CN203518225U - Large-air-volume coal-to-gas boiler - Google Patents
Large-air-volume coal-to-gas boiler Download PDFInfo
- Publication number
- CN203518225U CN203518225U CN201320639739.8U CN201320639739U CN203518225U CN 203518225 U CN203518225 U CN 203518225U CN 201320639739 U CN201320639739 U CN 201320639739U CN 203518225 U CN203518225 U CN 203518225U
- Authority
- CN
- China
- Prior art keywords
- gas
- combustion chamber
- coal
- air
- heater
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003245 coal Substances 0.000 claims abstract description 35
- 239000002184 metal Substances 0.000 claims abstract description 22
- 238000002485 combustion reaction Methods 0.000 claims abstract description 20
- 238000010438 heat treatment Methods 0.000 claims abstract description 12
- 239000000428 dust Substances 0.000 claims abstract description 5
- 239000007789 gas Substances 0.000 claims description 41
- 239000003795 chemical substances by application Substances 0.000 claims description 9
- 239000000567 combustion gas Substances 0.000 claims description 7
- 239000004575 stone Substances 0.000 claims description 7
- 238000004140 cleaning Methods 0.000 claims description 6
- 230000007613 environmental effect Effects 0.000 abstract description 5
- 230000001105 regulatory effect Effects 0.000 abstract 2
- 238000004519 manufacturing process Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 3
- 239000003034 coal gas Substances 0.000 description 2
- UCKMPCXJQFINFW-UHFFFAOYSA-N Sulphide Chemical compound [S-2] UCKMPCXJQFINFW-UHFFFAOYSA-N 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
Images
Landscapes
- Solid-Fuel Combustion (AREA)
Abstract
The utility model relates to a large-air-volume coal-to-gas boiler. The large-air-volume coal-to-gas boiler is provided with a barrel-shaped boiler body, wherein a dust storage box for collecting duct is arranged at the bottom of the boiler body, a primary combustion chamber, a secondary combustion chamber and a heating medium chamber are arranged in the boiler body from bottom to top, the side of the primary combustion chamber is provided with a coal inlet and an ignition port, and a gas furnace plate is fixed inside the secondary combustion chamber. The upper portion of the secondary combustion chamber is communicated with the lower portions of multiple metal pipes, the upper portions of the metal pipes are sequentially connected with a gas purifying device and a chimney, the side of the boiler body is provided with a pressure meter and a temperature digital display meter, the side of the lower portion of the boiler body is communicated with two air blowers, regulating valves for regulating air volume are arranged on air supply pipes of the air blowers, and the upper portion of the boiler body is provided with a gas output port. The large-air-volume coal-to-gas boiler is simple and convenient to operate and safe in use, and the gas yield in unit time is high. In addition, gas discharged into the atmosphere can be filtered and purified, environmental protection is facilitated, and a good opportunity is provided for development of coal-to-gas boilers for civil use.
Description
Technical field
the utility model relates to a kind of coal and becomes gas boiler, especially uses the Wind Volume coal that safety, hygienic environment-protecting and unit interval gas production are many to become gas boiler.
Background technology
china be a rich coal resources country.The reserves row third place in the world of coal, the output of coal is the first in the world, as developing country, within foreseeable period, Chinese development be take coal and is that main energy general layout can not change, therefore, how abundant coal is cheaply realized to the utilization of Environmental Safety, become the key subjects of China's economic construction.
at present, knownly take the civil boiler that coal is fuel and not only burn insufficient, cost is high, and in the unit interval, gas production is few, cannot meet the demand of simultaneously using compared with multi-user, in addition, existing coal becomes gas boiler easily to airborne release dust and sulfide gas, contaminated environment, is unfavorable for environmental protection, has directly restricted the development of civil boiler and has promoted the use of.
Utility model content
in order to solve existing coal, become the few problem of gas production in insufficient and unit interval of gas boiler burning, the utility model provides a kind of Wind Volume coal to become gas boiler, it is not only easy and simple to handle that this Wind Volume coal becomes gas boiler, use safety, in unit interval, gas production is many, and can the gas being discharged in atmosphere be filtered and be purified, being beneficial to environmental protection, the development that becomes gas boiler for civil coal provides excellent opportunity.
the utility model solves the technical scheme that its technical problem adopts: this Wind Volume coal becomes the body of heater that gas boiler is provided with a cartridge type, the bottom of body of heater is provided with the dust-collecting box of collecting dust, in body of heater, be provided with from the bottom up primary zone, secondary combustion chamber and heating agent chamber, primary zone, secondary combustion chamber and heating agent chamber are separated by the metallic plate of good heat conductivity, metallic plate central authorities between primary zone and secondary combustion chamber are provided with passage, the side of primary zone is provided with coal feed point and lighting-up tuyere, the indoor 1-3 of being fixed with of second-time burning the combustion gas stone or metal plate for standing a stove on as a precaution against fire being arranged in parallel up and down, the top of secondary combustion chamber is connected with many bottoms with metal tube, metal tube top is connected with gas cleaning plant and chimney successively, the side of body of heater is provided with pressure and takes into account temperature digital display meter, can monitor at any time and show the pressure and temperature of gas in body of heater, the side, below of body of heater is connected with two air blasts, thereby meet Wind Volume requirement, the ajutage of air blast is provided with the control valve that regulates air output, the top of body of heater is provided with gas delivery port.While using boiler, coal is sent into primary zone from coal feed point, and by lighting-up tuyere, coal is lighted, the coal of burning can produce coal gas, rises to combustion gas stone or metal plate for standing a stove on as a precaution against fire, at the gas furnace fire of making an inventory, this fire is the heating of metal tube and metallic plate, from the cool breeze that blows into two air blasts in heating agent chamber after scorching hot metallic plate and metal tube heat up, from gas delivery port, export, the gas producing during gas-fired enters gas cleaning plant by the tube chamber of metal tube, then by chimney, discharges boiler.
the beneficial effects of the utility model are that it is not only easy and simple to handle that this Wind Volume coal becomes gas boiler, uses safety, in unit interval, gas production is many, and can the gas being discharged in atmosphere be filtered and be purified, being beneficial to environmental protection, the development that becomes gas boiler for civil coal provides excellent opportunity.
Accompanying drawing explanation
below in conjunction with drawings and Examples, the utility model is described in further detail.
fig. 1 is structural principle schematic diagram of the present utility model.
in Fig. 1,1. heating agent chamber, 2. metal tube, 3. secondary combustion chamber, 4. combustion gas stone or metal plate for standing a stove on as a precaution against fire, 5. coal feed point, 6. lighting-up tuyere, 7. primary zone, 8. dust-collecting box, 9. control valve, 10. air blast, 11. pressure gauges, 12. temperature digital display meters, 13. bodies of heater, 14. gas delivery ports, 15. chimneys, 16. gas cleaning plants.
The specific embodiment
in Fig. 1, this Wind Volume coal becomes the body of heater 13 that gas boiler is provided with a cartridge type, the bottom of body of heater 13 is provided with the dust-collecting box 8 of collecting dust, in body of heater 13, be provided with from the bottom up primary zone 7, secondary combustion chamber 3 and heating agent chamber 1, primary zone 7, secondary combustion chamber 3 and heating agent chamber 1 are separated by the metallic plate of good heat conductivity, metallic plate central authorities between primary zone 7 and secondary combustion chamber 3 are provided with passage, the side of primary zone 7 is provided with coal feed point 5 and lighting-up tuyere 6, in secondary combustion chamber 3, be fixed with 1-3 the combustion gas stone or metal plate for standing a stove on as a precaution against fire 4 being arranged in parallel up and down, the top of secondary combustion chamber 3 is connected with many bottoms with metal tube 2, metal tube 2 tops are connected with gas cleaning plant 16 and chimney 15 successively, the side of body of heater 13 is provided with pressure gauge 11 and temperature digital display meter 12, can monitor at any time and show the pressure and temperature of body of heater 13 interior gases, the side, below of body of heater 13 is connected with two air blasts 10, thereby meet Wind Volume requirement, the ajutage of air blast 10 is provided with the control valve 9 that regulates air output, the top of body of heater 13 is provided with gas delivery port 14.While using boiler, coal is sent into primary zone 7 from coal feed point 5, and by lighting-up tuyere 6, coal is lighted, the coal of burning can produce coal gas, rise to combustion gas stone or metal plate for standing a stove on as a precaution against fire 4, in 4 igniting of combustion gas stone or metal plate for standing a stove on as a precaution against fire, this fire is by metal tube 2 and metallic plate heating, from the cool breeze that blows into two air blasts 10 in heating agent chamber 1 after scorching hot metallic plate and metal tube 2 heat up, from gas delivery port 14 outputs, the gas producing during gas-fired enters gas cleaning plant 16 by the tube chamber of metal tube 2, then by chimney 15, discharges boiler.
Claims (3)
1.
wind Volume coal becomes gas boiler, this Wind Volume coal becomes the body of heater (13) that gas boiler is provided with a cartridge type, it is characterized in that, the bottom of body of heater (13) is provided with the dust-collecting box (8) of collecting dust, in body of heater (13), be provided with from the bottom up primary zone (7), secondary combustion chamber (3) and heating agent chamber (1), primary zone (7), secondary combustion chamber (3) and heating agent chamber (1) are separated by the metallic plate of good heat conductivity, metallic plate central authorities between primary zone (7) and secondary combustion chamber (3) are provided with passage, the top of secondary combustion chamber (3) is connected with the bottom of many metal tubes (2), metal tube (2) top is connected with gas cleaning plant (16) and chimney (15) successively, the side of body of heater (13) is provided with pressure gauge (11) and temperature digital display meter (12), the side, below of body of heater (13) is connected with two air blasts (10), the ajutage of air blast (10) is provided with the control valve (9) that regulates air output, the top of body of heater (13) is provided with gas delivery port (14).
2.
wind Volume coal according to claim 1 becomes gas boiler, it is characterized in that, the side of described primary zone (7) is provided with coal feed point (5) and lighting-up tuyere (6).
3.
wind Volume coal according to claim 1 becomes gas boiler, it is characterized in that, is fixed with 1-3 the combustion gas stone or metal plate for standing a stove on as a precaution against fire (4) being arranged in parallel up and down in described secondary combustion chamber (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320639739.8U CN203518225U (en) | 2013-10-17 | 2013-10-17 | Large-air-volume coal-to-gas boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320639739.8U CN203518225U (en) | 2013-10-17 | 2013-10-17 | Large-air-volume coal-to-gas boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203518225U true CN203518225U (en) | 2014-04-02 |
Family
ID=50377151
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320639739.8U Expired - Fee Related CN203518225U (en) | 2013-10-17 | 2013-10-17 | Large-air-volume coal-to-gas boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203518225U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107270531A (en) * | 2017-08-08 | 2017-10-20 | 赵治荣 | Environment-protection boiler and heating equipment |
CN108180626A (en) * | 2017-12-21 | 2018-06-19 | 陈方羽 | A kind of power economized boiler based on second-time burning preheating technology |
-
2013
- 2013-10-17 CN CN201320639739.8U patent/CN203518225U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107270531A (en) * | 2017-08-08 | 2017-10-20 | 赵治荣 | Environment-protection boiler and heating equipment |
CN107270531B (en) * | 2017-08-08 | 2023-08-22 | 赵治荣 | Environment-friendly boiler and heating equipment |
CN108180626A (en) * | 2017-12-21 | 2018-06-19 | 陈方羽 | A kind of power economized boiler based on second-time burning preheating technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205090598U (en) | Coal -fired powder boiler of vertical extreme misery tubular construction | |
CN103644562A (en) | Combined type energy-saving biomass fuel boiler | |
CN204630034U (en) | Coiled hot water, steam boiler | |
CN203518225U (en) | Large-air-volume coal-to-gas boiler | |
CN204665226U (en) | A kind of steam generator | |
CN201926118U (en) | Heat transfer oil furnace and vortex combustor biomass all-in-one machine | |
CN203336816U (en) | Large horizontal type boiler for recycling smoke waste heat | |
CN203550187U (en) | Normal-pressure biomass rolling furnace bar hot-water boiler | |
CN203203013U (en) | Biomass steam generator | |
CN202562026U (en) | Coal-fired and gas-fired dual-purpose vertical hot-blast stove | |
CN202322935U (en) | Economical inclined bottom heating furnace | |
CN202074684U (en) | Water heating furnace | |
CN104329802A (en) | Condensing boiler | |
CN204165228U (en) | Normal-pressure hot-water boiler | |
CN203907605U (en) | Self-preheating burner | |
CN201926108U (en) | Biomass vertical heat-conducting oil furnace | |
CN203177444U (en) | Numerical control boiler | |
CN207648798U (en) | The full premix heating stove of cast aluminium formula heat exchange | |
CN203776011U (en) | Multi-burner combustion and heating system for frying equipment | |
CN203571694U (en) | Steam boiler | |
CN216481621U (en) | Wall-mounted furnace heat exchange system with condensation function | |
CN202470430U (en) | Economizer for coal burning boiler | |
CN102032672B (en) | Biomass integrated machine consisting of heat conducing oil furnace and cyclone burner | |
CN103234265A (en) | Biomass fuel environment-friendly energy-saving boiler and waste heat recovery method | |
CN102589129A (en) | Energy saver of coal-fired boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140402 Termination date: 20141017 |
|
EXPY | Termination of patent right or utility model |