CN203474516U CN201320424096.5U CN201320424096U CN203474516U CN 203474516 U CN203474516 U CN 203474516U CN 201320424096 U CN201320424096 U CN 201320424096U CN 203474516 U CN203474516 U CN 203474516U
Authority
CN
China
Prior art keywords
reaction
mud
removing bucket
mud discharge
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320424096.5U
Other languages
Chinese (zh)
Inventor
黄志伟
蒋春燕
夏源
艾云鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU YUANTAIHENG ENVIRONMENTAL ENGINEERING Co Ltd
Original Assignee
JIANGSU YUANTAIHENG ENVIRONMENTAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU YUANTAIHENG ENVIRONMENTAL ENGINEERING Co Ltd filed Critical JIANGSU YUANTAIHENG ENVIRONMENTAL ENGINEERING Co Ltd
Priority to CN201320424096.5U priority Critical patent/CN203474516U/en
Application granted granted Critical
Publication of CN203474516U publication Critical patent/CN203474516U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The utility model discloses a novel fully-automatic mining chemical pre-settling device. The novel fully-automatic mining chemical pre-settling device comprises a reaction area, a clarifying and separating area and a work platform accessory, wherein a water inlet, a spacing groove and a water through hole are formed in the reaction area; a reaction mud discharge bucket is arranged below the spacing groove, a reaction mud discharge port is formed in the bottom end of the reaction mud discharge bucket; a water outlet, an effluent weir and a stuffing holder are formed in the clarifying and separating area; inclined tube stuffing is laid on the stuffing holder; a sediment mud discharge bucket is arranged below the clarifying and separating area; a sediment mud discharge port is formed in the bottom end of the sediment mud discharge bucket. Due to the adoption of hydraulic automatic control, the primary full purification can be performed on coal dust particles and suspended solids, and the national safe emission standard is achieved.

Description

A kind of novel Full-automatic mine chemistry preliminary sedimentation device
Technical field
The utility model relates to a kind of sewage purifier, specifically a kind of Full-automatic mine chemistry preliminary sedimentation device.
Background technology
Well-known China is the serious deficient country of a water resources, owning amount is only 1/4 of world average level per capita, China is also coal mining big country simultaneously, Coal Energy Source has occupied 67.3% of energy total amount, the exploitation of coal makes underground water data be subject to very large pollution, a large amount of coal seams particle, rock dust, suspended substance, artifact pollution enters in water, if mine discharges the not treated direct discharge of a large amount of overstandard waste waters, easily cause water pollution, ground water regime is destroyed, even without producing, life water source, what therefore scientific and reasonable processing waste water of mine just showed is very important, traditional refining plant installation period is long, cost is high, after adding flocculation agent, often due to the reaction times, (reaction times of existing most domestic water purifier is relatively short not, short T=4min, in T=8min, thereby its outlet effect is not very desirable long 12min only).
Utility model content
The utility model will address the above problem exactly provides a kind of long reaction time. the Full-automatic mine chemistry preliminary sedimentation device that effluent index is excellent.
The utility model is achieved through the following technical solutions above-mentioned purpose:
A kind of novel Full-automatic mine chemistry preliminary sedimentation device, comprise reaction zone, clarified separation district and job platform associate member, described reaction zone is provided with water-in, separate slot and water hole, and described separate slot below is provided with reaction mud-removing bucket, and reaction mud-removing bucket bottom offers reaction mud discharging mouth; Described clarified separation district is provided with water outlet, effluent weir and filler support, and filler support top is equipped with inclined tube filler, and below, clarified separation district offers precipitation mud-removing bucket, and precipitation mud-removing bucket bottom offers precipitation mud discharging mouth.
Further described reaction mud-removing bucket angle of inclination is 65 °-69 °.
Further described precipitation mud-removing bucket angle of inclination is 50 °-52 °.
Further described effluent weir is saw chi shape, and gap is 80cm-100cm.
Further described inclined tube filler adopts glass reinforced plastic or PVC material.
Beneficial effect:
The utility model has increased the coagulating time by the texture improvement of full automatic water purifier conversion zone to a coal dust material, strengthened the variation of waste water fluidised form, make coagulating more thorough, sedimentation effect is more obvious. by inclined tube is set, increase the contact area of suspended substance flock, improve surface load, realized the sharp separation to suspended substance.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the vertical view of Fig. 1.
In figure: 1, reaction zone 2, clarified separation district 3, water-in 4, water outlet 5, effluent weir 6, separate slot 7, inclined tube filler 8, reaction mud-removing bucket 9, reaction mud discharging mouth 10, precipitation mud-removing bucket 11, filler support 12, precipitation mud discharging mouth 13, job platform associate member
Embodiment
A kind of novel Full-automatic mine chemistry preliminary sedimentation device, comprise reaction zone 1, clarified separation district 2 and job platform associate member 13, described reaction zone 1 is provided with water-in 3, separate slot 6 and water hole 9, described separate slot 6 belows are provided with reaction mud-removing bucket 8, reaction mud-removing bucket 8 angles of inclination are 69 °, and reaction mud-removing bucket 8 bottoms offer reaction mud discharging mouth 9; Described clarified separation district 2 is provided with water outlet 4, effluent weir 5 and filler support 11, effluent weir 5 is saw chi shape, filler support 11 tops are equipped with inclined tube filler 7, inclined tube filler 7 adopts glass reinforced plastic, 2 belows, clarified separation district offer precipitation mud-removing bucket 10, precipitation mud-removing bucket 10 angles of inclination are 52 °, and precipitation mud-removing bucket 10 bottoms offer precipitation mud discharging mouth 12.
The utility model has increased the coagulating time by the texture improvement of full automatic water purifier conversion zone to a coal dust material, strengthened the variation of waste water fluidised form, make coagulating more thorough, sedimentation effect is more obvious. by inclined tube is set, increase the contact area of suspended substance flock, improve surface load, realized the sharp separation to suspended substance.

Claims (5)

1. a novel Full-automatic mine chemistry preliminary sedimentation device, comprise reaction zone (1), clarified separation district (2) and job platform associate member (13), it is characterized in that: described reaction zone (1) is provided with water-in (3), separate slot (6) and water hole (9), described separate slot (6) below is provided with reaction mud-removing bucket (8), and reaction mud-removing bucket (8) bottom offers reaction mud discharging mouth (9); Described clarified separation district (2) is provided with water outlet (4), effluent weir (5) and filler support (11), filler support (11) top is equipped with inclined tube filler (7), below, clarified separation district (2) offers precipitation mud-removing bucket (10), and precipitation mud-removing bucket (10) bottom offers precipitation mud discharging mouth (12).
2. a kind of novel Full-automatic mine chemistry preliminary sedimentation device according to claim 1, is characterized in that described reaction mud-removing bucket (8) angle of inclination is 65 °-69 ℃.
3. a kind of novel Full-automatic mine chemistry preliminary sedimentation device according to claim 1, is characterized in that described precipitation mud-removing bucket (10) angle of inclination is 50 °-52 ℃.
4. a kind of novel Full-automatic mine chemistry preliminary sedimentation device according to claim 1, is characterized in that described effluent weir (5) is for saw chi shape, and sawtooth gap is 80cm-100cm.
5. a kind of novel Full-automatic mine chemistry preliminary sedimentation device according to claim 1, is characterized in that described inclined tube filler (7) adopts glass reinforced plastic or PVC material.
CN201320424096.5U 2013-07-16 2013-07-16 Novel fully-automatic mining chemical pre-settling device Expired - Fee Related CN203474516U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320424096.5U CN203474516U (en) 2013-07-16 2013-07-16 Novel fully-automatic mining chemical pre-settling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320424096.5U CN203474516U (en) 2013-07-16 2013-07-16 Novel fully-automatic mining chemical pre-settling device

Publications (1)

Publication Number Publication Date
CN203474516U true CN203474516U (en) 2014-03-12

Family

ID=50222889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320424096.5U Expired - Fee Related CN203474516U (en) 2013-07-16 2013-07-16 Novel fully-automatic mining chemical pre-settling device

Country Status (1)

Country Link
CN (1) CN203474516U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291417A (en) * 2013-07-16 2015-01-21 江苏源泰恒环境工程有限公司 Novel mine-use full-automatic chemical pre-precipitating device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291417A (en) * 2013-07-16 2015-01-21 江苏源泰恒环境工程有限公司 Novel mine-use full-automatic chemical pre-precipitating device

Similar Documents

Publication Publication Date Title
CN104310554A (en) Novel micro-nano bubble flocculation-air floatation process
CN103537123B (en) Flow stabilizing device applied to concentrator
CN210237322U (en) Mine water recycling treatment system
CN203355383U (en) Coagulative precipitation tank
CN203474516U (en) Novel fully-automatic mining chemical pre-settling device
CN202390268U (en) In-situ reuse treatment system for downhole directional drilling machine medium circulation water
CN205361690U (en) Hydraulic classification desliming cylinder for bauxite
CN203609932U (en) Flow stabilizer for thickener
CN203355386U (en) Deep cone thickener
CN207142894U (en) System for coal mine water process
CN206467021U (en) A kind of rapid sedimentation tank
CN203244813U (en) Flat bottom subsider for double feeding pipe
CN204675924U (en) A kind of integral biological amboceptor dephosphorizing reactor
CN112028194B (en) Mine water flash mixing low-speed multi-stage dosing method and device
CN205145683U (en) Can improve ramp type sedimentation tank of row mud efficiency
CN205007658U (en) Wet concrete separating centrifuge sewage fill with breakwater
CN212387837U (en) Mine circulating water treatment system
CN204097278U (en) Mining area sewage simple type treatment unit
CN204490586U (en) From interception type aerobic reactor
CN103420523A (en) Technology for treating barren rock leaching water and other acid wastewater in low-grade pyrite
CN208959386U (en) A kind of efficient fast precipitating separator for high
CN104291417A (en) Novel mine-use full-automatic chemical pre-precipitating device
CN103463836B (en) Combined sediment collector for ash water of ash field and collection method thereof
CN202527005U (en) High-efficiency water purification pool of mine water
CN207024714U (en) It is a kind of tangentially to enter streaming deep cone thickener system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312

Termination date: 20210716

CF01 Termination of patent right due to non-payment of annual fee