CN203464265U - Supporting structure for preventing circulating fluidized bed boiler center cylinder from falling off - Google Patents

Supporting structure for preventing circulating fluidized bed boiler center cylinder from falling off Download PDF

Info

Publication number
CN203464265U
CN203464265U CN201320549938.XU CN201320549938U CN203464265U CN 203464265 U CN203464265 U CN 203464265U CN 201320549938 U CN201320549938 U CN 201320549938U CN 203464265 U CN203464265 U CN 203464265U
Authority
CN
China
Prior art keywords
center cylinder
central tube
wall
supporting structure
bed boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320549938.XU
Other languages
Chinese (zh)
Inventor
秦卫东
谭浩艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Huaguang Boiler Co Ltd
Original Assignee
Wuxi Huaguang Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Huaguang Boiler Co Ltd filed Critical Wuxi Huaguang Boiler Co Ltd
Priority to CN201320549938.XU priority Critical patent/CN203464265U/en
Application granted granted Critical
Publication of CN203464265U publication Critical patent/CN203464265U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

The utility model provides a supporting structure for preventing a circulating fluidized bed boiler center cylinder from falling off, which has the advantages that a center cylinder can be firmly installed in a cyclone separator and cannot fall off, and the long-term running of the boiler is ensured. The technical scheme is that the supporting structure for preventing the circulating fluidized bed boiler center cylinder from falling off comprises a center cylinder and a separator top plate. The supporting structure for preventing the circulating fluidized bed boiler center cylinder from falling off is characterized in that fireproof material layers are arranged above and below the separator top plate; the upper part of the center cylinder penetrates into the fireproof material layers; an expansion clearance is reserved between the outer wall of the upper part of the center cylinder and the fireproof material layers; supports are uniformly distributed on the outer wall of the circumferential surface of the upper part of the center cylinder; bottom horizontal plates of the supports are supported to the upper end surface of the separator top plate, and are provided with long slotted holes which are configured along the expansion direction of the outer wall of the center cylinder; the supports are positioned in corresponding installation cavity bodies of the fireproof material layers.

Description

A kind of supporting structure for preventing that central cylinder of circulating fluid-bed boiler from coming off
Technical field
The utility model relates to the technical field of boiler structure, is specially a kind of supporting structure for preventing that central cylinder of circulating fluid-bed boiler from coming off.
Background technology
Circulating fluidized-bed boiler Combustion technology is a coal combustion technology growing up over nearly 20 years.It has that fuel tolerance is wide, efficiency of combustion is high, discharged nitrous oxides is low, load regulation rate is large and the outstanding advantages such as Load Regulation is fast.Cyclone separator is the vitals of CFBB, Main Function is that the most flying dusts in flue gas are separated by material-returning device and return to burner hearth circulating combustion, wherein the central tube of cyclone separator has played very important effect, is the core of cyclone separator.But the running temperature of central tube is very high, conventionally between 900-1000 ℃, traditional fixed form comprises with pull bar fixes or hangs with boatswain chair, because temperature is high, central tube is exposed to again in flue gas, traditional is often hung mode or causes blowing out because thermal expansion inequality causes pull bar to break to cause central tube to come off, or boatswain chair due to for a long time under the condition of high temperature intensity decline and causing fracture to cause central tube to come off to cause blowing out, have a strong impact on the long-term stability operation of boiler.
Summary of the invention
For the problems referred to above, the utility model provides a kind of supporting structure for preventing that central cylinder of circulating fluid-bed boiler from coming off, and it makes central tube can be installed on securely cyclone separator inside, can not come off, and guarantees the long-term stability operation of boiler.
A kind of supporting structure for preventing that central cylinder of circulating fluid-bed boiler from coming off, its technical scheme is such: it comprises central tube, separator top board, it is characterized in that: the top of described separator top board, below is provided with refractory masses, described refractory masses is goed deep on the top of described central tube, the external wall of upper portion of described central tube and described refractory material interlayer leave expansion clearance, the top periphery outer wall of described central tube is evenly equipped with support, the bottom horizontal plate of described support is supported on the upper surface of described separator top board, on the bottom horizontal plate of described support, have long slot bore, described long slot bore is arranged along the expansion direction of central tube outer wall, described support is positioned at the correspondence of described refractory masses cavity is installed, the limited block arranging on described separator top board is positioned at described long slot bore, the top circumference face outer wall of described central tube is provided with sealing plate, it is inner that described refractory masses is goed deep in the outside of described sealing plate.
Adopt after structure of the present utility model, top due to separator top board, below is provided with refractory masses, described refractory masses is goed deep on the top of described central tube, the external wall of upper portion of described central tube and described refractory material interlayer leave expansion clearance, the top periphery outer wall of described central tube is evenly equipped with support, the bottom horizontal plate of described support is supported on the upper surface of described separator top board, on the bottom horizontal plate of described support, have long slot bore, described long slot bore is arranged along the expansion direction of central tube outer wall, the limited block arranging on described separator top board is positioned at described long slot bore, its expansion that guarantees central tube is even, and because the top circumference face outer wall of central tube is provided with sealing plate, it is inner that described refractory masses is goed deep in the outside of described sealing plate, it can prevent flue gas short circuit, the correspondence that is positioned at refractory masses due to support is installed cavity, support can be not for a long time under the condition of high temperature and then guarantee the intensity of support, it makes central tube can be installed on securely cyclone separator inside, can not come off, guarantee the long-term stability operation of boiler.
Accompanying drawing explanation
Fig. 1 is front view structural representation of the present utility model;
Fig. 2 is that the A-A of Fig. 1 is to view structure schematic diagram (removing refractory masses).
The specific embodiment
See Fig. 1, Fig. 2, it comprises central tube 1, separator top board 2, the top of described separator top board 2, below is provided with refractory masses 3, described refractory masses 3 is goed deep on the top of described central tube 1, 3 of the external wall of upper portion of described central tube 1 and described refractory masses leave expansion clearance L, the top periphery outer wall of described central tube 1 is evenly equipped with support 4, the bottom horizontal plate of described support 4 is supported on the upper surface of described separator top board 2, on the bottom horizontal plate of described support 4, have long slot bore 5, described long slot bore 5 is arranged along the expansion direction of central tube 1 outer wall, described support 4 is positioned at the correspondence of described refractory masses 3 cavity is installed, the limited block 6 arranging on described separator top board 2 is positioned at described long slot bore 5, the top circumference face outer wall of described central tube 1 is provided with sealing plate 7, described refractory masses 3 inside are goed deep in the outside of described sealing plate 7.

Claims (1)

1. the supporting structure for preventing that central cylinder of circulating fluid-bed boiler from coming off, it comprises central tube, separator top board, it is characterized in that: the top of described separator top board, below is provided with refractory masses, described refractory masses is goed deep on the top of described central tube, the external wall of upper portion of described central tube and described refractory material interlayer leave expansion clearance, the top periphery outer wall of described central tube is evenly equipped with support, the bottom horizontal plate of described support is supported on the upper surface of described separator top board, on the bottom horizontal plate of described support, have long slot bore, described long slot bore is arranged along the expansion direction of central tube outer wall, described support is positioned at the correspondence of described refractory masses cavity is installed, the limited block arranging on described separator top board is positioned at described long slot bore, the top circumference face outer wall of described central tube is provided with sealing plate, it is inner that described refractory masses is goed deep in the outside of described sealing plate.
CN201320549938.XU 2013-09-05 2013-09-05 Supporting structure for preventing circulating fluidized bed boiler center cylinder from falling off Withdrawn - After Issue CN203464265U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320549938.XU CN203464265U (en) 2013-09-05 2013-09-05 Supporting structure for preventing circulating fluidized bed boiler center cylinder from falling off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320549938.XU CN203464265U (en) 2013-09-05 2013-09-05 Supporting structure for preventing circulating fluidized bed boiler center cylinder from falling off

Publications (1)

Publication Number Publication Date
CN203464265U true CN203464265U (en) 2014-03-05

Family

ID=50176629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320549938.XU Withdrawn - After Issue CN203464265U (en) 2013-09-05 2013-09-05 Supporting structure for preventing circulating fluidized bed boiler center cylinder from falling off

Country Status (1)

Country Link
CN (1) CN203464265U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103471092A (en) * 2013-09-05 2013-12-25 无锡华光锅炉股份有限公司 Supporting structure used for preventing circulating fluidized bed boiler center cylinder from falling off

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103471092A (en) * 2013-09-05 2013-12-25 无锡华光锅炉股份有限公司 Supporting structure used for preventing circulating fluidized bed boiler center cylinder from falling off
CN103471092B (en) * 2013-09-05 2015-07-15 无锡华光锅炉股份有限公司 Supporting structure used for preventing circulating fluidized bed boiler center cylinder from falling off

Similar Documents

Publication Publication Date Title
CN103471092B (en) Supporting structure used for preventing circulating fluidized bed boiler center cylinder from falling off
CN203464265U (en) Supporting structure for preventing circulating fluidized bed boiler center cylinder from falling off
CN204026702U (en) A kind of spiral fire grate
CN201787586U (en) Fixed grate steam blowing device
CN104456505A (en) Low-concentration coal-bed methane or methane gas steam boiler
CN203048767U (en) Kiln chamber residual heat recovery device
CN204254601U (en) A kind of pilot boiler
CN204165027U (en) Crane system is propped up in a kind of boiler wall of variable cross-section tower boiler
CN210030564U (en) Inner ring wall supporting structure of dry quenching furnace
CN208332245U (en) A kind of central tube for cyclone separator of circulating fluidized bed boiler
CN109578995A (en) A kind of cyclone separator arrangement in boiler
CN203336565U (en) Light boiler wall of oil field steam-injection boiler
CN202598580U (en) Interchangeable arch of biomass and coal
CN206347571U (en) A kind of suspension-type infrared burner
CN204201910U (en) A kind of spiral fire grate
CN203112771U (en) Gas blowby prevention sealing structure of gasification furnace
CN106152138B (en) A kind of burner fire lid
CN203940421U (en) Coal economizer of circulating fluidized bed boiler furnace wall
CN204534537U (en) Integral type economizes coal dust arrester
CN205208016U (en) Nonmetal expansion joint
CN204963176U (en) Energy -conserving heat energy replacer of three -phase
CN103322585A (en) Light boiler wall of steam-injection boiler for oil field
CN204404167U (en) The Novel hearth generator of combustor
CN206094048U (en) A adiabatic furnace of bearing structure for CFB flue gas emergence equipment
CN203653594U (en) Large-scale high-blast-temperature ball-type hot blast furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140305

Effective date of abandoning: 20150715

AV01 Patent right actively abandoned

Granted publication date: 20140305

Effective date of abandoning: 20150715

RGAV Abandon patent right to avoid regrant