CN203488205U - Installation arrangement of belt type transmission device in inclined drift - Google Patents

Installation arrangement of belt type transmission device in inclined drift Download PDF

Info

Publication number
CN203488205U
CN203488205U CN201320398854.0U CN201320398854U CN203488205U CN 203488205 U CN203488205 U CN 203488205U CN 201320398854 U CN201320398854 U CN 201320398854U CN 203488205 U CN203488205 U CN 203488205U
Authority
CN
China
Prior art keywords
platform
transmission device
tunnel
arrangement
gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320398854.0U
Other languages
Chinese (zh)
Inventor
彭雷祥
宋国忠
郭宝德
谭花文
薛彩霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Technology Gropu Engineering Design Co ltd
Original Assignee
Coal Industry Jinan Design & Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Coal Industry Jinan Design & Research Co Ltd filed Critical Coal Industry Jinan Design & Research Co Ltd
Priority to CN201320398854.0U priority Critical patent/CN203488205U/en
Application granted granted Critical
Publication of CN203488205U publication Critical patent/CN203488205U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

This utility model relates to an installation arrangement of the belt type transmission device in an underground coal mine, and particularly relates to an installation arrangement of a belt type transmission device in an inclined drift. The installation arrangement of the belt type transmission device in the inclined drift comprises an inclined drift connecting a coal bunker and a coal layer. The installation arrangement of the belt type transmission device in the inclined drift is characterized in that a platform A, a platform B, a platform C, and a platform D are arranged sequentially from the top to bottom on the bottom of the gallery near to the coal bunker. A first turunabout drum, a first transmission device, a second transmission device and a second turunabout drum are respectively arranged on the platform A, the platform B, the platform C and the platform D. A tensioning gear is arranged on the inclined plane of the gallery under the platform D. The first turunabout drum, the first transmission device, the second transmission device, the second turunabout drum and the tensioning device are transmitted by a transmission belt fixed on the bottom of the gallery, and the inclined drift under the gallery is connected to the coal layer through the platform E.

Description

The arrangement of a kind of ribbon conveyer in inclined shaft
(1) technical field
The utility model relates to the mounting arrangements of Belt Conveyors Underground Coal Mine, particularly the arrangement of a kind of ribbon conveyer in inclined shaft.
(2) background technology
At present, coal mine belt conveyor head chamber is generally arranged near gallery coal bunker, gallery length is generally at 40~80m, for chamber, near coal seam or bottom and the larger situation of seam inclination, belt conveyer head chamber adopts entry to be difficult to arrange development work, has restricted greatly the selection of coal mine bunker position, make coal mine down-hole for having increased roadway engineering, improve shaft building cost, caused larger waste, reduced the reasonability that development work is arranged.
(3) summary of the invention
The utility model, in order to make up the deficiencies in the prior art, provides a kind of reasonable in design, and structure is the arrangement of ribbon conveyer in inclined shaft easily.
The utility model is achieved by the following technical solution:
The arrangement of a kind of ribbon conveyer in inclined shaft, comprise the tunnel that connects coal bunker and seam inclination, it is characterized in that: the described bottom surface, tunnel near coal bunker is built and had platform A, platform B, platform C, platform D successively from top to bottom, is placed with respectively the first bend pulley, the first transmission device, the second transmission device and the second bend pulley on platform A, platform B, platform C, platform D; On the inclined plane, tunnel of described platform D downside, be provided with tensioning apparatus; Described the first bend pulley, the first transmission device, the second transmission device, the second bend pulley and tensioning apparatus common driving have the belt of bottom, tunnel fixed conveyor; The inclined gallery of bottom, described tunnel utilize the platform E of bottom to be connected coal seam.
Described platform C and platform D can cancel accordingly according to the gradient of construction tunnel, or increase paired platform C and platform D; Upper and lower in tunnel for convenience of pedestrian, bottom, tunnel one side between described platform E and platform D has been built stepladders, has built wall ladder on tunnel one sidewall between platform D and platform A; Owing to having the discrepancy in elevation between each platform, for the ease of equipment, to install and maintenance, top, described tunnel longitudinal dispersion is provided with a plurality of boom hoistings; The inclined gallery of bottom, described tunnel can be arranged in coal seam, have solved in the situation of horizontal arrangement belt conveyer head chamber in general design, connect the problem that inclined gallery can not enter coal seam as early as possible, and a kind of rational development work arrangement is provided.Due to pulling capacity and tilting force larger, in foundation bottom or side wall, reinforcement measure is set, guarantee safety.
Advantage of the present utility model is: the apparatus arrangement of belt conveyer head is on inclined-plane, by the change of apparatus arrangement form, the effect that realization is in tilted layout, can make belt conveyer head chamber gallery relative length be reduced to 0, thereby realize the effect that tunnel is arranged along coal seam as early as possible, solved chamber near coal seam or a difficult problem for bottom and the larger situation of seam inclination, for the rational developing mode that provides is provided in development work.
The beneficial effects of the utility model are: the arrangement of the ribbon conveyer of this utility model in inclined shaft is simple, rationally novel, can more short-rangely approach underlying seam, for down-hole development work, arrange a kind of possibility is provided, when having removed belt conveyer head chamber entry, reduced stone head, thereby reduced excavation cost, improved drivage efficiency, more energy-conservation, be suitable for wide popularization and application.
(4) accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is further described.
Fig. 1 is A-A generalized section shown in Fig. 1;
Fig. 2 is layout schematic diagram of the present utility model;
Fig. 3 is specific embodiment sectional drawing of the present utility model.
In figure, 1 coal seam, 2 tunnels, 3 platform A, 4 platform B, 5 platform C, 6 platform D, 7 first bend pulleys, 8 first transmission devices, 9 second transmission devices, 10 second bend pulleys, 11 tensioning apparatus, 12 belts, 13 inclined gallery, 14 platform E, 15 stepladderses, 16 wall ladders, 17 boom hoistings.
(5) specific embodiment
Accompanying drawing is a kind of specific embodiment of the present utility model.This embodiment comprises the tunnel 2 that connects coal bunker and coal seam 1 inclination, it is characterized in that: described 2 bottom surfaces, tunnel near coal bunker are built and had platform A 3, platform B 4, platform C 5, platform D 6 successively from top to bottom, are placed with respectively the first bend pulley 7, the first transmission device 8, the second transmission device 9 and the second bend pulley 10 on platform A 3, platform B 4, platform C 5, platform D 6; On 2 inclined planes, tunnel of described platform D6 downside, be provided with tensioning apparatus 11; Described the first bend pulley 7, the first transmission device 8, the second transmission device 9, the second bend pulley 10 and tensioning apparatus 11 common drivings have the belt 12 of tunnel 2 bottom fixed conveyor; The inclined gallery 13 of 2 bottoms, described tunnel utilize the platform E 14 of bottom to be connected coal seam 1; Described platform C 5 and platform D 6 can cancel accordingly according to the gradient of construction tunnel 2, or increase paired platform C 5 and platform D 6; Tunnel 2 bottom one sides between described platform E 14 and platform D 6 have been built stepladders 15, on tunnel 2 one sidewalls between platform D 6 and platform A 3, have built wall ladder 16; Described tunnel 2 top longitudinal dispersions are provided with a plurality of boom hoistings 17; The inclined gallery 13 of 2 bottoms, described tunnel can be arranged in coal seam 1.
Adopt the arrangement of ribbon conveyer of the present utility model in inclined shaft, utilize platform E to connect inclined gallery, bottom 13, in Practical Project, arrangement is as Fig. 3.Coal is transported in coal bunker through belt 12.

Claims (5)

1. the ribbon conveyer arrangement in inclined shaft, comprise the tunnel (2) that connects coal bunker and coal seam (1) inclination, it is characterized in that: bottom surface, described tunnel (2) is built successively and had platform A(3 from top to bottom), platform B(4), platform C(50, platform D(6), platform A(3), platform B(4), platform C(5), platform D(6) on be placed with respectively the first bend pulley (7), the first transmission device (8), the second transmission device (9) and the second bend pulley (10); Described platform D(6) on the inclined plane, tunnel (2) of downside, be provided with tensioning apparatus (11); Described the first bend pulley (7), the first transmission device (8), the second transmission device (9), the second bend pulley (10) and tensioning apparatus (11) common driving have the belt (12) of bottom, tunnel (2) fixed conveyor; The inclined gallery (13) of bottom, described tunnel (2) utilize the platform E(14 of bottom) linking coal seam (1).
2. the arrangement of ribbon conveyer according to claim 1 in inclined shaft, it is characterized in that: described platform C(5) and platform D(6) can cancel accordingly according to the gradient of construction tunnel (2), or increase paired platform C(5) and platform D(6).
3. the arrangement of ribbon conveyer according to claim 1 in inclined shaft, it is characterized in that: described platform E(14) and platform D(6) between tunnel (2) bottom one side built stepladders (15), platform D(6) with platform A(3) between tunnel (2) one sidewalls on built wall terraced (16).
4. the arrangement of ribbon conveyer according to claim 1 in inclined shaft, is characterized in that: top, described tunnel (2) longitudinal dispersion is provided with a plurality of boom hoistings (17).
5. the arrangement of ribbon conveyer according to claim 1 in inclined shaft, is characterized in that: the inclined gallery (13) of described tunnel (2) bottom can be arranged in coal seam (1).
CN201320398854.0U 2013-07-05 2013-07-05 Installation arrangement of belt type transmission device in inclined drift Expired - Lifetime CN203488205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320398854.0U CN203488205U (en) 2013-07-05 2013-07-05 Installation arrangement of belt type transmission device in inclined drift

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320398854.0U CN203488205U (en) 2013-07-05 2013-07-05 Installation arrangement of belt type transmission device in inclined drift

Publications (1)

Publication Number Publication Date
CN203488205U true CN203488205U (en) 2014-03-19

Family

ID=50259044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320398854.0U Expired - Lifetime CN203488205U (en) 2013-07-05 2013-07-05 Installation arrangement of belt type transmission device in inclined drift

Country Status (1)

Country Link
CN (1) CN203488205U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2023125A (en) * 2018-05-14 2019-11-21 Jiangsu Vocational Inst Architectural Tech Side wall conveying system, a forming method and a conveying method for an explosion-proof coal mine roadway
CN112709581A (en) * 2020-12-28 2021-04-27 安徽工程大学 Inclined roadway construction operating platform and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2023125A (en) * 2018-05-14 2019-11-21 Jiangsu Vocational Inst Architectural Tech Side wall conveying system, a forming method and a conveying method for an explosion-proof coal mine roadway
CN112709581A (en) * 2020-12-28 2021-04-27 安徽工程大学 Inclined roadway construction operating platform and using method thereof

Similar Documents

Publication Publication Date Title
CN104564050B (en) Equipment for heading and anchoring parallel operation construction
CN101885413B (en) Large-inclination angle floating supporting type scraper conveyor
CN203961989U (en) A kind of full section rock drilling stand for the short benching tunnelling method construction in tunnel
CN105507951B (en) A kind of soft curtain encapsulating method in no coal column Duan Dingcheng lanes
CN104088643A (en) High-dipping extremely-close-distance coal seam top coal caving mining method
CN102444401B (en) Coal mining method by filling on blasting mining face of thin coal seam and relevant equipment
CN203488205U (en) Installation arrangement of belt type transmission device in inclined drift
CN102269013A (en) Method for mechanically filling gangue on single support working surface under complex coal seam condition
CN102748055A (en) Circulation advancing type forepoling support
CN202194681U (en) Movable transfer belt conveyor under coal mine
CN105134212A (en) Method for ensuring fully-mechanized top coal caving recovery rate of three-soft thick coal seam roadway tunneling along top
CN202703579U (en) Large slope inclined shaft rail transport construction apparatus
CN108386194A (en) A kind of continuous coal mining system of open coal mine modularization big cross section and method
CN201703841U (en) Large inclined angle floating support type scraper conveyor
CN105986821A (en) Mining method for steeply inclined coal seam
CN103233772A (en) Rapid filling mechanism for filling coal mining conveyor
CN211648003U (en) Drilling rig capable of moving integrally
CN203257463U (en) Filling guiding mechanism of solid filling conveyor
CN203257461U (en) Rapid filling mechanism for filling coal mining conveyor
CN203308464U (en) Heightened baffle structure for baffle and triangular inserting plate of scraper loader
CN102673949A (en) Scraper loader for tail driving type gate roadway
CN108118607A (en) Opencut is taken a step Tower Bridge equipment
CN202704396U (en) Foldable moveable belt conveyor
CN202300505U (en) Double-layered belt conveyor
CN203685189U (en) Working face tower type transfer conveyor for an open-pit mine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 250000 No. 141 Dikou Road, Tianqiao District, Jinan City, Shandong Province

Patentee after: GENERAL TECHNOLOGY GROPU ENGINEERING DESIGN Co.,Ltd.

Address before: 250031 No. 141 Dikou Road, Tianqiao District, Jinan City, Shandong Province

Patentee before: COAL INDUSTRY JINAN DESIGN & RESEARCH Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140319