CN203501740U - Water-cooled furnace cover of alternating-current arc furnace - Google Patents

Water-cooled furnace cover of alternating-current arc furnace Download PDF

Info

Publication number
CN203501740U
CN203501740U CN201320356976.3U CN201320356976U CN203501740U CN 203501740 U CN203501740 U CN 203501740U CN 201320356976 U CN201320356976 U CN 201320356976U CN 203501740 U CN203501740 U CN 203501740U
Authority
CN
China
Prior art keywords
furnace cover
water
bell
furnace
cooled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320356976.3U
Other languages
Chinese (zh)
Inventor
白广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuyang Iron and Steel Co Ltd
Hebei Iron and Steel Group Co Ltd
Original Assignee
Wuyang Iron and Steel Co Ltd
Hebei Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuyang Iron and Steel Co Ltd, Hebei Iron and Steel Group Co Ltd filed Critical Wuyang Iron and Steel Co Ltd
Priority to CN201320356976.3U priority Critical patent/CN203501740U/en
Application granted granted Critical
Publication of CN203501740U publication Critical patent/CN203501740U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model relates to a water-cooled furnace cover of an alternating-current arc furnace. The water-cooled furnace cover of the alternating-current arc furnace belongs to the technical field of alternating-current arc furnace equipment and is used for improving the service life of the water-cooled furnace cover. The technical scheme is that the water-cooled furnace cover consists of a furnace cover frame, furnace cover sector plates, furnace cover piping, a small furnace cover ring and a dust remove flue, the circumference height of the furnace cover frame is 800-1500mm, the number of the furnace cover sector plates is four and eighteen water inlet/return paths are arranged on the furnace cover sector plates. The water-cooled furnace cover of the alternating-current arc furnace has the advantages that since the overall height of the furnace cover is increased, the space between the furnace cover and waste steel is increased, the possibility of sparking between arc and the water-cooled furnace cover during smelting is reduced and the service life of the water-cooled furnace cover is prolonged; since four furnace cover sector plates and eighteen water inlet/return paths are adopted, the water path distribution is enabled to be more reasonable and balanced, the dead water area on the furnace cover frame is eliminated, the overall cooling effect of the water-cooled furnace cover is improved and the goal of prolonging the service life of the water-cooled furnace cover is also realized; since lifting square boxes and supporting seats are added, the installation time is shortened and the labor intensity is relieved.

Description

A kind of ac arc furnace water cooled cover
Technical field
The utility model relates to the special-purpose bell of a kind of ac arc furnace water-cooled, belongs to ac arc furnace equipment technical field.
Background technology
At present, domestic ac arc furnace water cooled cover generally adopts the structural shape of two fanning strips, and the space between bell and steel scrap is less, and during smelting, electric arc and water cooled cover fanning strip exist the possibility of sparking, the service life of having reduced water cooled cover.This structure, when distributing each water route, exists certain defect relatively simultaneously, and each water route is relatively long, and the environment of regional is different, and water route is distributed balanced not, causes the water cooled cover life-span lower.Have again, each applying unit is not generally made water cooled cover, all to entrust other unit to manufacture and design, because site environment is understood very much by designing unit, when design, cannot put in place according to installation requirement one step design, cause needing when mounted contraposition at the scene, at high temperature weld, extend the set-up time, affected installation quality, also increased labour intensity.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of ac arc furnace water cooled cover, electric arc when this interchange water cooled cover effectively reduces smelting and the sparking probability of water cooled cover, improve the whole cooling effect of water cooled cover, extend water cooled cover service life, be convenient to install simultaneously.
The technical scheme solving the problems of the technologies described above is:
A kind of ac arc furnace water cooled cover, it is comprised of bell framework, bell fanning strip, bell pipe arrangement, port decorative cover, dust-removing flue, and its improvements are that the circumference height of its bell framework is 800mm-1500mm, bell fanning strip is 4, has 18 to enter backwater road on bell fanning strip.
Above-mentioned ac arc furnace water cooled cover, on described bell framework, lifting square chest is installed, promoting square chest is 4, is separately fixed at the top of bell framework, each promotes in square chest all has one to carry dish, and each is carried dish and is connected with the chain that is connected of furnace cover lifting cylinder respectively.
Above-mentioned ac arc furnace water cooled cover, there is respectively the location-plate of level the both sides of described dust-removing flue, on location-plate, there is vertical locating hole, on bell framework, be welded with supporting seat, on supporting seat, there is fixed jack, fixed jack is corresponding with the locating hole of location-plate respectively, and locating hole is connected by the drift inserting with fixed jack.
Above-mentioned ac arc furnace water cooled cover, is connected with earthing or grounding means between described port decorative cover and bell framework.
The beneficial effects of the utility model are:
The utility model is increased by bell integral body, has increased the space of bell and steel scrap, has reduced the lighter meeting of electric arc and water cooled cover fanning strip when smelting, and has extended the service life of water cooled cover; Adopt 4 bell fanning strips and 18 to enter backwater road simultaneously, make the water route distribution of regional more reasonable, more balanced, eliminated the dead water region on bell framework, improve the whole cooling effect of water cooled cover, also reached the object that extends the service life of water cooled cover; The utility model has also increased lifting square chest, not be used in on-the-spot contraposition, is emitting high temperature to weld, thereby shortened the set-up time, also increased supporting seat simultaneously, with drift, directly dust-removing flue has been fixed on bell framework fast and accurately, also shorten the set-up time, alleviated labour intensity.
After the utility model comes into operation, extend to 6140 heats by original average 2739.125 heats service life, it is many that extend to twice service life, separate unit electric furnace can be saved more than 560,000 yuan of spare part expenses for 1 year, each bell of changing can shorten the set-up time of 4 hours, separate unit electric furnace 1 year can voluminous steel more than 2740 tons, has significant economic benefit.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the structural representation of bell framework;
Fig. 4 is the top view of Fig. 3;
Fig. 5 is the structural representation of bell fanning strip;
Fig. 6 is the structural representation of dust-removing flue;
Fig. 7 is the side view of Fig. 6;
Fig. 8 is the top view of Fig. 6.
In figure, mark is as follows: bell framework 1, bell fanning strip 2, bell pipe arrangement 3, port decorative cover 4, dust-removing flue 5, lifting square chest 6, supporting seat 7, location-plate 8, locating hole 9.
The specific embodiment
The utility model is comprised of bell framework 1, bell fanning strip 2, bell pipe arrangement 3, port decorative cover 4, dust-removing flue 5.
In figure, show, the circumference height of its bell framework is 800mm-1500mm, than original bell integral body, increases, and has increased the space of bell and steel scrap, has reduced the lighter meeting of electric arc and water cooled cover fanning strip when smelting, and has extended the service life of water cooled cover.An embodiment of the present utility model has increased 150mm than original bell integral body, and this is because the restriction of furnace space can only be increased 150mm.
In figure, show, bell fanning strip 2 is 4, has 18 to enter backwater road on bell fanning strip 2.Intrinsic bell fanning strip is two, is 14 and enters backwater road on former bell fanning strip.It is more reasonable that the water route of the regional of the bell fanning strip 2 after improvement is distributed, more balanced, and eliminated the dead water region on bell framework 1, improve the whole cooling effect of water cooled cover, extended the service life of water cooled cover. on the bell fanning strip 2 of an embodiment of the present utility model, there are 18 to enter backwater road.
In figure, show, the utility model has increased lifting square chest 6, promotes square chest 6 and is arranged on bell framework 1.Promoting square chest 6 is 4, is separately fixed at the top of bell framework 1, promotes in square chest 6 and carries dish, carries dish and is connected with the chain that is connected of 4 furnace cover lifting cylinders respectively.A in figure, B, C, D are 4 and promote square chest 6, can make water cooled cover directly install, and not be used in on-the-spot contraposition, are emitting high temperature to weld, and can shorten the set-up time of more than two hour.
In figure, show, the utility model has also increased supporting seat 7, and supporting seat 7 is welded on bell framework 1.There is respectively the location-plate 8 of level the both sides of dust-removing flue 5, have vertical locating hole 9 on location-plate 8, on supporting seat 7, have fixed jack, and fixed jack is corresponding with the locating hole 9 of location-plate 8 respectively, and locating hole 9 is connected by the drift inserting with fixed jack.During installation, with drift, directly fast and accurately dust-removing flue 5 is fixed on bell framework 1, can shortens the set-up time of more than one hour.
Between port decorative cover 4 of the present utility model and bell framework 1, be connected with earthing or grounding means.
Use procedure of the present utility model is as follows:
Assembled complete water cooled cover general assembly is carried out to water route confirmation, and water flowing pressure testing checks.
After water cooled cover is winched to upper furnace shell top, by coordinate, fall, cycle factory type frame, coils by carrying in four lifting square chests the chain being connected with four furnace cover lifting cylinders and interconnects; Lift water cooled cover, adjust four and promote the fulcrum gap that square chest top boards are mutual corresponding with factory type frame, guarantee that water cooled cover does not produce and rocks when rotated, raising height meets designing requirement.
According to supporting seat, adjust dust-removing flue, by the direct fixing dust-removing flue of four drifts, and reinforce good each drift, guarantee can not become flexible.
Adjust port decorative cover, make three electrode holes and three-phase electrode placed in the middle.For preventing sparking, connecting earthing device between port decorative cover and bell framework.
What connect water cooled cover and dust-removing flue enters backwater flexible pipe, and water flowing inspection guarantees that each portion is without infiltration phenomenon, and discharge, hydraulic pressure meet design requirement.

Claims (4)

1. an ac arc furnace water cooled cover, it is comprised of bell framework (1), bell fanning strip (2), bell pipe arrangement (3), port decorative cover (4), dust-removing flue (5), it is characterized in that: the circumference height of its bell framework (1) is 800mm-1500mm, bell fanning strip (2) is 4, on bell fanning strip (2), has 18 to enter backwater road.
2. ac arc furnace water cooled cover according to claim 1, it is characterized in that: on described bell framework (1), be provided with and promote square chest (6), promoting square chest (6) is 4, be separately fixed at the top of bell framework (1), promote in square chest (6) and carry dish, carry dish and be connected with the chain that is connected of 4 furnace cover lifting cylinders respectively.
3. ac arc furnace water cooled cover according to claim 2, it is characterized in that: there is respectively the location-plate (8) of level the both sides of described dust-removing flue (5), on location-plate (8), there is vertical locating hole (9), on bell framework (1), be welded with supporting seat (7), supporting seat has fixed jack on (7), fixed jack is corresponding with the locating hole (9) of location-plate (8) respectively, and locating hole (9) is connected by the drift inserting with fixed jack.
4. ac arc furnace water cooled cover according to claim 3, is characterized in that: between described port decorative cover (4) and bell framework (1), be connected with earthing or grounding means.
CN201320356976.3U 2013-06-21 2013-06-21 Water-cooled furnace cover of alternating-current arc furnace Expired - Fee Related CN203501740U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320356976.3U CN203501740U (en) 2013-06-21 2013-06-21 Water-cooled furnace cover of alternating-current arc furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320356976.3U CN203501740U (en) 2013-06-21 2013-06-21 Water-cooled furnace cover of alternating-current arc furnace

Publications (1)

Publication Number Publication Date
CN203501740U true CN203501740U (en) 2014-03-26

Family

ID=50332716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320356976.3U Expired - Fee Related CN203501740U (en) 2013-06-21 2013-06-21 Water-cooled furnace cover of alternating-current arc furnace

Country Status (1)

Country Link
CN (1) CN203501740U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108088237A (en) * 2017-11-27 2018-05-29 云南冶金新立钛业有限公司 For the furnace roof centerpiece component for the direct-current airtight electric arc furnace that titanium slag is smelted

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108088237A (en) * 2017-11-27 2018-05-29 云南冶金新立钛业有限公司 For the furnace roof centerpiece component for the direct-current airtight electric arc furnace that titanium slag is smelted

Similar Documents

Publication Publication Date Title
CN211253787U (en) Container for gas cylinder packaging
CN203501740U (en) Water-cooled furnace cover of alternating-current arc furnace
CN201340195Y (en) Dismountable pipe-type water-cooled furnace cover for submerged arc furnace
CN104612908A (en) Wind power generation tower cylinder platform and wind power generation tower cylinder
CN201764854U (en) Coil pipe structure
CN201517892U (en) Quick combined grid plate device of grate cooler
CN202018869U (en) Interface transformer arrangement structure for flexible direct current converter station
CN204417544U (en) A kind of high durable leg integral type annealing furnace rack
CN207963487U (en) Breast board on a kind of novel sinter trolley
CN204874566U (en) Device is changed to blast furnace hot -blast valve
CN202544436U (en) Steam turbine room bottom layer arrangement structure of steam-driven feed water pump of thermal power plant
CN204397177U (en) A kind of electrolytic cell body founds the welding equipment to weld seam
CN216445436U (en) Roller way bearing pedestal
CN206136501U (en) Portable iron tower basic station is with combination rack
CN204905318U (en) Battery fixed bolster
CN207483869U (en) A kind of aluminium cell portal upright post support construction
CN205241717U (en) Novel blast furnace stove top frame structure
CN107062922B (en) Main exhauster of sintering frequency conversion tank disassembles and installs method
CN202501793U (en) Anti-freezing wind shield of power cooling tower
CN203649317U (en) Water-cooling vertical type lead anode casting mould plate
CN203878158U (en) Bell-less top support frame convenient to overhaul
CN207674960U (en) A kind of avoid-dismantle furnace lid rotating beam
CN202924607U (en) Trolley conductor installation assembly
CN202721853U (en) Arc furnace current collection semi-ring and conductive apparatus formed thereby
CN201956598U (en) Combined bottom plate of transformer case

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140326

Termination date: 20190621