CN203458973U - Spray pipe device - Google Patents

Spray pipe device Download PDF

Info

Publication number
CN203458973U
CN203458973U CN201320559523.0U CN201320559523U CN203458973U CN 203458973 U CN203458973 U CN 203458973U CN 201320559523 U CN201320559523 U CN 201320559523U CN 203458973 U CN203458973 U CN 203458973U
Authority
CN
China
Prior art keywords
spray
nozzle
branch pipes
nozzles
plane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320559523.0U
Other languages
Chinese (zh)
Inventor
朱全勇
李鹏
陈茂兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Power And Environment Engineering Co ltd
Original Assignee
GCL ENGINEERING Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GCL ENGINEERING Ltd filed Critical GCL ENGINEERING Ltd
Priority to CN201320559523.0U priority Critical patent/CN203458973U/en
Application granted granted Critical
Publication of CN203458973U publication Critical patent/CN203458973U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)
  • Gas Separation By Absorption (AREA)

Abstract

The utility model discloses a spray pipe device comprising a spray main pipe, spray branch pipes, nozzle short pipes and nozzles, wherein the spray branch pipes are connected on the spray main pipe; and the nozzles are connected at tail ends of the nozzle short pipes and uniformly distributed in the spray plane. The device is characterized in that spray small branch pipes of equal height are respectively connected at lower ends of the spray branch pipes; and the spray short pipes are arranged at lower ends of the spray small branch pipes. Compared with the prior art, the spray pipe device disclosed by the utility model has the advantages that the spray small branch pipes of equal height are arranged to ensure that the nozzles can be effectively guided from the plane of the spray main pipe to the plane below the spray layer supporting beam, so that the problem that the supporting beam is scoured and perforated, which frequently occurs in a desulfurization system, is avoided and in the meantime, slurry is uniformly sprayed from the nozzles which are uniformly distributed in the same plane and flue gas is uniformly absorbed; and therefore, the absorptivity of flue gas SO2 can be effectively increased and the stable and efficient operation of the desulfurization system is greatly promoted.

Description

A kind of spray pipe device
Technical field
The utility model relates to and a kind ofly for wet method fume desulfurizing system (WFGD) or a kind of can avoiding of similar field, shower brace summer is washed away and can improve flue gas SO 2the spray pipe device absorbing.
Background technology
Spray pipe device is the visual plant of absorption system in wet method fume desulfurizing system (WFGD).After the import of desulphurization system Central Plains flue gas self-absorption tower flue gas enters in absorption tower, the atomization slurry spraying downwards with spraying layer fully contacts, SO 2with the CaCO in atomization slurry 3chemical reaction occurs and by slurries, absorbed, reactant is settled down to the oxidation pond at the bottom of tower with slurries, and oxidation is discharged.
Spray pipe device comprises that spray supervisor, spray arm, nozzle connect short tube, spraying layer brace summer, nozzle.Lime stone slurry is squeezed into spray supervisor by circulating pump from oxidation pond, through spray arm, nozzle, after slurry spraying with flue gas in SO 2reaction, absorbs the SO in flue gas 2, make flue gas reach discharge standard.
System will guarantee the desulfurization degree of desulphurization system, will guarantee exactly the uniformity of arrangement of nozzles, and guarantees that the actual coverage rate of nozzle is greater than 170%.The uniformity of arrangement of nozzles refers to that between every layer of nozzle, spacing is even; The actual coverage rate of nozzle refers to the area sum at slurries 1 meter of under nozzle and the ratio of uptake zone, absorption tower area of section of conplane nozzle ejection.
The shower in known this field is furnished with two kinds at present, and a kind of is that spray arm is stretched out in spray supervisor both sides, and spray arm both sides are stretched out nozzle short tube again, connect nozzle; Spray supervisor stretches out a spray arm in both sides, and spray arm downside stretches out length different spray nozzles short tube, connects nozzle.
Because the increase of spray flux random groups increases, spray supervisor caliber increases thereupon, and the cross section of spray brace summer increases with the increase on absorption tower.Front a kind of layout, nozzle, due to the restriction of structure, cannot guarantee nozzle being evenly arranged on horizontal plane, the slurries of nozzle ejection simultaneously can wash away shower brace summer, must serve as a contrast the very high alloy of cost and prevent from washing away on shower brace summer; Rear a kind of layout is not because nozzle is or not a plane, even if nozzle is uniform, in next plane of nozzle, because the area of nozzle ejection is different, nozzle coverage rate can not reach the actual coverage rate that nozzle calculates, and spray is inhomogeneous in the vertical direction.What spray is inhomogeneous, and flue gas will be escaped in place low from spray coverage rate, that pressure is low, reduces the desulfurization degree of desulphurization system.
Summary of the invention
technical problem:technical problem to be solved in the utility model is for above-mentioned the deficiencies in the prior art, and a kind of uniform spraying layer nozzle is provided, and avoids brace summer to wash away, and improves SO in flue gas 2the spray pipe device absorbing.
technical scheme:the utility model solves the technical scheme that its technical problem adopts:
A kind of spray pipe device, comprise spray supervisor, spray arm, nozzle short tube and nozzle, described spray arm is connected on described spray supervisor, described nozzle is connected to the end of nozzle short tube and uniform in plane at spray, it is characterized in that: in described spray arm lower end, be also connected with respectively contour spray smaller branch pipe, described nozzle short tube is arranged on the lower end of described spray smaller branch pipe.
Described spray arm is connected to described spray supervisor's both sides, in described spray supervisor lower end, is also provided with spray smaller branch pipe.
Described nozzle short tube is arranged on the both sides of described spray smaller branch pipe lower end.
The utility model spray equipment, spray arm is stretched out in every layer of spraying layer spray supervisor both sides, and spray arm (supervisor) downside stretches out contour spray smaller branch pipe, and smaller branch pipe both sides are stretched out nozzle short tube again, connect nozzle.Uniform nozzle also connects by contour spray smaller branch pipe, guarantees that nozzle is even at same plane slurry spraying; Avoid the washing away of spraying layer brace summer simultaneously, eliminate system security of operation hidden danger.
beneficial effect:arranging of the utility model shower arrangement utilizing spray smaller branch pipe guided to nozzle spray supervisor, below spraying layer brace summer, solved the restriction due to structure, the inhomogeneities of the arrangement of nozzles causing.Contour smaller branch pipe has guaranteed that same spraying layer nozzle vertical direction, in same level, has effectively guaranteed the actual coverage rate of nozzle and the uniformity of nozzle ejection, avoid flue gas to escape, and the gas-liquid contact area having increased, has promoted SO 2absorption reaction, has improved SO in flue gas 2absorption efficiency.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is further illustrated.
Fig. 1 is the structural representation of existing spray equipment, and wherein nozzle is arranged with spray supervisor same plane.
Fig. 2 is existing spray equipment vertical direction nozzle ejection schematic diagram.
Fig. 3 is the top view of the utility model spray pipe device.
Fig. 4 is the A-A sectional view of Fig. 3.
Fig. 5 is the B-B sectional view of Fig. 3.
Wherein: 1-spray supervisor; 2-spray arm; 3-spray smaller branch pipe; 4-spraying layer brace summer; 5-nozzle
L-spray supervisor both sides injector spacing; L1-adjacent nozzle spacing;
H-adjacent nozzle spray line intersects height; H '-nozzle ejection effective depth;
H-nozzle moves down height.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is elaborated:
As Fig. 3, shown in Fig. 4 and Fig. 5, the utility model spray equipment is fixed by spraying layer brace summer, spray equipment comprises spray supervisor 1, spray arm 2, spray smaller branch pipe 3, nozzle short tube and nozzle 5, spray supervisor 1 presses the uniform principle of nozzle 5, from spray supervisor 1 both sides, by certain spacing, stretch out spray arm 2, spray arm 2 and spray supervisor 1 downside stretch out contour spray smaller branch pipe 3 by certain spacing (with the uniform principle of nozzle), the height of spray smaller branch pipe 3 is advisable to have certain safe distance bottom the jet atomization streamline of nozzle 5 and spraying layer brace summer, avoid washing away.According to the layout of nozzle 5, both sides or a side of spray smaller branch pipe 3 bottoms are stretched out nozzle short tube, connect nozzle 5.
The utility model spray equipment, moves to spraying layer brace summer 4 by spray smaller branch pipe 3 from spray supervisor 1 plane nozzle ejection plane.

Claims (3)

1. a spray pipe device, comprise spray supervisor, spray arm, nozzle short tube and nozzle, described spray arm is connected on described spray supervisor, described nozzle is connected to the end of nozzle short tube and uniform in plane at spray, it is characterized in that: in described spray arm lower end, be also connected with respectively contour spray smaller branch pipe, described nozzle short tube is arranged on the lower end of described spray smaller branch pipe.
2. spray pipe device according to claim 1, is characterized in that: described spray arm is connected to described spray supervisor's both sides, in described spray supervisor lower end, is also provided with spray smaller branch pipe.
3. spray pipe device according to claim 1, is characterized in that: described nozzle short tube is arranged on the both sides of described spray smaller branch pipe lower end.
CN201320559523.0U 2013-09-10 2013-09-10 Spray pipe device Expired - Fee Related CN203458973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320559523.0U CN203458973U (en) 2013-09-10 2013-09-10 Spray pipe device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320559523.0U CN203458973U (en) 2013-09-10 2013-09-10 Spray pipe device

Publications (1)

Publication Number Publication Date
CN203458973U true CN203458973U (en) 2014-03-05

Family

ID=50171353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320559523.0U Expired - Fee Related CN203458973U (en) 2013-09-10 2013-09-10 Spray pipe device

Country Status (1)

Country Link
CN (1) CN203458973U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104645809A (en) * 2015-02-02 2015-05-27 江苏正通宏泰股份有限公司 Spray pipe device for desulfurizing absorption tower
CN105879646A (en) * 2015-07-27 2016-08-24 大唐环境产业集团股份有限公司 Connecting structure of slurry spray pipelines and nozzles of desulfurizing absorption tower
CN106091722A (en) * 2016-07-15 2016-11-09 大唐(北京)能源管理有限公司 A kind of plant condenser moisturizing atomization system
CN109045967A (en) * 2018-09-13 2018-12-21 苏州西热节能环保技术有限公司 A kind of spray ammonia conglomerate integration AIG for Gas Generator Set waste heat boiler
WO2022071327A1 (en) * 2020-10-02 2022-04-07 三菱重工業株式会社 Spray piping structure of flue gas desulfurization apparatus
CN116764426A (en) * 2023-08-22 2023-09-19 福建众辉环保设备有限公司 Spray tower liquid supply pipeline and spray tower

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104645809A (en) * 2015-02-02 2015-05-27 江苏正通宏泰股份有限公司 Spray pipe device for desulfurizing absorption tower
CN105879646A (en) * 2015-07-27 2016-08-24 大唐环境产业集团股份有限公司 Connecting structure of slurry spray pipelines and nozzles of desulfurizing absorption tower
CN106091722A (en) * 2016-07-15 2016-11-09 大唐(北京)能源管理有限公司 A kind of plant condenser moisturizing atomization system
CN106091722B (en) * 2016-07-15 2024-03-22 大唐环境产业集团股份有限公司 Water supplementing and atomizing system for condenser of power plant
CN109045967A (en) * 2018-09-13 2018-12-21 苏州西热节能环保技术有限公司 A kind of spray ammonia conglomerate integration AIG for Gas Generator Set waste heat boiler
CN109045967B (en) * 2018-09-13 2023-10-24 苏州西热节能环保技术有限公司 Ammonia spraying and mixing integrated AIG for waste heat boiler of gas unit
WO2022071327A1 (en) * 2020-10-02 2022-04-07 三菱重工業株式会社 Spray piping structure of flue gas desulfurization apparatus
CN116764426A (en) * 2023-08-22 2023-09-19 福建众辉环保设备有限公司 Spray tower liquid supply pipeline and spray tower
CN116764426B (en) * 2023-08-22 2023-11-03 福建众辉环保设备有限公司 Spray tower liquid supply pipeline and spray tower

Similar Documents

Publication Publication Date Title
CN203458973U (en) Spray pipe device
CN106669405B (en) Wet flue gas desulfurization purification system
CN202569948U (en) Absorption device for wet-process smoke desulfurization and denitrification
CN104474852A (en) Ammonia gas absorbing and treating device and absorbing method thereof
CN203577624U (en) Desulfurizing absorption tower
CN206252955U (en) A kind of pallet absorber desulfurization device
CN204710098U (en) A kind of stable desulfurizing tower energy-conservation again
CN204619719U (en) A kind of baffling absorption tower for ammonia desulfurizing process
CN203061032U (en) Tail gas absorbing device
CN206483267U (en) A kind of duct type gas treatment equipment
CN104492641A (en) High-efficiency atomized capturing spray chamber
CN203829906U (en) Anti-abrasion and diversion wet flue gas desulfurization spray tower
CN204093295U (en) A kind of desulfurizing tower import sprayer unit
CN203955022U (en) Rapid flushing washed flue-gas dust-removing and desulfurization device
CN206652358U (en) A kind of desulfurization downstream injection absorption equipment
CN202638256U (en) Rotational flow double-alkali method desulfurization device
CN109226141A (en) A kind of anti-blocking snaking instrument of DS- multiphase desulfurizing tower
CN206215028U (en) A kind of desulfuration absorbing tower
CN112221315A (en) Wet desulphurization absorption tower
CN104888586B (en) Method and device for flue gas desulfurization by two times of seawater washing
CN203803368U (en) Tail gas absorbing tower capable of improving acid-alkali liquid mixing effect
CN209061777U (en) A kind of anti-blocking snaking instrument of DS- multiphase desulfurizing tower
CN109351168B (en) Flue gas desulfurization device
CN204583568U (en) There is the paint spray booth of double atomization coating cloud capturing structure
CN204247064U (en) A kind of smoke absorption tower of gas-liquid bidirectional guide

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171115

Address after: Shuige road Changsheng street in Jiangning District of Nanjing City, Jiangsu Province, No. 2 211100

Patentee after: NANJING DINGHUAN NEW ENERGY SCIENCE AND TECHNOLOGY CO.,LTD.

Address before: Dong Village Road, Jiangning Development Zone, Nanjing City, Jiangsu Province, No. 87 210008

Patentee before: CHINA CONSTRUCTION POWER AND ENVIRONMENT ENGINEERING CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190313

Address after: No. 87 Dongcun Road, Jiangning Development Zone, Nanjing City, Jiangsu Province, 210008

Patentee after: CHINA CONSTRUCTION POWER AND ENVIRONMENT ENGINEERING CO.,LTD.

Address before: 211100 No. 2 Changsheng Street, Shuige Road, Jiangning District, Nanjing City, Jiangsu Province

Patentee before: NANJING DINGHUAN NEW ENERGY SCIENCE AND TECHNOLOGY CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140305