- CN203462459U CN203462459U CN201320438414.3U CN201320438414U CN203462459U CN 203462459 U CN203462459 U CN 203462459U CN 201320438414 U CN201320438414 U CN 201320438414U CN 203462459 U CN203462459 U CN 203462459U
- Authority
- CN
- China
- Prior art keywords
- type framework
- floral
- composite component
- tube type
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
A half-floral-tube type reinforcement and drainage composite component comprises a half-floral-tube type framework (1), graded sand and stones (2) are filled in the half-floral-tube type framework (1), a geotextile water filtration layer (3) covers the outer wall of the half-floral-tube type framework (1), and water seepage holes (4) are formed in the half-floral-tube type framework (1). The composite component has the advantages that the structural style and the manufacture process are simple, the operability is high, the manufacture cost is low, and the quality reliability is high; the applicable range is wide, and the composite component is applicable to both the soft foundation and the roadbed in the low-gravity-stress environment and the high and steep fill side slope and the tailing fill dam in the high-gravity-stress environment; the timeliness is high, the initial local stability during filling or stacking of fill bodies can be improved, and the whole stability of the fill bodies during the long-term operation can be improved.
Description
Technical field
The utility model relates to high steep embankment side slope and fills and tailing dam damming works technical field, and a kind of reinforcement that has concurrently oozes half floral tube formula composite component of two kinds of functions with row specifically.
Background technology
Under Persistent Heavy Rain effect, the soil body in side slope certain depth is by saturated softening, and soil shear strength reduces, and the seepage effect of underground water has also increased the sliding force of side slope simultaneously, and then causes slope stability sharply to decline.At tailing dam, building a dam in process, is the main cause that causes fill dam unstability because draining in time causes phreatic line rising in dam body.As can be seen here, at high gradient slope, filling and tailing dam is built a dam in process, how effectively to organize draining reduce in the body of slope phreatic line and how to lay the physical and mechanical property that reinforcement material strengthens filling body, is the key that class slope stability is filled in raising.
The patented product at present draining and reinforced action being combined mainly comprises two classes, and a class is to optimize conventional band drain structure, at band drain outside or inner reinforcement, makes band drain play reinforced action; Another kind of is that band drain is placed in geo-grid, thereby reaches draining and two kinds of effects of reinforcement.Above-mentioned two class patented products are mainly applicable to the little soft base of general buried depth and little roadbed and the embankment side slope of filled height, for filled height larger embankment side slope and tailing dam, because plastic draining board self compressive strength is lower, easy deformation failure under higher selfweight stress effect, stop up drainage channel, lose drainability.Plastic draining board and reinforcing body (geo-grid) are difficult to form an organic whole in manufacture craft simultaneously, have both been not easy to large-scale production, while operation, complex process, and cost is high, and reliability is poor.
Summary of the invention
The purpose of this utility model is a kind of half floral tube formula composite component that has draining and two kinds of functions of reinforcement concurrently of design, can, under high selfweight stress ambient conditions, reach the function of reinforcement and long-term draining.Specifically make filling body fill or banking process initial stage quick-discharging consolidation, by row, ooze reinforcement and improve filling body physical and mechanical property, in later stage operation process, by long-term row, ooze simultaneously, guarantee that filling body underground water in heavy rain state or tailings discharging process mesoslope body can discharge in time, make phreatic line lower than designing requirement.
A kind of half floral tube formula reinforcement row of the utility model is oozed composite component, comprising: half flower tube-type framework, and graded sand and stone is filled in half flower tube-type framework, and geotextile drainage layer is wrapped in half flower tube-type framework outer wall, on half flower tube-type framework, is provided with water seepage hole.
Described half flower tube-type framework, adopt that fiber-reinforced plastic, steel are moulded, polypropylene, high density polyethylene (HDPE) or other every linear meter(lin.m.) hot strength >=15kN, the high-strength polymer fiber of hot strength elongation rate≤15% is made one section of external diameter 10cm by extruding, stretching, internal diameter 8cm, the pipeline of wall thickness 1cm, is mainly used in realizing reinforcement and skeleton function is oozed in the row of formation.
Described graded sand and stone, is filled in half fancy pipeline after adopting ratio that higher gravelly sand, coarse sand and the medium sand of transmission coefficient is 60:30:10 according to percentage to be made into, and is mainly used in the row of realization and oozes the function that skeleton is oozed in gallery and the row of support.
Described geotextile drainage layer, is around around one week geotextile, to make at half flower tube-type framework, and lap-joint connects closely by bonding or colligation, be used for the row of realization and ooze filtering function, to prevent that fine grained from passing through half floral tube water seepage hole and infiltrating, stop up drainage channel, reach the permeable effect of filter residue.
Described water seepage hole be within the scope of half flower tube-type framework first half φ=161 ° by eyelet longitudinal pitch 3cm, laterally angle is the eyelet that the aperture that 23 ° of quincuncial pile types are arranged is 1cm.
The advantage that a kind of half floral tube formula reinforcement row of the utility model is oozed composite component is: form of structure and manufacture craft are simple, workable, cheap, and reliability is high; Applied widely, be both applicable to soft base and roadbed under low selfweight stress environment, be also applicable to the steep embankment side slope of height and tailing dam under high selfweight stress environment; Ageing strong, can solve filling body filling or the local stability at banking process initial stage, can solve again the resistance to overturning of filling body in long-term operation process.
Accompanying drawing explanation
Fig. 1 is the plane structure chart that a kind of half floral tube formula reinforcement row is oozed composite component.
Fig. 2 is the cross-sectional drawing that a kind of half floral tube formula reinforcement row is oozed composite component.
In figure: 1-half flower tube-type framework, 2-graded sand and stone, 3-geotextile drainage layer, 4-water seepage hole, φ-floral tube punching section angle.
The specific embodiment
Shown in root Ju Fig. 1, Fig. 2: a kind of half floral tube formula reinforcement row is oozed composite component, comprise: half flower tube-type framework, graded sand and stone is filled in half flower tube-type framework, and geotextile drainage layer is wrapped in half flower tube-type framework outer wall, on half flower tube-type framework, is provided with water seepage hole.
First described half flower tube-type framework 1 adopts that fiber-reinforced plastic, steel are moulded, polypropylene, high density polyethylene (HDPE) or other high-strength polymer fiber are made one section of external diameter 10cm by extruding, stretching, internal diameter 8cm, the pipeline of wall thickness 1cm, the every linear meter(lin.m.) hot strength >=15kN of half flower tube-type framework 1, hot strength elongation rate≤15%.
Described graded sand and stone 2 adopts gravelly sand, coarse sand and medium sand that transmission coefficients are higher by 60:30:10(percentage) be made into, maximum particle diameter is not more than 5mm, is placed in half fancy pipeline, and graded sand and stone 2 compactnesss should be not less than 0.92.
Described geotextile drainage layer 3 can adopt PET16-6-500 type geotextiles to wrap up one week around half flower tube-type framework 1, transverse lap length is not less than 15cm, longitudinal lap joint length is not less than 30cm, and bonding tight, prevent that fine grained from passing through water seepage hole 4 and infiltrating, stop up drainage channel, reach the permeable effect of filter residue, the vertical transmission coefficient of geotextile drainage layer 3 should be not less than 1 * 10
-2cm/s.
Described water seepage hole 4 be within the scope of half flower tube-type framework 1 first half φ=161 ° by eyelet longitudinal pitch 3cm, laterally angle is the eyelet that the aperture that 23 ° of quincuncial pile types are arranged is 1cm.
Claims (4)
1. one and half floral tube formula reinforcement rows are oozed composite component, it is characterized in that: comprising: half flower tube-type framework (1), graded sand and stone (2) is filled in half flower tube-type framework (1), geotextile drainage layer (3) is wrapped in half flower tube-type framework (1) outer wall, on half flower tube-type framework (1), is provided with water seepage hole (4).
2. a kind of half floral tube formula reinforcement row according to claim 1 is oozed composite component, it is characterized in that: described half flower tube-type framework (1) in order to adopt, mould by fiber-reinforced plastic, steel, polypropylene, high density polyethylene (HDPE) or other every linear meter(lin.m.) hot strength >=15kN, the high-strength polymer fiber of hot strength elongation rate≤15% is by extruding, stretch the one section of external diameter 10cm making, internal diameter 8cm, the pipeline of wall thickness 1cm.
3. a kind of half floral tube formula reinforcement row according to claim 1 is oozed composite component, it is characterized in that: described geotextile drainage layer (3), around around one week PET16-6-500 type geotextiles geotextile, to make at half flower tube-type framework (1), lap-joint connects closely, transverse lap length is not less than 15cm, longitudinal lap joint length is not less than 30cm, can adopt bonding connection, colligation to connect.
4. a kind of half floral tube formula reinforcement row according to claim 1 is oozed composite component, it is characterized in that: described water seepage hole (4) be within the scope of half flower tube-type framework (1) first half φ=161 ° by eyelet longitudinal pitch 3cm, laterally angle is the eyelet that the aperture that 23 ° of quincuncial pile types are arranged is 1cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320438414.3U CN203462459U (en) | 2013-07-23 | 2013-07-23 | Half-floral-tube type reinforcement and drainage composite component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320438414.3U CN203462459U (en) | 2013-07-23 | 2013-07-23 | Half-floral-tube type reinforcement and drainage composite component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203462459U true CN203462459U (en) | 2014-03-05 |
Family
ID=50174832
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320438414.3U Expired - Lifetime CN203462459U (en) | 2013-07-23 | 2013-07-23 | Half-floral-tube type reinforcement and drainage composite component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203462459U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153548A (en) * | 2014-07-22 | 2014-11-19 | 苏州金螳螂建筑装饰股份有限公司 | Water-permeable device of base layer of rock material |
CN104389304A (en) * | 2014-11-25 | 2015-03-04 | 河海大学 | Air drying drainage body without pre-pressing effect and construction method thereof |
CN107780406A (en) * | 2017-09-15 | 2018-03-09 | 浙江申诚环境工程有限公司 | Treatment of soft foundation vacuum preloading construction scheme and drainpipe |
CN108590752A (en) * | 2018-01-09 | 2018-09-28 | 中交路桥建设有限公司 | Draining repair system and its construction method after a kind of underdrain formula tunnel-liner |
-
2013
- 2013-07-23 CN CN201320438414.3U patent/CN203462459U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153548A (en) * | 2014-07-22 | 2014-11-19 | 苏州金螳螂建筑装饰股份有限公司 | Water-permeable device of base layer of rock material |
CN104153548B (en) * | 2014-07-22 | 2017-08-25 | 苏州金螳螂建筑装饰股份有限公司 | Stone material basic unit water permeable device |
CN104389304A (en) * | 2014-11-25 | 2015-03-04 | 河海大学 | Air drying drainage body without pre-pressing effect and construction method thereof |
CN107780406A (en) * | 2017-09-15 | 2018-03-09 | 浙江申诚环境工程有限公司 | Treatment of soft foundation vacuum preloading construction scheme and drainpipe |
CN107780406B (en) * | 2017-09-15 | 2019-07-26 | 浙江申诚环境工程有限公司 | Treatment of soft foundation vacuum preloading construction scheme and drainpipe |
CN108590752A (en) * | 2018-01-09 | 2018-09-28 | 中交路桥建设有限公司 | Draining repair system and its construction method after a kind of underdrain formula tunnel-liner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203462459U (en) | Half-floral-tube type reinforcement and drainage composite component | |
CN203855974U (en) | Three-dimensional-drainage flexible geocell eco-bag side slope | |
CN103952986A (en) | Load-shedding type rigid culvert structure | |
CN103711116B (en) | A kind of environment-friendly type vertical drainage body being applicable to high sticky content new hydraulically filled sludge ground | |
CN102359096A (en) | Method for strengthening deep soft soil foundation by sealing | |
CN202969393U (en) | Ribbing load reduction structure of road high hill culvert | |
CN104005404A (en) | Prestressed pipe pile coated with active material pile body and construction method | |
CN105155517B (en) | Drilling extruding pressure-bearing type bellows branch pile construction method | |
CN205636721U (en) | Strain equipment that well vacuum preloading consolidated deep soft soil foundation | |
CN103437336A (en) | PVC hole-pipe gravel pile and soft foundation processing method thereof | |
CN104878739A (en) | Drainage material assembly capable of being transversely connected with plastic drainage boards and method for constructing drainage material assembly | |
CN203855973U (en) | Ribbed-box type reinforced seepage-eliminating composite component | |
CN204959737U (en) | Stake of drilling extrusion pressure -bearing type bag formula branch | |
CN104060601B (en) | The construction method of utilizing precast construction stake pile foundation to carry out ground processing | |
CN105002916A (en) | Immerseable embankment high slope interlocked ecological brick flexible protection structure and construction method | |
CN203452062U (en) | Groove type reinforcement and drainage composite member | |
CN104846809A (en) | Prefabricated tubular pile capable of draining water and increasing frictional resistance and construction method thereof | |
CN103074886B (en) | Grouted geogrid | |
CN103498446A (en) | Rib-free box type reinforcing and seepage discharging composite component | |
CN202543949U (en) | Drainage geogrid | |
CN201785748U (en) | Novel high-efficient anti plastics drain bar of buckling | |
CN203808044U (en) | Round-hole rectangular reinforcing drainage composite component | |
CN202543884U (en) | Composite reinforced water drainage type geogrid | |
CN203096710U (en) | Grouting type geogrid | |
CN103821164B (en) | Mountain area cheuch backfill tunnel construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140305 |
|
CX01 | Expiry of patent term |