CN203470675U - Sealing tool of process pipe, process pipe and air conditioner - Google Patents

Sealing tool of process pipe, process pipe and air conditioner Download PDF

Info

Publication number
CN203470675U
CN203470675U CN201320592187.XU CN201320592187U CN203470675U CN 203470675 U CN203470675 U CN 203470675U CN 201320592187 U CN201320592187 U CN 201320592187U CN 203470675 U CN203470675 U CN 203470675U
Authority
CN
China
Prior art keywords
sealing
mouth
process duct
sealed portion
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320592187.XU
Other languages
Chinese (zh)
Inventor
薛战
黄国新
高超
刘伟
张雅琴
余磊
廖可捷
王建超
王永凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201320592187.XU priority Critical patent/CN203470675U/en
Application granted granted Critical
Publication of CN203470675U publication Critical patent/CN203470675U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Gasket Seals (AREA)

Abstract

The utility model discloses a sealing tool of technology pipe, comprises a die, the mould is including the first mould that has first sealing to and the second mould that has the second sealing, first sealing with the second sealing sets up relatively, first sealing with at least one in the second sealing includes two or more than two sealing convex parts, adjacent two it has sunkenly to seal between the convex part. The utility model provides a seal the instrument and make to have on the technology pipe and seal and compress tightly the district and warp the transition region, should warp the transition region and can provide the buffering for stress, and then alleviate stress concentration phenomenon, prevent to seal simultaneously and compress tightly the position formation stress coincidence district in district both sides to reduce the probability that crackle appears on the technology pipe, alleviate the hourglass phenomenon of splitting that the technology pipe appears. The utility model also discloses an adopt above-mentioned instrument of sealing to seal fashioned technology pipe to and an air conditioner that contains above-mentioned technology pipe.

Description

The sealing tool of process duct, process duct and air-conditioner
Technical field
The utility model relates to process duct processing unit (plant) technical field, relates in particular to a kind of sealing tool of process duct.The utility model also relates to a kind of process duct and a kind of air-conditioner.
Background technology
Conventionally adopting process pipe perfusion refrigerant in equipment such as air-conditioner, refrigerator, this process duct is also one of approach of vacuumizing of equipment, so sealing and intensity after this process duct sealing have larger impact to the functional reliability of pipeline in equipment.
At present comparatively conventional sealing mode is gas brazing sealing, and after utilizing sealing tool that this sealing mode is corresponding to seal process duct, the sealing part of process duct is cutting edge structure, and this cutting edge structure is become by sealing tool folder flat.Yet because above-mentioned process duct has larger wedge angle at cutting edge structure place, this wedge angle causes easily occurring that stress is concentrated herein, when process duct is subject to easily occurring crackle when external force bends repeatedly, even fracture, causes process duct to occur splitting leakage.Simultaneously, the cutting edge structure of process duct is carried out finding after mechanical analysis and micro metallographic analysis, the position that is positioned at these cutting edge structure both sides in process duct will form stress coincidence district (stress during sealing overlaps with the system pressure of equipment), and then forms crackle, causes equally process duct to occur splitting leakage.
In sum, how to solve process duct and easily occur splitting the problem of leaking phenomenon, become those skilled in the art's technical barrier urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is to provide a kind of sealing tool of process duct, and this instrument can alleviate that process duct occurs splits leakage phenomenon.Another object of the present utility model is to provide a kind of process duct and a kind of air-conditioner.
To achieve these goals, the utility model provides following technical scheme:
A kind of sealing tool of process duct, comprise mould, described mould comprises first mould with the first mouth-sealed portion, and second mould with the second mouth-sealed portion, described the first mouth-sealed portion and described the second mouth-sealed portion are oppositely arranged, at least one in described the first mouth-sealed portion and described the second mouth-sealed portion comprises two or more sealing protuberances, between adjacent two described sealing protuberances, has depression.
Preferably, in above-mentioned sealing tool, described the first mouth-sealed portion and described the second mouth-sealed portion include two or more sealing protuberances.
Preferably, in above-mentioned sealing tool, the sealing height of described the first mouth-sealed portion equates with the sealing height of described the second mouth-sealed portion.
Preferably, in above-mentioned sealing tool, the working face area that seals protuberance described in each of described the first mouth-sealed portion equates with the working face area that seals protuberance described in each of described the second mouth-sealed portion.
Preferably, in above-mentioned sealing tool, the working face of described sealing protuberance is plane, and the rotational plane of described plane and described mould is perpendicular.
Preferably, in above-mentioned sealing tool, the length range of the length range of described the first mouth-sealed portion and described the second mouth-sealed portion is 167%~233% of process duct diameter.
Preferably, in above-mentioned sealing tool, the face length of described sealing protuberance is 50%~83.3% of process duct diameter.
Preferably, in above-mentioned sealing tool, the length of the described depression between adjacent two described sealing protuberances is 50%~83.3% of process duct diameter.
A process duct, this process duct adopts the sealing tool sealing moulding described in above-mentioned any one.
A kind of process duct, comprise sealing pipeline section, described sealing pipeline section comprises two sealing plastic zones and the Transition Zone of Deformation between two described sealing plastic zones, the surface of described sealing plastic zone is plane, described plane is parallel with the axis of described process duct, the surface of described Transition Zone of Deformation is the cambered surface to the outside depression of described sealing pipeline section, and described sealing plastic zone and described Transition Zone of Deformation are the median plane symmetrical structure about described process duct.
An air-conditioner, comprises process duct, and described process duct is above-mentioned process duct.
In technique scheme, the sealing tool of the process duct that the utility model provides comprises mould, this mould comprises first mould with the first mouth-sealed portion, and second mould with the second mouth-sealed portion, this first mouth-sealed portion and the second mouth-sealed portion are oppositely arranged, at least one in the first mouth-sealed portion and the second mouth-sealed portion comprises two or more sealing protuberances, between adjacent two sealing protuberances, has depression.When adopting above-mentioned sealing tool to carry out sealing operation to process duct, in process duct, will there are at least two sealing plastic zones, and there is Transition Zone of Deformation between adjacent two sealing plastic zones.Obviously, than the content of introducing in background technology, the sealing tool that the utility model provides makes to have in process duct sealing plastic zone and Transition Zone of Deformation, this Transition Zone of Deformation can provide buffering for stress, and then relieve stresses concentration phenomenon, the position that simultaneously prevents from sealing both sides, plastic zone forms stress coincidence district, thereby reduces the probability that occurs crackle in process duct, and what alleviate that process duct occurs splits leakage phenomenon.
Because above-mentioned sealing tool has above-mentioned technique effect, adopt the process duct of this sealing tool sealing moulding and comprise that the air-conditioner of this process duct also should have corresponding technique effect.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in the utility model embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
The structural representation of the mould in the sealing tool that Fig. 1 provides for the utility model embodiment;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is the upward view of Fig. 3;
The first step operation chart when sealing tool that Fig. 5 provides for the utility model embodiment is used;
Second step operation chart when the sealing tool that Fig. 6 provides for the utility model embodiment is used;
The 3rd step operation chart when the sealing tool that Fig. 7 provides for the utility model embodiment is used;
The structural representation of the process duct that Fig. 8 provides for the utility model embodiment;
Fig. 9 is the front view of Fig. 8;
Figure 10 is the top view of Fig. 9.
In upper Fig. 1-10:
Tool body 10, die ontology 11, sealing protuberance 12, cave in 13, process duct 21, sealing 211, Transition Zone of Deformation, plastic zone 212, snap joint 31, glue injection device 32.
The specific embodiment
Core of the present utility model is to provide a kind of sealing tool of process duct, and this instrument can alleviate that process duct occurs splits leakage phenomenon.Another core of the present utility model is to provide a kind of process duct and a kind of air-conditioner.
In order to make those skilled in the art understand better the technical scheme that the utility model provides, below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As Figure 1-10 shows, the sealing tool of the process duct that the utility model embodiment provides, for process duct 21 is sealed to moulding, this sealing tool is similar and structure pliers, it comprises tool body 10 and is installed on the mould on tool body 10, this mould comprises the first mould and the second mould, both are arranged on two relative installation ends of tool body 10, when operating personnel operate this sealing tool, the first mould and the second mould are close gradually, and then clamp process duct 21, realize the clamping sealing to process duct 21.The structure of above-mentioned the first mould can be as Figure 1-4, it comprises die ontology 11 and is installed on the first mouth-sealed portion on die ontology 11, similarly, the second mould comprises die ontology and is installed on the second mouth-sealed portion on die ontology, the first mouth-sealed portion and the second mouth-sealed portion are oppositely arranged, both contact with process duct 21 in the process of docking, thereby apply clamping force to process duct 21.
The key improvements part of the utility model embodiment is, at least one in above-mentioned the first mouth-sealed portion and the second mouth-sealed portion comprises two or more sealing protuberances 12, and has depression 13 between adjacent two sealing protuberances.Above-mentioned sealing protuberance 12 will apply active force at the first mould to process duct 21 with in the relative close process of the second mould, make process duct 21 local deformations, impel the opposing sidewalls of process part 21 mutually close.Particularly, in above-mentioned sealing tool, can adopt the first mouth-sealed portion only or the second mouth-sealed portion to comprise the scheme between 12, two sealing protuberances 12 of two sealing protuberances with depression 13.Certainly, the quantity of sealing protuberance 12 is not limited to two, also can be three or morely, specifically determines according to the actual requirements.
As shown in Fig. 5-7, so that the process duct in air-conditioner is sealed with above-mentioned sealing tool, be example, first adopt this sealing tool once to seal process duct 21, after sealing, unclamp sealing tool, take off snap joint 31, require process duct 21 without obviously revealing; Then from the openend of process duct 21, by glue injection device 32, pour into 0.1~0.3ml anaerobic type structure glue, glue should go deep into 6~8mm in the mouth of pipe, and guaranteeing has enough glues to adhere on secondary sealing width; Finally, after encapsulating, in 1 minute, with above-mentioned sealing tool, process duct 21 is carried out to secondary sealing, when range estimation mouth of pipe place is without clear gap after sealing, adopt electronic leak detector leak detection.
Known by foregoing description, when adopting above-mentioned sealing tool to carry out sealing operation to process duct 21, in process duct 21, will there are at least two sealing plastic zones 211, and there is Transition Zone of Deformation 212 between adjacent two sealing plastic zones 211.Obviously, than the content of introducing in background technology, the sealing tool that the utility model provides makes to have in process duct sealing 211He Transition Zone of Deformation, plastic zone 212, this Transition Zone of Deformation 212 can provide buffering for stress, and then relieve stresses concentration phenomenon, prevent that the position of sealing 211 both sides, plastic zone from forming stress coincidence district simultaneously, thereby reduce the probability that occurs crackle in process duct 21, what alleviate that process duct 21 occurs splits leakage phenomenon, with this, improve the intensity of process duct 21 sealing parts, improve its sealing reliability, Improving The Quality of Products.
For above-mentioned technique effect, also can calculate and verify by formula, specific as follows:
If exist a power to make process duct 21 fractures, must there is a limit stress, i.e. the second strength theory: no matter material is in which kind of stress state, as long as there is brittle fracture, be all the elongation at rupture strain numerical value while reaching simple extension due to the maximum stretching strain in infinitesimal face (line distortion);
When the sealing part of process duct 21 is cutting edge structure, at the sharp corner of cutting edge structure, get infinitesimal oblique section, according to two, to state stress analysis analytic method formula, obtain, the maximum stress on this infinitesimal oblique section is:
σ max = σ x + σ y 2 + 1 2 ( σ x - σ y ) 2 + 4 τ xy 2
The area of supposing infinitesimal oblique section is S 0, bring above formula into and obtain:
σ max = F / s 0 + F / s 0 2 + 1 2 ( F / s 0 - F / s 0 ) 2 + 4 ( F / s 0 ) 2
σ max=2F/S 0
When the sealing tool that adopts the utility model embodiment to provide seals, on 212Chu oblique section, Transition Zone of Deformation, get infinitesimal oblique section, according to two, to state stress analysis analytic method formula, obtain, the maximum stress on this infinitesimal oblique section is:
σ max = σ x + σ y 2 + 1 2 ( σ x - σ y ) 2 + 4 τ xy 2
The area of supposing infinitesimal oblique section is S 1, bring above formula into and obtain
σ max = F / s 1 + F / s 1 2 + 1 2 ( F / s 1 - F / s 1 ) 2 + 4 ( F / s 1 ) 2
σ max=2F/S 1
Known by above-mentioned analysis: in the situation that applying same tensile force f or pressure F, in the structure that the sealing tool that cutting edge structure and the utility model embodiment provide forms, the maximum stress of area of stress concentration is respectively 2F/S 0and 2F/S 1, and S 0< S 1
Thereby draw:
2F/S 0>2F/S 1
Visible, the sealing tool that the utility model embodiment provides makes the sealing part middle part of process duct 21 increase Transition Zone of Deformation 212, stress can be cushioned in this Transition Zone of Deformation 212, be conducive to the dispersion of stress, stress surface is increased, thereby reduce the maximum stress of area of stress concentration, reach and alleviate the object of splitting leakage phenomenon that process duct 21 occurs.
In order further to strengthen above-mentioned technique effect, in the sealing tool that the utility model embodiment provides, the first mouth-sealed portion and the second mouth-sealed portion include two or more sealing protuberances 12, and have depression 13 between adjacent two sealing protuberances 12.This scheme makes the relative both sides of process duct 21 after sealing, all has larger stress surface, makes the more difficult stress concentration phenomenon that occurs in process duct 21.
In preferred technical scheme, the sealing height of above-mentioned the first mouth-sealed portion equates with the sealing height of the second mouth-sealed portion.This sealing height refers to the root and the distance of sealing between protuberance 12 ends of sealing protuberance 12, seals after protuberance 12 acts in process duct 21 degree of depth that process duct 21 can be sagging.During concrete enforcement, the sealing height of the sealing height of the first mouth-sealed portion and the second mouth-sealed portion can be unequal, and now the sagging degree of depth of the relative both sides of process duct 21 is different, and the distortion of process duct 21 1 sides is greater than opposite side.In the utility model embodiment, the sealing height of the first mouth-sealed portion equates with the sealing height of the second mouth-sealed portion, makes the distortion of process duct 21 both sides substantially equal, thereby the homogeneous state of stress better further reduces process duct 21 and occurs splitting the probability that leaks phenomenon.
In specific implementation process, further reduce process duct 21 and occur splitting the probability that leaks phenomenon, also can realize by following manner: the working face area of each sealing protuberance 12 of the first mouth-sealed portion equates with the working face area of each sealing protuberance 12 of the second mouth-sealed portion.Thus, after the first mouth-sealed portion and the second mouth-sealed portion are close, both profiles can overlap substantially, and the distortion of process duct 21 will be comparatively symmetrical, even, and its probability that splits leakage phenomenon is less.
The working face of above-mentioned sealing protuberance 12, seals protuberance 12 and the face that process duct 21 acts on mutually, can be cambered surface, also can be irregular curved surface.The working face of the utility model embodiment sealing protuberance 12 is set to plane, and the rotational plane of this plane and mould is perpendicular, and the rotational plane of mould is the first mouth-sealed portion when close formed plane relative to the second mouth-sealed portion.Now, after the first mouth-sealed portion and the second mouth-sealed portion are close, both working faces are substantially parallel, and the basic Axis Extension along process duct 21.Now, the shape of process duct 21 after sealing is as shown in Fig. 8-10, and the distortion of process duct 21 will more symmetrical, even, and its probability that splits leakage phenomenon reduces by a larger margin.
Parameters for the sealing protuberance 12 in above-mentioned sealing tool can be according to actual condition and Location of requirement, the utility model embodiment provides a kind of comparatively preferred parameter area, particularly: the length range of the length range of the first mouth-sealed portion and the second mouth-sealed portion is that the length range of the 167%~233%, first mouth-sealed portion and the length range of the second mouth-sealed portion of process duct diameter is reflected in the sealing moulding total length that is process duct 21 in process duct 21; The face length of sealing protuberance 12 is 50%~83.3% of process duct diameter, and the face length of this sealing protuberance 12 is reflected in the length of the sealing plastic zone 211 that is process duct 21 in process duct 21; The length of the depression 13 of adjacent two sealings between protuberances 12 are 50%~83.3% of process duct diameter, and 13 the length of caving in is reflected in the length of the Transition Zone of Deformation 212 that is process duct 21 in process duct 21.The process duct 21 that the diameter of take is Φ 6 is example, and its sealing moulding total length is 10~14mm approximately, the sealing plastic zone 211 of each 3~5mm of both sides, and there is the Transition Zone of Deformation 212 of 3~5mm centre.Above-mentioned length is with the axis direction definition of process duct 21.
The process duct 21 that the utility model embodiment provides adopts the described sealing tool sealing of above-mentioned arbitrary scheme moulding, because above-mentioned sealing tool has above-mentioned technique effect, adopt the process duct 21 of this sealing tool sealing moulding also should there is corresponding technique effect, repeat no more herein.
The utility model embodiment preferably provides a kind of process duct 21, and this process duct 21 comprises sealing pipeline section and the pipeline section except sealing pipeline section.Above-mentioned sealing pipeline section comprises two sealing plastic zones 211 and the Transition Zone of Deformation 212 between two sealing plastic zones 211, the surface of sealing plastic zone 211 is plane, this plane is parallel with the axis of process duct 21, the surface of Transition Zone of Deformation 212 is the cambered surface to the outside depression of sealing pipeline section, and sealing 211He Transition Zone of Deformation, plastic zone 212 is the median plane symmetrical structure about process duct 21.The median plane of process duct 21 is the plane at its diametric(al) place.
The air-conditioner that the utility model embodiment provides comprises process duct 21, and this process duct 21 is above-mentioned process duct 21, because this process duct 21 has above-mentioned technique effect, comprises that the air-conditioner of this process duct 21 also should have corresponding technique effect, repeats no more herein.
In this description, each embodiment adopts the mode of going forward one by one to describe, and each embodiment stresses is the difference with other embodiment, between each embodiment identical similar part mutually referring to.
Above-mentioned explanation to the disclosed embodiments, makes professional and technical personnel in the field can realize or use the utility model.To the multiple modification of these embodiment, will be apparent for those skilled in the art, General Principle as defined herein can, in the situation that not departing from spirit or scope of the present utility model, realize in other embodiments.Therefore, the utility model will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (11)

1. the sealing tool of a process duct, comprise mould, described mould comprises first mould with the first mouth-sealed portion, and second mould with the second mouth-sealed portion, described the first mouth-sealed portion and described the second mouth-sealed portion are oppositely arranged, it is characterized in that, at least one in described the first mouth-sealed portion and described the second mouth-sealed portion comprises two or more sealing protuberances, between adjacent two described sealing protuberances, has depression.
2. sealing tool according to claim 1, is characterized in that, described the first mouth-sealed portion and described the second mouth-sealed portion include two or more sealing protuberances.
3. sealing tool according to claim 2, is characterized in that, the sealing height of described the first mouth-sealed portion equates with the sealing height of described the second mouth-sealed portion.
4. sealing tool according to claim 1, is characterized in that, the working face area that seals protuberance described in each of described the first mouth-sealed portion equates with the working face area that seals protuberance described in each of described the second mouth-sealed portion.
5. sealing tool according to claim 1, is characterized in that, the working face of described sealing protuberance is plane, and the rotational plane of described plane and described mould is perpendicular.
6. according to the sealing tool described in any one in claim 1-5, it is characterized in that, the length range of the length range of described the first mouth-sealed portion and described the second mouth-sealed portion is 167%~233% of process duct diameter.
7. according to the sealing tool described in any one in claim 1-5, it is characterized in that, the face length of described sealing protuberance is 50%~83.3% of process duct diameter.
8. according to the sealing tool described in any one in claim 1-5, it is characterized in that, the length of the described depression between adjacent two described sealing protuberances is 50%~83.3% of process duct diameter.
9. a process duct, is characterized in that, this process duct adopts the sealing tool sealing moulding as described in any one in claim 1-8.
10. a process duct, comprise sealing pipeline section, it is characterized in that, described sealing pipeline section comprises two sealing plastic zones and the Transition Zone of Deformation between two described sealing plastic zones, the surface of described sealing plastic zone is plane, described plane is parallel with the axis of described process duct, and the surface of described Transition Zone of Deformation is the cambered surface to the outside depression of described sealing pipeline section, and described sealing plastic zone and described Transition Zone of Deformation are the median plane symmetrical structure about described process duct.
11. 1 kinds of air-conditioners, comprise process duct, it is characterized in that, described process duct is the process duct as described in claim 9 or 10.
CN201320592187.XU 2013-09-24 2013-09-24 Sealing tool of process pipe, process pipe and air conditioner Expired - Fee Related CN203470675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320592187.XU CN203470675U (en) 2013-09-24 2013-09-24 Sealing tool of process pipe, process pipe and air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320592187.XU CN203470675U (en) 2013-09-24 2013-09-24 Sealing tool of process pipe, process pipe and air conditioner

Publications (1)

Publication Number Publication Date
CN203470675U true CN203470675U (en) 2014-03-12

Family

ID=50219088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320592187.XU Expired - Fee Related CN203470675U (en) 2013-09-24 2013-09-24 Sealing tool of process pipe, process pipe and air conditioner

Country Status (1)

Country Link
CN (1) CN203470675U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104139120A (en) * 2014-07-01 2014-11-12 广东志高空调有限公司 Sealing method for punching injection process pipe of air conditioner with flammable refrigerant
CN104438822A (en) * 2013-09-24 2015-03-25 珠海格力电器股份有限公司 Sealing tool of process pipe, process pipe and air conditioner
CN106102190A (en) * 2016-06-16 2016-11-09 靖江先锋半导体科技有限公司 A kind of heater wiring process for filling colloid

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104438822A (en) * 2013-09-24 2015-03-25 珠海格力电器股份有限公司 Sealing tool of process pipe, process pipe and air conditioner
CN104139120A (en) * 2014-07-01 2014-11-12 广东志高空调有限公司 Sealing method for punching injection process pipe of air conditioner with flammable refrigerant
CN106102190A (en) * 2016-06-16 2016-11-09 靖江先锋半导体科技有限公司 A kind of heater wiring process for filling colloid

Similar Documents

Publication Publication Date Title
CN203470675U (en) Sealing tool of process pipe, process pipe and air conditioner
CN204064200U (en) Detection tool
CN110410592B (en) Spherical ink pipe fitting
CN104438822A (en) Sealing tool of process pipe, process pipe and air conditioner
CN104723853B (en) The guide groove design of Sealing Structure method acted on based on lip and glass double sided contacts
CN205780831U (en) A kind of protection cap
CN204179341U (en) With the electronic installation of seal nipple
CN104613176A (en) Self-pressurization sealing ring
CN205207957U (en) Improve gas bellows that detects security
CN203823281U (en) Steel pipe sealing flange assembly
CN203484548U (en) Sealing device for pipe fitting
CN202691420U (en) Plastic pipe connection structure
CN206513660U (en) Male and female press strip
CN208586750U (en) A kind of I-shaped anti-deformation profile
CN201900737U (en) Liquid bag die
CN204257918U (en) Seal nipple assembly
CN205085580U (en) Wave guide welding clamping location frock
CN204243327U (en) Mobile phone seal nipple
CN206919912U (en) A kind of novel electron throttle sensor
CN204624027U (en) A kind of wrapping machine and envelope cutter backplate thereof
CN204004934U (en) A kind of soft or hard composite seal device
CN205047889U (en) Meet air bleeding ball valve soon
CN215110472U (en) Component for low-pressure or micro-pressure sealing
CN104121439A (en) Soft-hard combined sealing device
CN103672241A (en) Pipe flange

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312

Termination date: 20210924

CF01 Termination of patent right due to non-payment of annual fee