CN203488986U - Industrial combustion gas engineering pipeline system for clothes factory - Google Patents

Industrial combustion gas engineering pipeline system for clothes factory Download PDF

Info

Publication number
CN203488986U
CN203488986U CN201320499876.6U CN201320499876U CN203488986U CN 203488986 U CN203488986 U CN 203488986U CN 201320499876 U CN201320499876 U CN 201320499876U CN 203488986 U CN203488986 U CN 203488986U
Authority
CN
China
Prior art keywords
ball valve
main pipeline
pipeline
pipeline system
combustion gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320499876.6U
Other languages
Chinese (zh)
Inventor
仲剑明
宋松林
周旭波
王明明
白守江
祁世申
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINMI TOWNGAS Co Ltd
Original Assignee
XINMI TOWNGAS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINMI TOWNGAS Co Ltd filed Critical XINMI TOWNGAS Co Ltd
Priority to CN201320499876.6U priority Critical patent/CN203488986U/en
Application granted granted Critical
Publication of CN203488986U publication Critical patent/CN203488986U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Feeding And Controlling Fuel (AREA)

Abstract

The utility model discloses an industrial combustion gas engineering pipeline system for a clothes factory. The pipeline system comprises a main pipeline. A gas inlet end of the main pipeline is provided with a main valve; a gas outlet end of the main pipeline is provided with a flange ball valve; a branch pipeline is connected to the main pipeline via a tee joint pipe; an outlet of the branch pipeline is provided with an end cap; the main pipeline is provided with a pressure adjusting metering device between the tee joint pipe and the flange ball valve; and the pressure adjusting metering device is mounted on a bearer. The industrial combustion gas engineering pipeline system for clothes factory is rationally designed with simple structure; the pipeline system especially supplies gas for boilers and dining halls of the clothes factory in a safe and reliable way; the usage of the pipeline system is convenient; and the pipeline system is energy-saving and environment friendly as well as much practical, thereby being suitable for promotion and application.

Description

Dress ornament station-service industrial combustion gas engineering pipeline system
Technical field
The utility model belongs to industrial combustion gas Construction Technology field, relates in particular to a kind of dress ornament station-service industrial combustion gas engineering pipeline system.
Background technique
At present, the many industrial enterprise especially dining room, boiler etc. of dress ornament factory are still used coal as fuel, coal when burning, have heat yield low, burn insufficient, pollute larger defect.Rock gas has the advantages such as sufficient combustion, heating value are high, environmental protection, and along with the reinforcement gradually of people's quality of the life and environmental consciousness, rock gas is universal coming at leisure, therefore, for dress ornament factory, also needs badly and carry out technological improvement.
Model utility content
The utility model, in order to solve deficiency of the prior art, provides a kind of dress ornament station-service industrial combustion gas engineering pipeline system.
For solving the problems of the technologies described above, the utility model adopts following technological scheme: dress ornament station-service industrial combustion gas engineering pipeline system, comprise main pipeline, the inlet end of described main pipeline is provided with main valve, the outlet side of main pipeline is provided with Flange Ball Valves, on main pipeline, by three-way pipe, is connected with branch pipe(tube), and the air outlet of branch pipe(tube) is provided with end cap, on main pipeline, between three-way pipe and Flange Ball Valves, be provided with pressure regulating metering device, described pressure regulating metering device is located on bearing.
Described pressure regulating metering device comprises voltage regulation batch meter, in voltage regulation batch meter, be provided with the pressure regulation metering supervisor who is connected with main pipeline, pressure regulation metering supervisor is upper to be provided with successively from front to back and in the first manual ball valve, filter, flowmeter, IC-card control valve, first, to press pressure governor and the second manual ball valve along airflow direction.
On described pressure regulation metering supervisor, be connected with and be positioned at the first manual ball valve front arm before, on front arm, along airflow direction, be provided with the 3rd manual ball valve and pressure meter.
On described pressure regulation metering supervisor, be connected with and be positioned at the second manual ball valve rear arm afterwards, rear arm is provided with and manually diffuses ball valve.
On described pressure regulation metering supervisor, be connected with standby pipes, one end of standby pipes is connected in IC-card control valve and first and presses between pressure governor, the other end of standby pipes is connected to the outlet end place of the second manual ball valve, in standby pipes, along airflow direction, is provided with successively and in second, presses pressure governor, the 4th manual ball valve and Safety relief valve.
Adopt technique scheme, main pipeline buries interior underground, the Flange Ball Valves of the outlet side of main pipeline is for the boiler air feed to dress ornament factory, branch pipe(tube) air outlet is to dining room air feed, because boiler requires Security higher, therefore on main pipeline, configure pressure regulating metering device, pressure regulation metering supervisor and standby pipes are set in pressure regulating metering device, under normal operation, standby pipes is not worked, if press pressure governor to break down in first on main pipeline, just closes the second manual ball valve, open the 3rd manual ball valve, use standby pipes to carry out pressure regulation metering.
The utility model is reasonable in design, simple in structure, for air feed is carried out in the boiler of dress ornament factory and dining room, safe and reliable, easy to use specially, and energy-conserving and environment-protective are practical, are easy to apply.
Accompanying drawing explanation
Fig. 1 is situation plan of the present utility model;
Fig. 2 is the pipeline structure schematic diagram in voltage regulation batch meter in Fig. 1.
Embodiment
As depicted in figs. 1 and 2, dress ornament station-service industrial combustion gas engineering pipeline system of the present utility model, comprise main pipeline 1, the inlet end of described main pipeline 1 is provided with the main valve 2 for the whole main pipeline air-flow of switch, the outlet side of main pipeline 1 is provided with Flange Ball Valves 3, on main pipeline 1, by three-way pipe 4, is connected with branch pipe(tube) 5, and the air outlet of branch pipe(tube) 5 is provided with end cap 6, on main pipeline 1, between three-way pipe 4 and Flange Ball Valves 3, be provided with pressure regulating metering device, described pressure regulating metering device is located on bearing 7.
Pressure regulating metering device comprises voltage regulation batch meter 8, in voltage regulation batch meter 8, be provided with the pressure regulation metering supervisor 9 who is connected with main pipeline 1, on pressure regulation metering supervisor 9, along airflow direction, be provided with successively from front to back in the first manual ball valve 10, filter 11, flowmeter 12, IC-card control valve 13, first and press pressure governor 14 and the second manual ball valve 15.
On pressure regulation metering supervisor 9, be connected with and be positioned at the first manual ball valve 10 front arm 16 before, on front arm 16, along airflow direction, be provided with the 3rd manual ball valve 17 and pressure meter 18.
On pressure regulation metering supervisor 9, be connected with and be positioned at the second manual ball valve 15 rear arm 19 afterwards, rear arm 19 is provided with and manually diffuses ball valve 20.
On pressure regulation metering supervisor 9, be connected with standby pipes 21, one end of standby pipes 21 is connected in IC-card control valve 13 and first and presses between pressure governor 14, the other end of standby pipes 21 is connected to the outlet end place of the second manual ball valve 15, in standby pipes 21, along airflow direction, is provided with successively and in second, presses pressure governor 22, the 4th manual ball valve 23 and Safety relief valve 24.
When the utility model is used in work, main pipeline 1 buries interior underground, the Flange Ball Valves 3 of the outlet side of main pipeline 1 is for boiler 25 air feed to dress ornament factory, branch pipe(tube) 5 air outlets are 26 air feed to dining room, because boiler requires Security higher, therefore on main pipeline 1, configure pressure regulating metering device, pressure regulation metering supervisor 9 and standby pipes 21 are set in pressure regulating metering device, under normal operation, standby pipes 21 is not worked, if press pressure governor 14 to break down in first on main pipeline 1, just close the second manual ball valve 15, open the 3rd manual ball valve 17, use standby pipes 21 to carry out pressure regulation metering.In Fig. 2 arrow points be natural gas flow to.

Claims (5)

1. dress ornament station-service industrial combustion gas engineering pipeline system, comprise main pipeline, it is characterized in that: the inlet end of described main pipeline is provided with main valve, the outlet side of main pipeline is provided with Flange Ball Valves, on main pipeline, by three-way pipe, be connected with branch pipe(tube), the air outlet of branch pipe(tube) is provided with end cap, on main pipeline, between three-way pipe and Flange Ball Valves, is provided with pressure regulating metering device, and described pressure regulating metering device is located on bearing.
2. dress ornament station-service industrial combustion gas engineering pipeline system according to claim 1, it is characterized in that: described pressure regulating metering device comprises voltage regulation batch meter, in voltage regulation batch meter, be provided with the pressure regulation metering supervisor who is connected with main pipeline, pressure regulation metering supervisor is upper to be provided with successively from front to back and in the first manual ball valve, filter, flowmeter, IC-card control valve, first, to press pressure governor and the second manual ball valve along airflow direction.
3. dress ornament station-service industrial combustion gas engineering pipeline system according to claim 2, is characterized in that: on described pressure regulation metering supervisor, be connected with and be positioned at the first manual ball valve front arm before, on front arm, along airflow direction, be provided with the 3rd manual ball valve and pressure meter.
4. dress ornament station-service industrial combustion gas engineering pipeline system according to claim 2, is characterized in that: on described pressure regulation metering supervisor, be connected with and be positioned at the second manual ball valve rear arm afterwards, rear arm is provided with and manually diffuses ball valve.
5. according to the dress ornament station-service industrial combustion gas engineering pipeline system described in claim 2 or 3 or 4, it is characterized in that: on described pressure regulation metering supervisor, be connected with standby pipes, one end of standby pipes is connected in IC-card control valve and first and presses between pressure governor, the other end of standby pipes is connected to the outlet end place of the second manual ball valve, in standby pipes, along airflow direction, is provided with successively and in second, presses pressure governor, the 4th manual ball valve and Safety relief valve.
CN201320499876.6U 2013-08-16 2013-08-16 Industrial combustion gas engineering pipeline system for clothes factory Expired - Fee Related CN203488986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320499876.6U CN203488986U (en) 2013-08-16 2013-08-16 Industrial combustion gas engineering pipeline system for clothes factory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320499876.6U CN203488986U (en) 2013-08-16 2013-08-16 Industrial combustion gas engineering pipeline system for clothes factory

Publications (1)

Publication Number Publication Date
CN203488986U true CN203488986U (en) 2014-03-19

Family

ID=50259820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320499876.6U Expired - Fee Related CN203488986U (en) 2013-08-16 2013-08-16 Industrial combustion gas engineering pipeline system for clothes factory

Country Status (1)

Country Link
CN (1) CN203488986U (en)

Similar Documents

Publication Publication Date Title
CN203729381U (en) Adjustable constant-pressure experimental water supply system
CN203797351U (en) Fully-balanced gas pressure regulator system
CN203298300U (en) Natural gas pipe system of heat treatment furnace
CN203488986U (en) Industrial combustion gas engineering pipeline system for clothes factory
CN205137083U (en) A pressure regulating box for natural gas air feed
CN203488999U (en) Pressure adjusting metering device for natural gas pipeline
CN203489000U (en) Pressure adjusting metering device for combustion gas pipeline
CN203489005U (en) Industrial combustion gas engineering pipeline system for tunnel kiln
CN204240050U (en) A kind of blast furnace gas low energy consumption direct-supplying device
CN204729927U (en) Compact gas pressure-regulating box
CN203488990U (en) Industrial combustion gas engineering pipeline system for brick yard
CN203489002U (en) Installation structure of pressure adjusting metering device for combustion gas pipeline
CN202328270U (en) Mechanical fixed-proportion gas/air mixing device
CN203489004U (en) Pressure adjusting metering device for industrial combustion gas engineering pipeline system
CN204328484U (en) A kind of Gas Pressure Regulating Equipment adopting series connection monitoring
CN205782845U (en) A kind of intelligence pressure and temperature reducing energy-saving control system
CN204063638U (en) Normality is without the automatic control piping system of pressure type solar water heater
CN204665715U (en) A kind of flow cavitation result branch road
CN105650472A (en) Gas supply system for food processing plant
CN204513805U (en) Solar water heating system
CN203500762U (en) Steam distributing device
CN204164665U (en) The special bleeding device of a kind of pressure regulating cabinet
CN205173102U (en) Dual -purpose type valve island of aqueous vapor
CN203718823U (en) Gas safety protection system for gas-fired boiler
CN204283378U (en) A kind of self feed back injector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140319

Termination date: 20200816