CN203487637U - Toothed embedded channel - Google Patents
Toothed embedded channel Download PDFInfo
- Publication number
- CN203487637U CN203487637U CN201320484620.8U CN201320484620U CN203487637U CN 203487637 U CN203487637 U CN 203487637U CN 201320484620 U CN201320484620 U CN 201320484620U CN 203487637 U CN203487637 U CN 203487637U
- Authority
- CN
- China
- Prior art keywords
- hollow cuboid
- toothed
- face
- end surface
- side end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to an embedded channel and particularly relates to a toothed embedded channel, so as to solve the technical problems existing in the prior art under the condition of ensuring equipment to be in good installation condition. The toothed embedded channel is used and installed in match with a T-type bolt. During the installation period, drilling and matched drilling are not needed. As the channel is toothed, 360-DEG panoramic installation can be realized, and heavy torque bearing of the equipment can be ensured. The toothed embedded channel comprises a hollow cuboid; the bottom end surface of the hollow cuboid and the top end surface of the hollow cuboid are opened; the middle region of the end surface at one side of the hollow cuboid is opened, and the opening extends from the top end of the end surface at the side to the bottom end of the end surface at the side; side end surfaces, provided with openings, of the hollow cuboid, are provided with continuous racks; the racks are sequentially arranged along the side end surfaces with openings; and the tooth top of each rack is parallel with the cross section parallel with the bottom end surface. The toothed embedded channel can be applied to the field of embedded channel design.
Description
Technical field
The utility model is related to a kind of pre-buried channel flow, more particularly, to a kind of toothed pre-buried channel flow.
Background technology
Equipment is installed above current base station, mostly site operation drilling, the fracture of capital construction concrete reinforcing steel is easily caused in boring procedure, and manually borehole throw is larger, one equipment mounting hole site is often by repeatedly drilling, it is very big to the infringement of capital construction concrete, and loosening is installed because easily causing equipment after repeatedly punching, influence follow-up various kinds of equipment normally to use.Existing pre-buried technology applies the T-bolt in equipment right angle setting easily to slide, and influence equipment is used.
Pay attention to capital construction in the construction such as present room body, railway tunnel, pay attention to equipment purchase link, it is substantially all to despise and ignores equipment installation project technique, because extensive in construction work, there are mistakes and omissions when causing equipment to be installed with original design, cause more design alteration, because various design alterations ultimately result in heavy damage of the mounting process to civil engineering structure of element of installation, cause engineering construction service life to be had a greatly reduced quality.
Utility model content
Technical problem to be solved in the utility model is:The problem of existing for prior art, in the case where ensureing that equipment installation is intact, designs the toothed pre-buried channel flow of a class, supporting T-bolt is using installing, and installation period zero drills, and zero with brill, due to conduit band tooth, 360 ° of panoramas can be achieved and install, can guarantee that equipment gravitational moment is born.
The technical solution adopted in the utility model is as follows:
A kind of toothed pre-buried channel flow includes hollow cuboid, the hollow cuboid bottom face, hollow cuboid top end face are opening, the side end face intermediate region opening of hollow cuboid one, the opening is along this side end face top to this side end face bottom, the hollow cuboid sets the side end face of opening to be provided with continuous tooth bar, and the tooth bar is arranged in order along opening side end face;The tooth top of each tooth bar is parallel with the cross section parallel to bottom face.
The profile angle α of the tooth bar is 70 ° -80 °.
The α is 75 °.
The height H of the tooth bar is 2mm to 3mm.
The height H of the tooth bar is 2.5mm.
The opposing end surface both ends of the surface formation arc surface adjacent thereto of the side end face for being provided with opening, the arc radius r is 2mm to 3mm.
The arc radius r is 2.5mm.
The hollow cuboid material is Q235B.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
1)Tooth bar is set so that can be realized 360 ° of panorama installations in installation process, effectively be reduced because of additional installed part derived from setting angle.
2)The tooth height of this high scope of tooth is set, and advantage is that, by many experiments, this scope tooth height can be maximized on the premise of connection anti-shearing force is ensured to be made to engage reliability between T-bolt and tooth.
3)Open end and adjacent face are set to arc-shaped, R2.5 roundings enable conduit maximized increase stretching resistance when by vertical stress.
4)Attempted by multiple material, be used as rolling steel billet from Q235B steel, it is ensured that strength and toughness, special C-shaped conduit is rolled using special roll.
Brief description of the drawings
The utility model will illustrate by example and with reference to the appended drawing, wherein:
Fig. 1 is the utility model stereogram.
Fig. 2 is Fig. 1 along hollow cuboid bottom face to the axial schematic cross-sectional view of top end face.
Fig. 3 is the utility model left view。
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with drawings and Examples, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is not used to limit the utility model only to explain the utility model.
Embodiment one:As shown in Figure 1, Figure 2, Figure 3 shows, a kind of toothed pre-buried channel flow includes hollow cuboid, the hollow cuboid bottom face, hollow cuboid top end face are opening, the side end face intermediate region opening of hollow cuboid one, the opening is along this side end face top to this side end face bottom, the hollow cuboid sets the side end face of opening to be provided with continuous tooth bar, and the tooth bar is arranged in order along opening side end face;The tooth top of each tooth bar is parallel with the cross section parallel to bottom face.
Embodiment two:On the basis of embodiment one, the height H of tooth bar is 2mm.
Embodiment three:On the basis of embodiment one, the height H of tooth bar is 3mm.
Example IV:On the basis of embodiment one, the profile angle α of the tooth bar is 70 °.
Embodiment five:On the basis of embodiment one, the profile angle α of the tooth bar is 80 °.
Embodiment six:On the basis of embodiment one, arc surface, the radius r=14mm of arc surface are formed between opening side end face and adjacent both ends face.
Embodiment seven:On the basis of embodiment one, arc surface, the radius r=16mm of arc surface are formed between opening side end face and adjacent both ends face.
All features disclosed in this specification, in addition to mutually exclusive feature, can be combined in any way.
This specification(Including any accessory claim, summary and accompanying drawing)Disclosed in any feature, unless specifically stated otherwise, can alternative features equivalent by other or with similar purpose replaced.I.e., unless specifically stated otherwise, each feature is an example in a series of equivalent or similar characteristics.
Claims (8)
1. a kind of toothed pre-buried channel flow, it is characterized in that including hollow cuboid, the hollow cuboid bottom face, hollow cuboid top end face are opening, the side end face intermediate region opening of hollow cuboid one, the opening is along this side end face top to this side end face bottom, the hollow cuboid sets the side end face of opening to be provided with continuous tooth bar, and the tooth bar is arranged in order along opening side end face;The tooth top of each tooth bar is parallel with the cross section parallel to bottom face.
2. a kind of toothed pre-buried channel flow according to claim 1, it is characterised in that the profile angle α of the tooth bar is 70 ° -80 °.
3. a kind of toothed pre-buried channel flow according to claim 2, it is characterised in that the α is 75 °.
4. a kind of toothed pre-buried channel flow according to claim 1, it is characterised in that the height H of the tooth bar is 2mm to 3mm.
5. a kind of toothed pre-buried channel flow according to claim 4, it is characterised in that the height H of the tooth bar is 2.5mm.
6. a kind of toothed pre-buried channel flow according to claim 1, it is characterised in that the opposing end surface both ends of the surface formation arc surface adjacent thereto of the side end face for being provided with opening, the arc radius r is 2mm to 3mm.
7. a kind of toothed pre-buried channel flow according to claim 6, it is characterised in that the arc radius r is 2.5mm.
8. a kind of toothed pre-buried channel flow according to one of claim 1 to 7, it is characterised in that the hollow cuboid material is Q235B.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320484620.8U CN203487637U (en) | 2013-08-09 | 2013-08-09 | Toothed embedded channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320484620.8U CN203487637U (en) | 2013-08-09 | 2013-08-09 | Toothed embedded channel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203487637U true CN203487637U (en) | 2014-03-19 |
Family
ID=50258478
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320484620.8U Expired - Fee Related CN203487637U (en) | 2013-08-09 | 2013-08-09 | Toothed embedded channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203487637U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104452977A (en) * | 2014-11-14 | 2015-03-25 | 刘卡丁 | Urban rail traffic engineering electromechanical equipment embedded part installation method |
CN109058587A (en) * | 2018-09-04 | 2018-12-21 | 河南厚德电力科技有限公司 | Comprehensive suspension and support high strength alumin ium alloy C-shaped channel and its moulding process |
-
2013
- 2013-08-09 CN CN201320484620.8U patent/CN203487637U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104452977A (en) * | 2014-11-14 | 2015-03-25 | 刘卡丁 | Urban rail traffic engineering electromechanical equipment embedded part installation method |
CN109058587A (en) * | 2018-09-04 | 2018-12-21 | 河南厚德电力科技有限公司 | Comprehensive suspension and support high strength alumin ium alloy C-shaped channel and its moulding process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204372344U (en) | Furred ceiling combined pillar | |
CN107882591B (en) | Assembled hanging piece, rapid mounting device and mounting method | |
CN206486904U (en) | A kind of underground pipe gallery mounting system | |
CN203487637U (en) | Toothed embedded channel | |
CN105256926A (en) | Board slot type embedded part system | |
CN204726253U (en) | Overheat rigid contact network suspension | |
CN107939292A (en) | Karst region subway tunnel limestone section grouting for water blocking drilling deviation correcting device and method | |
CN205134656U (en) | Board groove -type embedded part system | |
CN204004796U (en) | A kind of tunnel cable bearer | |
CN207728391U (en) | A kind of assembled hangers pendant and prompt assembling device | |
CN207484703U (en) | A kind of concrete embedded conduit | |
CN206220286U (en) | A kind of fire protection plaster block | |
CN206722625U (en) | A kind of power set of closed guard gate | |
CN205129717U (en) | Flange Gap Expander | |
CN205000653U (en) | Concrete pump pipe fixing device | |
CN207063567U (en) | A kind of seat-belt anchorage for standing-seam metal Roof | |
CN201982112U (en) | Arch crown steel frame mounting device for construction | |
CN102582661B (en) | Sleeve type indication rod for electric hydraulic switch machine | |
CN205298168U (en) | A connection structure for sheet metal component | |
CN205452985U (en) | Novel cable bearer | |
CN204464903U (en) | The adjustable hanger device of intensive bus large span multi-cascade | |
CN202508721U (en) | Rope race protective device of hoisting rope installation | |
CN210179052U (en) | Comprehensive support and hanger assembly for arc-shaped mounting surface | |
CN212802651U (en) | Equipment entrance to a cave protective structure | |
CN219643485U (en) | Welding-free hanging bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140319 Termination date: 20190809 |
|
CF01 | Termination of patent right due to non-payment of annual fee |