SICHUAN PINXIN MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN PINXIN MACHINERY Co Ltd filed Critical SICHUAN PINXIN MACHINERY Co Ltd
Priority to CN201320457015.1U priority Critical patent/CN203518560U/en
Application granted granted Critical
Publication of CN203518560U publication Critical patent/CN203518560U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Muffle Furnaces And Rotary Kilns (AREA)
  • Drying Of Solid Materials (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model discloses a rotary steel kiln pipeline piece circulation air system which comprises a fan arranged on a kiln. An air inlet of the fan is connected with an air inlet main pipeline, an air outlet of the fan is connected with an air outlet main pipeline, the air inlet main pipeline is composed of an inner air inlet pipeline and an outer air inlet pipeline, the air outlet main pipeline is composed of an inner air outlet pipeline and an outer air outlet pipeline, one end of the inner air inlet pipeline is connected with one end of the outer air inlet pipeline through a hot air communication pipeline, the other end of the inner air inlet pipeline is connected with the inner air outlet pipeline through the fan, and the other end of the outer air inlet pipeline is connected with the outer air outlet pipeline through the fan. The inner air inlet pipeline and the outer air inlet pipeline are correspondingly provided with an inner circulation air pipeline and an outer circulation air pipeline, and the inner air outlet pipeline and the outer air outlet pipeline are respectively provided with an upper air outlet branch pipeline and a lower air outlet branch pipeline. The rotary steel kiln pipeline piece circulation air system solves the phenomenon of dry airflow layering, so that middle layers and lower layers of green bricks can be completely dried, heat energy of fired bricks can be fully utilized to dry wet bricks in front, the heat energy is given to full play, and the good effects of environmental friendliness, energy conservation and emission reduction are achieved.

Description

Rotation steel kiln pipeline member wind circulating system
Technical field
The utility model relates to a kind of air feed system, particularly a kind of wind circulating system for rotary kiln.
Background technology
Rotary kiln owner will partly consist of kiln body, driving wheel, driven pulley, Crossed Circle track etc.Kiln body generally adopts high-quality steel welding forming, and it is some that driving wheel is equipped with respectively on both sides, and driven wheel operates on a Crossed Circle track, thereby drives the movement of whole kiln body.On kiln body, be disposed with from front to back dryer section, preheating section, furnace zone, soaking zone, cooling section, when kiln body moves ahead, the adobe of including in from kiln Qianmen, completes the movement along with kiln body dry, preheating, is exposed to outside kiln tail-gate after the overall process such as burning till.From 2006 to over 2012, for the pipeline of the pipeline wind circulating system of novel environment friendly rotary energy saving kiln, be all to adopt at the construction field (site) to make, cause production scene chaotic, it is improper that material rationally utilizes, and adds that the tool of production is incomplete, causes producing the duration long; Processing dimension shape is not in place, can not reach consistent with length with the arc of the inside and outside pipeline of kiln, often has very large error, causes that installation difficulty is large, presentation quality is poor.Existing rotary kiln dryer section does not have design cycle wind system, and dry gas stream lamination is serious, and in adobe, lower floor is not exclusively dry, occurs the phenomenon of falling base, and roasting progress is slow, and finished product also there will be dumb sound brick.
Utility model content
For the problem of above-mentioned existence, the utility model provides a kind of rotation steel kiln pipeline member wind circulating system, has solved dry gas stream lamination, can make lower floor in adobe be dried completely.
The purpose of this utility model realizes by following technical proposals: a kind of rotation steel kiln pipeline member wind circulating system, comprise the blower fan being arranged on kiln, the air inlet of blower fan connects air intake total pipeline, air outlet connects air-out total pipeline, air intake total pipeline is comprised of interior intake stack and external air inlet pipeline, air-out total pipeline is comprised of interior wind pipe and outer wind pipe, one end of interior intake stack and external air inlet pipeline is connected by hot blast connecting pipe, the other end of interior intake stack is connected with interior wind pipe by blower fan, the other end of external air inlet pipeline is connected with outer wind pipe by blower fan, on interior intake stack and external air inlet pipeline, correspondence is provided with interior circulated air pipeline and outer circulation wind pipeline, on interior wind pipe and outer wind pipe, be equipped with branch pipe(tube) and air-out lower branch line road in air-out.
Further, also comprise the waste heat wind total pipeline being communicated with hot blast connecting pipe, on this waste heat wind total pipeline, be connected with a plurality of waste heat wind branch pipe(tube)s.
Further, described air intake total pipeline and air-out total pipeline are socketed to form mutually by some conical pipeline parts.
Further, the mistake circularity of described conical pipeline part is ± 0.5mm~1.0mm.
This structure makes the connection between conical pipeline part more closely sealed, reduces from the outside dispersed heat in gap between conical pipeline part.
Further, kiln inside is divided into dryer section, preheating section, furnace zone, soaking zone and cooling section successively, air intake total pipeline, blower fan, air-out total pipeline and waste heat wind total pipeline are installed in kiln top, waste heat wind branch pipe(tube) is connected with cooling section, interior circulated air pipeline and outer circulation wind pipeline are connected with preheating section, and in air-out, branch pipe(tube) and air-out lower branch line road are connected with dryer section.
Compared with prior art, the beneficial effects of the utility model are: solved dry gas stream lamination, can make lower floor in adobe be dried completely, can make full use of the heat energy of baking bricks and dry wet brick above, heat energy performed to ultimate attainment, reached environmental protection, energy-conservation, the good result that reduces discharging.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of conical pipeline part;
Fig. 3 is the structural representation of interior circulated air pipeline and outer circulation wind pipeline;
Fig. 4 is the structural representation of branch pipe(tube) in air-out;
Fig. 5 is the structural representation in air-out lower branch line road;
Fig. 6 is the structural representation of waste heat wind branch pipe(tube).
The specific embodiment
Below in conjunction with specific embodiments and the drawings, the utility model is further described.
As shown in Figures 1 to 6, a kind of rotation steel kiln pipeline member wind circulating system, comprise the blower fan 1 being arranged on kiln, the air inlet of blower fan 1 connects air intake total pipeline, air outlet connects air-out total pipeline, air intake total pipeline is comprised of interior intake stack 2 and external air inlet pipeline 3, air-out total pipeline is comprised of interior wind pipe 4 and outer wind pipe 5, one end of interior intake stack 2 and external air inlet pipeline 3 is connected by hot blast connecting pipe 6, the other end of interior intake stack 2 is connected with interior wind pipe 4 by blower fan 1, the other end of external air inlet pipeline 3 is connected with outer wind pipe 5 by blower fan 1, on interior intake stack 2 and external air inlet pipeline 3, correspondence is provided with interior circulated air pipeline 7 and outer circulation wind pipeline 8, on interior wind pipe 4 and outer wind pipe 5, be equipped with branch pipe(tube) 9 and air-out lower branch line road 10 in air-out.
Also comprise the waste heat wind total pipeline 11 being communicated with hot blast connecting pipe 6, on this waste heat wind total pipeline 11, be connected with a plurality of waste heat wind branch pipe(tube)s 12.
Described air intake total pipeline and air-out total pipeline are socketed to form mutually by some conical pipeline parts 13.
The mistake circularity of described conical pipeline part 13 is ± 0.5mm~1.0mm.
Described kiln inside is divided into dryer section, preheating section, furnace zone, soaking zone and cooling section successively, air intake total pipeline, blower fan, air-out total pipeline and waste heat wind total pipeline 11 are installed in kiln top, waste heat wind branch pipe(tube) 12 is connected with cooling section, interior circulated air pipeline 7 and outer circulation wind pipeline 8 are connected with preheating section, and in air-out, branch pipe(tube) 9 and air-out lower branch line road 10 are connected with dryer section.
According to the length of the length of kiln and radian design conical pipeline part 13, conical pipeline part 13 and the profile of rotary kiln are fitted, avoid the number of conical pipeline part 13 too much, cause the lap of conical pipeline part 13 of junction too much, and waste material and increase the risk that heat leaks.
In use, kiln moves on Crossed Circle track, and wind circulating system also moves thereupon.Start blower fan, the heat that waste heat wind branch pipe(tube) 12 sheds kiln cooling section is derived, by branch pipe(tube) 9 and air-out lower branch line road 10 in waste heat wind total pipeline 11, interior circulated air pipeline 7, outer circulation wind pipeline 8, air-out, be delivered to dryer section and the preheating section of kiln, blow to kiln body bottom, the heat of utilizing hot brick to shed is carried out the wet brick of bake drying section, preheating section, move in circles, can overcome dry gas stream lamination like this, make in adobe lower floor's bone dry and heat energy is fully used, reduce energy loss, reach the effect of energy-saving and emission-reduction.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.

Claims (5)

1. one kind is rotated steel kiln pipeline member wind circulating system, comprise the blower fan being arranged on kiln, the air inlet of blower fan connects air intake total pipeline, air outlet connects air-out total pipeline, it is characterized in that: air intake total pipeline is comprised of interior intake stack and external air inlet pipeline, air-out total pipeline is comprised of interior wind pipe and outer wind pipe, one end of interior intake stack and external air inlet pipeline is connected by hot blast connecting pipe, the other end of interior intake stack is connected with interior wind pipe by blower fan, the other end of external air inlet pipeline is connected with outer wind pipe by blower fan, on interior intake stack and external air inlet pipeline, correspondence is provided with interior circulated air pipeline and outer circulation wind pipeline, on interior wind pipe and outer wind pipe, be equipped with branch pipe(tube) and air-out lower branch line road in air-out.
2. rotation steel kiln pipeline member wind circulating system according to claim 1, is characterized in that: also comprise the waste heat wind total pipeline being communicated with hot blast connecting pipe, be connected with a plurality of waste heat wind branch pipe(tube)s on this waste heat wind total pipeline.
3. rotation steel kiln pipeline member wind circulating system according to claim 2, is characterized in that: described air intake total pipeline and air-out total pipeline are socketed to form mutually by some conical pipeline parts.
4. rotation steel kiln pipeline member wind circulating system according to claim 3, is characterized in that: the mistake circularity of described conical pipeline part is ± 0.5mm~1.0mm.
5. rotation steel kiln pipeline member wind circulating system according to claim 3, it is characterized in that: kiln inside is divided into dryer section, preheating section, furnace zone, soaking zone and cooling section successively, air intake total pipeline, blower fan, air-out total pipeline and waste heat wind total pipeline are installed in kiln top, waste heat wind branch pipe(tube) is connected with cooling section, interior circulated air pipeline and outer circulation wind pipeline are connected with preheating section, and in air-out, branch pipe(tube) and air-out lower branch line road are connected with dryer section.
CN201320457015.1U 2013-07-30 2013-07-30 Rotary steel kiln pipeline piece circulation air system Expired - Fee Related CN203518560U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320457015.1U CN203518560U (en) 2013-07-30 2013-07-30 Rotary steel kiln pipeline piece circulation air system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320457015.1U CN203518560U (en) 2013-07-30 2013-07-30 Rotary steel kiln pipeline piece circulation air system

Publications (1)

Publication Number Publication Date
CN203518560U true CN203518560U (en) 2014-04-02

Family

ID=50377483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320457015.1U Expired - Fee Related CN203518560U (en) 2013-07-30 2013-07-30 Rotary steel kiln pipeline piece circulation air system

Country Status (1)

Country Link
CN (1) CN203518560U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104880063A (en) * 2015-05-30 2015-09-02 四川省品信机械有限公司 Novel environmental-friendly steel-frame structure straight-type tunnel kiln

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104880063A (en) * 2015-05-30 2015-09-02 四川省品信机械有限公司 Novel environmental-friendly steel-frame structure straight-type tunnel kiln

Similar Documents

Publication Publication Date Title
CN206037698U (en) New construction swivelling movement formula kiln
CN104180628B (en) A kind of energy-efficient veneer drying unit
CN205209223U (en) Continuous automatic production foamed ceramics energy saving and emission reduction tunnel cave
CN206695531U (en) A kind of drying system for gypsum production line
CN204115399U (en) A kind of associating dehumidifying drying equipment
CN203518560U (en) Rotary steel kiln pipeline piece circulation air system
CN207128157U (en) A kind of adjustable rubber gloves drying unit of temperature
CN206056170U (en) A kind of Solomonseal Rhizome dehydrator
CN203639698U (en) Drying room for setting machine
CN202938612U (en) Totally-enclosed-type heat energy circulation drying system
CN206847325U (en) A kind of intensive environmental protection revolution S type fertilizer production devices
CN206670297U (en) A kind of continuous feed formula automatic tea dryer
CN206207923U (en) A kind of dead meal fast-drying device
CN105277001B (en) A kind of production method of refractory material
CN204513954U (en) A kind of electrophoresis drying oven structure
CN206778986U (en) A kind of moulding surface disposal facility
CN206273812U (en) A kind of kiln structure of upright active lime calcining furnace
CN205980754U (en) Heated air circulation baker of valve body
CN206131711U (en) Utilize adobe, greenwave drying device of kiln waste gas
CN108361691B (en) A kind of biomass energy dust-firing equipment
CN209672739U (en) A kind of drying unit of high-strength fireproof moulded pottery not yet put in a kiln to bake
CN204490759U (en) Energy-conserving and environment-protective S type fertiliser production device
CN104534855A (en) Inner and outer circulation drying device
CN205102561U (en) Tea seed drying -machine
CN203432255U (en) Double-heat-source vertical drying machine and drying system adopting same

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: YAN JIANG

Effective date: 20140717

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140717

Address after: 635200 Quxian County Industrial Park, Sichuan, Dazhou

Patentee after: Sichuan Pinxin Machinery Co., Ltd.

Address before: 635200 Quxian County Industrial Park, Sichuan, Dazhou

Patentee before: Sichuan Pinxin Machinery Co., Ltd.

Patentee before: Yan Jiang

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

Termination date: 20150730

EXPY Termination of patent right or utility model