CN203452840U - Coal mine gas drainage structure with high-position drainage drill site and drill holes - Google Patents

Coal mine gas drainage structure with high-position drainage drill site and drill holes Download PDF

Info

Publication number
CN203452840U
CN203452840U CN201320514948.XU CN201320514948U CN203452840U CN 203452840 U CN203452840 U CN 203452840U CN 201320514948 U CN201320514948 U CN 201320514948U CN 203452840 U CN203452840 U CN 203452840U
Authority
CN
China
Prior art keywords
drill site
height
taken out
gas drainage
drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320514948.XU
Other languages
Chinese (zh)
Inventor
李海贵
张国亮
李树军
申晋伟
贾智慧
赵学良
陈备
罗华贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201320514948.XU priority Critical patent/CN203452840U/en
Application granted granted Critical
Publication of CN203452840U publication Critical patent/CN203452840U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to the field of pressure relief gas drainage in an entitative coal seam and a neighboring seam and accumulated gas drainage in a goaf, particularly relates to a coal mine gas drainage structure with a high-position drainage drill site and drill holes and solves the problem of accumulated gas drainage. The coal mine gas drainage structure with the high-position drainage drill site and the drill holes comprises a ventilation roadway and an intake airflow roadway; a connection roadway is communicated between the ventilation roadway and the intake airflow roadway; the connection roadway is provided with an inclined drift; one end of the inclined drift is provided with the high-position drainage drill site; a row of drill holes are arranged in the high-position drainage drill site. The coal mine gas drainage structure with the high-position drainage drill site and the drill holes effectively solves the problem of accumulated gas drainage and is suitable for pressure relief gas drainage in the entitative coal seam and the neighboring seam and accumulated gas drainage in the goaf.

Description

The high drilling holes at the drilling yard gas drainage under suction structure of taking out in colliery
Technical field
The utility model belongs to this coal seam, adjacent layer gas pressure relief, accumulated methane extraction field, goaf, specifically the high drilling holes at the drilling yard gas drainage under suction structure of taking out in a kind of colliery.
Background technology
Highly gassy mine fully-mechanized mining working gas emission is large, and gas source is mainly goaf gas, and goaf gas is gushed out and mainly adjacent layer gas pressure relief and Residual coal in goaf gas, consisted of.Goaf gas is carried out to extraction, can reduce the gas amount of coal-face, be conducive to safety in production.Generally used in recent years goaf pipe laying, High Position Drilling, high-order lane, height to take out the modes such as drill site goaf gas is carried out to extraction.Pipe laying method is generally laid the pre-buried pipeline of goaf gas drainage at return airway, on pipeline, every a tee piece of a segment distance serial connection, (at tee piece, not yet enter before goaf, its open to atmosphere one end blocks with flange), as the air entry of goaf gas drainage.High Position Drilling be at air way to roof construction drill, Main Function is to using the gas that top board crack that working face extraction mining pressure forms comes extraction working face wall and upper corner to gush out as passage.High-order lane is arranged in top board fissure zone, and when top board is for the first time across backwardness, mobile along crack to goaf by the gas of adjacent layer and country rock desorb, high-order lane can be extracted the next layer gas out.
Summary of the invention
The utility model, in order to solve the problem of accumulated methane extraction, provides a kind of colliery the high drilling holes at the drilling yard gas drainage under suction structure of taking out especially.
In order to address the above problem, the utility model is taked following technical scheme: the high drilling holes at the drilling yard gas drainage under suction structure of taking out in a kind of colliery, comprise return airway and air intake lane, between return airway and air intake lane, be communicated with the horizontal river of contact, get in touch with horizontal river and be provided with inclined gallery, one end, inclined gallery is provided with height and takes out drill site, and height is taken out and in drill site, is furnished with a row hole drilling.
Described, height is taken out boring in drill site and is inverted U-shaped and is furnished with 16, and height is taken out in drill site and inclined gallery and is filled with chemical material.
Described, 1.5 meters of drillhole heights, 54~138 meters of drilling depths, aperture 94mm, inclination angle, 187 °~337 °, azimuth is that level is faced upward 3.31 °~8.4 °, and height is taken out about drill site two and helped 0.8 meter of the spacing of wells, and it is 10 meters that height is taken out the drill site left and right two whole pitch of holes of helping to hole, height is taken out 0.7 meter of the drill site center spacing of wells, and the whole pitch of holes of boring that height is taken out drill site center is 30 meters.
The utility model has solved the problem of accumulated methane extraction effectively, is applicable to this coal seam, adjacent layer gas pressure relief, goaf accumulated methane extraction.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is that height is taken out drill site sectional view;
The high drilling holes at the drilling yard arrangement diagram of taking out of Fig. 3
1-air intake lane in figure, 2-gets in touch with horizontal river, 3-return airway, the high drill site of taking out of 4-, 5-inclined gallery.
The specific embodiment
The Shanxi Province's coal bed gas joint study Projects With Nsfc Aid 2012012009 of take is example, as shown in Figure 1, the high drilling holes at the drilling yard gas drainage under suction structure of taking out in a kind of colliery, comprise return airway 3 and air intake lane 1, between return airway 3 and air intake lane 1, be communicated with the horizontal river 2 of contact, get in touch with horizontal river 2 and be provided with height and take out drill site 4, height is taken out and in drill site 4, is furnished with a row hole drilling.By return airway, to air intake lane vertical direction, press 30 ° of climbing construction inclined gallery, the 6 meters of gallery cloth of then constructing set high takes out drill site 4, and height is taken out brill, and 4 are positioned at 12 meters of roof tops.It is wide 4 meters that height is taken out drill site 4, high 2.5 meters, and inclined gallery are wide 2 meters, high 2.5 meters, and long 26 meters, height is taken out the right side of drill site and air intake lane at a distance of 3 meters.
Height is taken out boring in drill site 4 and is inverted U-shaped and is furnished with 16, and height is taken out in drill site 4 and inclined gallery 5 and is filled with chemical material.
1.5 meters of drillhole heights, 54~138 meters of drilling depths, aperture 94mm, inclination angle, 187 °~337 °, azimuth is that level is faced upward 3.31 °~8.4 °, height is taken out drill site 4 left and right two and is helped 0.8 meter of the spacing of wells, it is 10 meters that height is taken out the drill site 4 left and right two whole pitch of holes of helping to hole, and height is taken out 0.7 meter of the drill site 4 center spacing of wells, and the whole pitch of holes of boring that height is taken out drill site 4 centers is 30 meters.

Claims (3)

1. the high drilling holes at the drilling yard gas drainage under suction structure of taking out in colliery, comprise return airway (3) and air intake lane (1), between return airway (3) and air intake lane (1), be communicated with contact horizontal river (2), it is characterized in that: get in touch with horizontal river (2) and be provided with inclined gallery (5), one end, inclined gallery (5) is provided with height and takes out drill site (4), and height is taken out in drill site (4) and is furnished with a row hole drilling.
2. the high drilling holes at the drilling yard gas drainage under suction structure of taking out in colliery according to claim 1, is characterized in that: height is taken out boring in drill site (4) and is inverted U-shaped and is furnished with 16, and height is taken out in drill site (4) and inclined gallery (5) and is filled with chemical material.
3. the high drilling holes at the drilling yard gas drainage under suction structure of taking out in colliery according to claim 1 and 2, it is characterized in that: 1.5 meters of drillhole heights, 54~138 meters of drilling depths, aperture 94mm, inclination angle, 187 °~337 °, azimuth is that level is faced upward 3.31 °~8.4 °, and height is taken out about drill site (4) two and helped 0.8 meter of the spacing of wells, and it is 10 meters that height is taken out drill site (4) the left and right two whole pitch of holes of helping to hole, height is taken out 0.7 meter of drill site (4) the center spacing of wells, and the whole pitch of holes of boring that height is taken out drill site (4) center is 30 meters.
CN201320514948.XU 2013-08-22 2013-08-22 Coal mine gas drainage structure with high-position drainage drill site and drill holes Expired - Lifetime CN203452840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320514948.XU CN203452840U (en) 2013-08-22 2013-08-22 Coal mine gas drainage structure with high-position drainage drill site and drill holes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320514948.XU CN203452840U (en) 2013-08-22 2013-08-22 Coal mine gas drainage structure with high-position drainage drill site and drill holes

Publications (1)

Publication Number Publication Date
CN203452840U true CN203452840U (en) 2014-02-26

Family

ID=50132724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320514948.XU Expired - Lifetime CN203452840U (en) 2013-08-22 2013-08-22 Coal mine gas drainage structure with high-position drainage drill site and drill holes

Country Status (1)

Country Link
CN (1) CN203452840U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104948167A (en) * 2015-07-15 2015-09-30 贵州盘江精煤股份有限公司 Method for observing single-hole gas concentration after seal of high-location drilling field of return airway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104948167A (en) * 2015-07-15 2015-09-30 贵州盘江精煤股份有限公司 Method for observing single-hole gas concentration after seal of high-location drilling field of return airway
CN104948167B (en) * 2015-07-15 2018-03-13 贵州盘江精煤股份有限公司 A kind of method of observation single hole gas density after return airway high position drill site is closed

Similar Documents

Publication Publication Date Title
CN103437803A (en) Structure and method for gas drainage of drill holes of high-drainage drill field of coal mine
CN103758559B (en) Gob-side entry retaining Y-type ventilation high position return airway hole pumping and mining gas method
CN102635392B (en) Co-extraction method for pillar-less coal and gas of advanced entry-retaining construction extraction engineering
CN101251028A (en) Method for taking out and picking high gassy seam group dislodging gob-side entry retaining Y type ventilated decompression firedamp
CN104481536B (en) Cover rock crack and surface subsidence controlled digging, mining and filling parallel operation coal mining method
CN102392678A (en) Gas drainage method combining surface and underground fracturing and permeability improvement
CN100356036C (en) Method for pumping out gas from mining coal layer roof
CN104131831A (en) Coal-bed gas well vertical three-dimensional united extraction method
CN103883304B (en) A kind of gasifying underground coal method building gasification furnace passage
CN104564072A (en) Complete non-coal-pillar continuous depressurized mining method for close-distance coal seam groups
WO2017101634A1 (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN104047629B (en) The method that thin coal bed fully-mechanized mining gob side entry retaining directional drilling extraction closes on lower coal-bed gas
CN102337919A (en) Four-period-five-purpose hole-drilling high-efficiency gas extracting process
CN103277129B (en) One prevents Top Corner Gas on Coal Face to transfinite technology
CN104975868A (en) Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling
CN103362539A (en) Method for extracting pressure relief gas by retained roadway drill site drilling
CN102162367A (en) Arrangement method for gas drainage drill sites of highly-gassy fully-mechanized top-coal caving surface
CN111022108A (en) Method for extracting gas in goaf
WO2022242056A1 (en) Method for implementing continuous extraction of gas by high-position drilling in working face stoping process
CN105239964A (en) Protective coal seam decompressing ground and underground three-dimensional coal and coal seam gas coordinated development method
CN104564127A (en) Method for extracting gas in coal seams under overlying hung thick igneous rocks
CN104989330A (en) Coalbed gas recovery method
CN106014345B (en) A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed
CN204327172U (en) Formula boring goaf extraction structure before and after high-rise position
CN105971563A (en) Extraction method for coal bed gas in composite old mined-out area formed through lower tool post method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140226