CN203473622U - Storage bin - Google Patents
Storage bin Download PDFInfo
- Publication number
- CN203473622U CN203473622U CN201320481681.9U CN201320481681U CN203473622U CN 203473622 U CN203473622 U CN 203473622U CN 201320481681 U CN201320481681 U CN 201320481681U CN 203473622 U CN203473622 U CN 203473622U
- Authority
- CN
- China
- Prior art keywords
- storage bin
- bin
- warehouse
- display device
- read out
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Solid Fuels And Fuel-Associated Substances (AREA)
Abstract
The utility model relates to a storage bin, in particular to a biomass storage bin with the surplus of materials visible. The storage bin comprises a bin body and a support, a smoke detecting instrument and an automatic water spraying switch are arranged at the upper end of the storage bin, a conical body is arranged on the lower portion of the bin body, a feeding port and a discharging port are formed in the bin body, a pneumatic valve is arranged on the discharging port, sealing devices are arranged on the feeding port and the discharging port of the storage bin respectively, five material level detectors are arranged on the side wall of the bin body, a display device is arranged outside the storage bin, the material level detectors are connected with the display device, and the display device comprises a programmable logic controller. The storage bin is small in occupied area, environmentally friendly, free of pollution and high in safety performance, people can master the quantity of stored materials so that the procurement plan of fuel of a next batch can be made, and therefore production is prevented from being interrupted, and production efficiency is improved.
Description
Technical field
The utility model relates to a kind of storage equipment of living beings Industrial Boiler, is specifically related to a kind of living beings storage bin of automatic material controlling.
Background technology
Along with society and expanding economy, the whole world increases day by day to the demand of the energy.Mankind's fossil energy utilizing of mainly relying is not only non-renewable energy resources, and it utilizes the havoc that has caused environment, so the exploitation of renewable and clean energy resource are more and more subject to people's attention.
Biomass energy can be converted into conventional solid-state, liquid state and fuel gas.Biomass energy is the fourth-largest energy that is only second to coal, oil, natural fuels.Wherein, only have biomass energy to there is recyclability.And in its growth course, absorb the carbon dioxide in atmosphere, thereby the exploitation biomass energy of employing new technology, the fossil fuel such as alternative part oil, natural fuels, coal not only, and, contribute to alleviate green-house effect and promote benign ecological cycles, becoming one of important channel solving energy and environment problem.
At present, take in the steam generator system that living beings are raw material, in existing storage bin device, be not provided with Charge level measurer or with the read out instrument of programmable logic controller (PLC), the input of material and supplement and all to need manually to complete, and people be all generally by estimation material injected volume and at ordinary times subjective experience judge material surplus in storage bin, this mode accuracy is not enough, and data are comparatively fuzzy.And biomass boiler is larger to living beings demand, the general storage of the storage bin fuel of 5 to 10 days, if can not accurately estimate material surplus in storage bin, easily occurs that biomass material uses up, follow-up fuel but also in transit, has a strong impact on continuity and the efficiency of production.
Utility model content
The purpose of this utility model is: provide a kind of and can grasp at any time the how many storage bin of storing amount.
The technical solution of the utility model is: a kind of storage bin, comprise warehouse and support, on warehouse, there are inlet point and discharging opening, operated pneumatic valve is housed on discharging opening, on warehouse sidewall, be provided with at least 1 Charge level measurer, storage bin outer setting has read out instrument, and described Charge level measurer is connected with described read out instrument.
5 material level points that Charge level measurer is housed are set on described warehouse sidewall, in described read out instrument, comprise programmable logic controller (PLC).
Described storage bin upper end is provided with flue gas detection instrument and automatic water jetting switch, and sealing arrangement is all housed on the inlet point of described storage bin and discharging opening.
Described storage bin is vertical storage bin, and described warehouse bottom is bullet.
The utility model floor area is little, can control feed, can grasp at any time storing amount number to formulate the procurement plan of next group fuel, thereby preventing from producing is interrupted, and enhances productivity.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present utility model.
The specific embodiment
Preferred embodiment of the present utility model is:
As shown in Figure 1, a kind of vertical storage bin, comprise warehouse 1 and support 2, feed bin upper end is provided with flue gas detection instrument 3 and automatic water jetting switch 4, warehouse bottom is bullet, on warehouse 1, there are inlet point 5 and discharging opening 6, operated pneumatic valve 8 is housed on discharging opening 6, on the inlet point 5 of storage bin and discharging opening 6, sealing arrangement is all housed.On warehouse sidewall, be provided with 5 Charge level measurers 7, storage bin outer setting has read out instrument, and described Charge level measurer is connected with read out instrument, comprises programmable logic controller (PLC) in read out instrument.
Described warehouse sidewall is longitudinally uniformly distributed 5 material level points from a high position to low level, by enrolling related command to programmable logic controller (PLC), regulation 5 material level points from a high position to low level are corresponding high-order respectively, high bit, meta, compared with low level, low level, described 5 material level points combine and are presented on described read out instrument with storage bin schematic diagram, in storage bin height of materials arrives during site, controller starts to allow external device to storage bin, feed intake until add to high site, when storage bin height of materials arrives compared with low points, controller gives the alarm, prompting staff need to formulate the procurement plan of next group fuel.
This storage bin is vertical full-closed structure, makes fuel be difficult for moisture regain dust and can not be dispersed into contaminated environment in air, and floor area is little; The top of storage bin is provided with flue gas and surveys negotiation automatic fire extinguisher, prevents fuel spontaneous combustion presence of fire accident.
Claims (5)
1. a storage bin, comprises warehouse and support, has inlet point and discharging opening on warehouse, it is characterized in that: valve is housed on discharging opening, on warehouse sidewall, be provided with at least 1 Charge level measurer, storage bin outer setting has read out instrument, and described Charge level measurer is connected with described read out instrument.
2. storage bin according to claim 1, is characterized in that: 5 material level points that Charge level measurer is housed are set on described warehouse sidewall, in described read out instrument, comprise programmable logic controller (PLC).
3. storage bin according to claim 1 and 2, is characterized in that: described storage bin upper end is provided with flue gas detection instrument and automatic water jetting switch, and sealing arrangement is all housed on the inlet point of described storage bin and discharging opening.
4. storage bin according to claim 1 and 2, is characterized in that: described storage bin is vertical storage bin, and described warehouse bottom is bullet.
5. storage bin according to claim 3, is characterized in that: described storage bin is vertical storage bin, and described warehouse bottom is bullet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320481681.9U CN203473622U (en) | 2013-08-08 | 2013-08-08 | Storage bin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320481681.9U CN203473622U (en) | 2013-08-08 | 2013-08-08 | Storage bin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203473622U true CN203473622U (en) | 2014-03-12 |
Family
ID=50222001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320481681.9U Expired - Fee Related CN203473622U (en) | 2013-08-08 | 2013-08-08 | Storage bin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203473622U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104691990A (en) * | 2015-02-13 | 2015-06-10 | 广州迪森热能技术股份有限公司 | Biomass fuel storage silo |
CN106516545A (en) * | 2016-11-12 | 2017-03-22 | 山东华建仓储装备科技有限公司 | Novel biomass pellet fuel warehousing device system |
-
2013
- 2013-08-08 CN CN201320481681.9U patent/CN203473622U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104691990A (en) * | 2015-02-13 | 2015-06-10 | 广州迪森热能技术股份有限公司 | Biomass fuel storage silo |
CN106516545A (en) * | 2016-11-12 | 2017-03-22 | 山东华建仓储装备科技有限公司 | Novel biomass pellet fuel warehousing device system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204051428U (en) | A kind of waste incineration dry method fly ash re-injection system | |
CN203473622U (en) | Storage bin | |
CN204159215U (en) | A kind of box effluent reactor for low-temperature denitration of flue gas | |
CN204421056U (en) | A kind of take living beings as the saving emission reduction device of boiler of fuel | |
CN204372550U (en) | Many sources of the gas mix defeated natural gas supply system | |
CN203797666U (en) | Chicken manure fueled circulating fluidized bedboiler | |
CN204372546U (en) | LNG storage tank Zero emission device | |
CN204114582U (en) | Methane street lamp combination unit | |
CN203784929U (en) | Multipurpose two-time-baffling biomass combustion furnace | |
CN204922829U (en) | Use street lamp lighting system of biomass energy electricity generation energy supply | |
CN205347438U (en) | Biogas fermentation control system of marsh gas production | |
CN205717182U (en) | CFBB ash exhauster | |
CN204285444U (en) | A kind of biomass particle burning machine | |
CN204717672U (en) | Biomass fuel suspension combustion machine | |
CN203546014U (en) | Furnace type household dry fermentation biogas generator | |
CN202364157U (en) | Household solar power generation application system | |
CN202470074U (en) | System for winter garbage wet steam fermentation of household garbage incineration power plant | |
CN203923197U (en) | A kind of integrated two-phase anaerobic device for producing methane by fermentation | |
CN204315057U (en) | Fire detector tester | |
CN203545949U (en) | Gas generator | |
CN204662663U (en) | Modular containers resident systems | |
CN107654262A (en) | A kind of closed loop energy resource system | |
CN201842831U (en) | Skid-mounted biological natural gas low-pressure purification device | |
CN202166180U (en) | Full-automatic biomass gasification boiler | |
CN208418764U (en) | A kind of biological particles combustion cell |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140312 Termination date: 20200808 |